30 resultados para Inter-firm Project
Resumo:
Coagulase-negative staphylococci (CoNS) are common bacterial colonisers of the human skin. They are often involved in nosocomial infections due to biofilm formation in indwelling medical devices. While biofilm formation has been extensively studied in Staphylococcus epidermidis, little is known regarding other CoNS species. Here, biofilms from six different CoNS species were characterised in terms of biofilm composition and architecture. Interestingly, the ability to form a thick biofilm was not associated with any particular species, and high variability on biofilm accumulation was found within the same species. Cell viability assays also revealed different proportions of live and dead cells within biofilms formed by different species, although this parameter was particularly similar at the intra-species level. On the other hand, biofilm disruption assays demonstrated important inter- and intra-species differences regarding extracellular matrix composition. Lastly, confocal laser scanning microscopy (CLSM) experiments confirmed this variability, highlighting important differences and common features of CoNS biofilms. We hypothesised that the biofilm formation heterogeneity observed was rather associated with biofilm matrix composition than with cells themselves. Additionally, our results indicate that polysaccharides, DNA and proteins are fundamental pieces in the process of CoNS biofilm formation.
Resumo:
Social intelligence is a favorable condition for career decision-making and development. The social intelligence indices of Portuguese students in school years prior to a career transition are characterized and intra and interindividual differences are analyzed. Participants were 1095 students (552, 50.4% women) with a mean age of 14.78 years (SD = 1.86), in the 8th (542, 49.5%), 10th (295, 26.9%) and 11th (258, 23.6%) grades. The Cognitive Test of Social Intelligence (PCIS) was administered at two moments, six months apart. Results indicate that the 8th grade obtained higher average scores in Problem Solving, Motivation and Self-confidence (time 1), while the 10th grade obtained better results in Problem Solving, Motivation and Familiarity (time 2). Between the assessment moments, all school years register an increase in Problem Solving and Self-confidence in social situations. These results constitute favorable psychological conditions for the promotion of ethical questioning in career guidance interventions.
Resumo:
Projeto de estágio de mestrado em Economia Industrial e da Empresa
Resumo:
Since concrete is the most widely utilized construction material, several solutions are currently being developed and investigated for enhancing the sustainability of cementitious materials. One of these solutions is based on producing Recycled Concrete Aggregates (RCA) from existing concrete members resulting by either industrial processes or demolitions of existing structures as a whole. Moreover, waste resulting from industrial processes other than the building construction (i.e., tire recycling, production of steel, powders resulting from other depuration processes) are also being considered as possible low-impact constituents for producing structural concrete and Fiber-Reinforced Cementitious Composites (FRCC). Furthermore, the use of natural fibers is another option for producing environmentally-friendly and cost-effective materials, depending on the local availability of raw materials. To promote the use of concretes partially composed of recycled constituents, their influence on the mechanical and durability performance of these concretes have to be deeply investigated and correlated. This was the main goal of the EnCoRe Project (www.encore-fp7.unisa.it), a EU-funded initiative, whose activities and main findings are summarized in this paper.
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
O objetivo deste trabalho é apresentar os resultados da análise das concepções de dois protagonistas de uma reforma curricular que está sendo implementada numa escola de engenharia. A principal característica do novo currículo é o uso de projetos e oficinas como atividades complementares a serem realizadas pelos estudantes. As atividades complementares acontecerão em paralelo ao trabalho realizado nas disciplinas sem que haja uma relação de interdisciplinaridade. O novo currículo está sendo implantado desde fevereiro de 2015. Segundo Pacheco (2005) há dois momentos, dentre outros, no processo de mudança curricular, o currículo “ideal”, determinado por dimensões epistemológica, política, econômica, ideológica, técnica, estética, e histórica e, que recebe influência direta daquele que idealiza e cria o novo currículo e, o currículo “formal” que se traduz na prática implementada na escola. São essas duas etapas estudadas nesta pesquisa. Para isso serão considerados como fontes de dados dois protagonistas, um mais ligado à concepção do currículo e outro da sua implementação, a partir dos quais se busca compreender as motivações, crenças e percepções que, por sua vez, determinam a reforma curricular. Entrevistas semiestruturadas foram utilizadas como técnica de pesquisa, com o propósito de se entender a gênese da proposta e as mudanças entre essas duas etapas. Os dados revelam que mudanças aconteceram desde a idealização até a formalização do currículo, motivadas por demandas do processo de implementação, revela ainda diferenças na visão de currículo e a motivação para romper com padrões na formação de engenheiros no Brasil.
Resumo:
A ideia de que as Matemáticas de Portugal (e de Espanha) atravessaram, depois de um período áureo nos Descobrimentos, um longo deserto onde não foi possível florescerem Mestres, nem escolas, nem cultura científica, nem investigação de relevo foi, durante muito tempo, reiteradamente veiculada, inclusivé através de alguns dos nossos mais referenciados historiadores da Matemática, como é o caso de Gomes Teixeira ou de Rey Pastor. Mas a verdade é que o estudo da História das Matemáticas em Portugal tem, na última década, vivido um interesse crescente onde sobressaem, em particular, uma leitura menos enviesada sobre, por exemplo, o papel educativo dos Jesuítas ou a publicação das obras completas de Pedro Nunes. Está-se assim a contribuir para uma compreensão mais completa da História geral de Portugal, de que a História da Ciência e da Cultura faz parte. José Anastácio da Cunha (1744-1787) foi figura de proa no século XVIII português. Sabíamo-lo matemático que, sem nunca ter saído de Portugal, havia sido capaz de antecipar, em mais de 50 anos, os esforços de matemáticos franceses e alemães para fundar a Matemática com rigor. Sabíamo-lo também autor de uma vasta e diversificada obra de inegável importância matemática mas, igualmente, autor de textos poéticos. Agora, com o projecto que denominámos de MAT2, centramo-nos em José Anastácio da Cunha e pretendemos, se possível, ir ainda mais além. Partimos de uma descoberta, árdua mas com final feliz, em um Arquivo de família: o da Casa de Mateus. Sentimo-nos, com esta “sorte”, privilegiados e gratos por nos ter sido gentilmente concedido o acesso a um vasto conjunto de documentos únicos (diários de viagens, notas de aulas e correspondência) que incluem memórias autógrafas e inéditas de Anastácio da Cunha. Organizámo-nos, cientes do trabalho árduo que temos pela frente, multi e interdisciplinarmente englobando a Matemática (nas suas múltiplas especializações) e a História (incluindo a da Matemática) mas também contando com a Física, a Informática, os estudos militares ou a Arquivística e as Humanidades; reunimos académicos, mais e menos veteranos, com investigadores jovens e juntámos valências nacionais e estrangeiras. No presente artigo daremos conta do percurso trilhado, até agora, pelo projecto MAT2.
Resumo:
Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.
Resumo:
The International Energy Agency established an Implementing Agreement within the Energy in Buildings and Communities Program to undertake research and provide an international focus on Cost Effective Energy and Carbon Emissions Optimization in Building Renovation (EBC Annex 56). The project aims at developing a new methodology to enable cost effective renovation of existing buildings while optimizing energy consumption and carbon emissions reduction. Gathering of case studies is one of the activities undertaken to reach the overall project. Of the case studies a selection of â Shining Examplesâ is made to encourage decision makers to promote efficient and cost effective renovations. This paper presents the results of the analyses made on the Shining Examples.
Resumo:
Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.
Resumo:
The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.
Resumo:
Increasing the maturity in Project Management (PM) has become a goal for many organizations, leading them to adopt maturity models to assess the current state of its PM practices and compare them with the best practices in the industry where the organization is inserted. One of the main PM maturity models is the Organizational Project Management Maturity Model (OPM3®), developed by the Project Management Institute. This paper presents the Information Systems and Technologies organizations outcome analysis, of the assesses made by the OPM3® Portugal Project, identifying the PM processes that are “best” implemented in this particular industry and those in which it is urgent to improve. Additionally, a comparison between the different organizations’ size analyzed is presented.
Resumo:
Gold nanoparticles were dispersed in two different dielectric matrices, TiO2 and Al2O3, using magnetron sputtering and a post-deposition annealing treatment. The main goal of the present work was to study how the two different host dielectric matrices, and the resulting microstructure evolution (including both the nanoparticles and the host matrix itself) promoted by thermal annealing, influenced the physical properties of the films. In particular, the structure and morphology of the nanocomposites were correlated with the optical response of the thin films, namely their localized surface plasmon resonance (LSPR) characteristics. Furthermore, and in order to scan the future application of the two thin film system in different types of sensors (namely biological ones), their functional behaviour (hardness and Young's modulus change) was also evaluated. Despite the similar Au concentrations in both matrices (~ 11 at.%), very different microstructural features were observed, which were found to depend strongly on the annealing temperature. The main structural differences included: (i) the early crystallization of the TiO2 host matrix, while the Al2O3 one remained amorphous up to 800 °C; (ii) different grain size evolution behaviours with the annealing temperature, namely an almost linear increase for the Au:TiO2 system (from 3 to 11 nm), and the approximately constant values observed in the Au:Al2O3 system (4–5 nm). The results from the nanoparticle size distributions were also found to be quite sensitive to the surrounding matrix, suggesting different mechanisms for the nanoparticle growth (particle migration and coalescence dominating in TiO2 and Ostwald ripening in Al2O3). These different clustering behaviours induced different transmittance-LSPR responses and a good mechanical stability, which opens the possibility for future use of these nanocomposite thin film systems in some envisaged applications (e.g. LSPR-biosensors).
Resumo:
Dissertação de mestrado em Engenharia e Gestão da Qualidade