4 resultados para Cost Control

em Universidade do Minho


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia e Gestão Industrial

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, many P2P applications proliferate in the Internet. The attractiveness of many of these systems relies on the collaborative approach used to exchange large resources without the dependence and associated constraints of centralized approaches where a single server is responsible to handle all the requests from the clients. As consequence, some P2P systems are also interesting and cost-effective approaches to be adopted by content-providers and other Internet players. However, there are several coexistence problems between P2P applications and In- ternet Service Providers (ISPs) due to the unforeseeable behavior of P2P traffic aggregates in ISP infrastructures. In this context, this work proposes a collaborative P2P/ISP system able to underpin the development of novel Traffic Engi- neering (TE) mechanisms contributing for a better coexistence between P2P applications and ISPs. Using the devised system, two TE methods are described being able to estimate and control the impact of P2P traffic aggregates on the ISP network links. One of the TE methods allows that ISP administrators are able to foresee the expected impact that a given P2P swarm will have in the underlying network infrastructure. The other TE method enables the definition of ISP friendly P2P topologies, where specific network links are protected from P2P traffic. As result, the proposed system and associated mechanisms will contribute for improved ISP resource management tasks and to foster the deployment of innovative ISP-friendly systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper deals with the problem of estimation maintenance costs for the case of the pitch controls system of wind farms turbines. Previous investigations have estimated these costs as (traditional) “crisp” values, simply ignoring the uncertainty nature of data and information available. This paper purposes an extended version of the estimation model by making use of the Fuzzy Set Theory. The results alert decision-makers to consequent uncertainty of the estimations along with their overall level, thus improving the information given to the mainte-nance support system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

COST Action TU1406 aims to address the European economic and societal needs by standardizing the condition assessment and maintenance level of roadway bridges. Currently, bridge quality control plans vary from country to country and, in some cases, within the same country. This therefore urges the establishment of a European guideline to surpass the lack of a standard methodology to assess bridge condition and to define quality control plans for roadway bridges. Such a guideline will comprise specific recommendations for assessing performance indicators as well as for the definition of performance goals, bringing together different stakeholders (e.g. universities, institutes, operators, consultants and owners) from various scientific disciplines (e.g. on-site testing, visual inspection, structural engineering, sustainability, etc.) in order to establish a common transnational language. COST Action TU1406 Workshops aim to facilitate the exchange of ideas and experiences between active researchers and practitioners as well as to stimulate discussions on new and emerging issues in line with the conference topics. This first Workshop essentially focuses on WG1 issues, namely, intends to address performance indicators, how these are assessed (e.g. visual inspection, nondestructive tests and monitoring systems), with what frequency and what values are generally obtained. The main outcomes, given in this eBook, were really important, not only for WG1 developments, but also for all the other WGs and for the Action itself.