Recently, efficient scheduling algorithms based on Lagrangian relaxation have been proposed for scheduling parallel machine systems and job shops. In this article, we develop real-world extensions to these scheduling methods. In the first part of the paper, we consider the problem of scheduling single operation jobs on parallel identical machines and extend the methodology to handle multiple classes of jobs, taking into account setup times and setup costs, The proposed methodology uses Lagrangian relaxation and simulated annealing in a hybrid framework, In the second part of the paper, we consider a Lagrangian relaxation based method for scheduling job shops and extend it to obtain a scheduling methodology for a real-world flexible manufacturing system with centralized material handling.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper considers two special cases of bottleneck grouped assignment problems when n jobs belong to m distinct categories (m < n). Solving these special problems through the available branch and bound algorithms will result in a heavy computational burden. Sequentially identifying nonopitmal variables, this paper provides more efficient methods for those cases. Propositions leading to the algorithms have been established. Numerical examples illustrate the respective algorithms.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Absenteeism is one of the major problems of Indian industries. It necessitates the employment of more manpower than the jobs require, resulting in the increase of manpower costs, and lowers the efficiency of plant operation through lowered performance and higher rejects. It also causes machine idleness, if extra manpower is not hired, resulting in disrupted work schedules and assignments. Several studies have investigated the causes of absenteeism (Vaid 1967) for example and their remedy and relationship between absenteeism and turnover with a suggested model for diagnosis and treatment (Hawk 1976) However, the production foremen and supervisor will face the operating task of determining how many extra operatives are to be hired in order to stave off the adverse effects of absenteeism on the man-machine system. This paper deals with a class of reserve manpower models based on the reject allowance model familiar in quality control literature. The present study considers, in addition to absenteeism, machine failures and the graded nature of manpower met within production systems and seeks to find optimal reserve manpower through computer simulation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we consider the bi-criteria single machine scheduling problem of n jobs with a learning effect. The two objectives considered are the total completion time (TC) and total absolute differences in completion times (TADC). The objective is to find a sequence that performs well with respect to both the objectives: the total completion time and the total absolute differences in completion times. In an earlier study, a method of solving bi-criteria transportation problem is presented. In this paper, we use the methodology of solvin bi-criteria transportation problem, to our bi-criteria single machine scheduling problem with a learning effect, and obtain the set of optimal sequences,. Numerical examples are presented for illustrating the applicability and ease of understanding.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The time minimising assignment problem is the problem of finding an assignment of n jobs to n facilities, one to each, which minimises the total time for completing all the jobs. The usual assumption made in these problems is that all the jobs are commenced simultaneously. In this paper two generalisations of this assumption are considered, and algorithms are presented to solve these general problems. Numerical examples are worked out illustrating the algorithms.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We study the problem of matching applicants to jobs under one-sided preferences: that is, each applicant ranks a non-empty subset of jobs under an order of preference, possibly involving ties. A matching M is said to be rnore popular than T if the applicants that prefer M to T outnumber those that prefer T to M. A matching is said to be popular if there is no matching more popular than it. Equivalently, a matching M is popular if phi(M,T) >= phi(T, M) for all matchings T, where phi(X, Y) is the number of applicants that prefer X to Y. Previously studied solution concepts based oil the popularity criterion are either not guaranteed to exist for every instance (e.g., popular matchings) or are NP-hard to compute (e.g., least unpopular matchings). This paper addresses this issue by considering mixed matchings. A mixed matching is simply a probability distributions over matchings in the input graph. The function phi that compares two matchings generalizes in a natural manner to mixed matchings by taking expectation. A mixed matching P is popular if phi(P,Q) >= phi(Q,P) for all mixed matchings Q. We show that popular mixed matchings always exist. and we design polynomial time algorithms for finding them. Then we study their efficiency and give tight bounds on the price of anarchy and price of stability of the popular matching problem.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A Batch Processing Machine (BPM) is one which processes a number of jobs simultaneously as a batch with common beginning and ending times. Also, a BPM, once started cannot be interrupted in between (Pre-emption not allowed). This research is motivated by a BPM in steel casting industry. There are three main stages in any steel casting industry viz., pre-casting stage, casting stage and post-casting stage. A quick overview of the entire process, is shown in Figure 1. There are two BPMs : (1) Melting furnace in the pre-casting stage and (2) Heat Treatment Furnace (HTF) in the post casting stage of steel casting manufacturing process. This study focuses on scheduling the latter, namely HTF. Heat-treatment operation is one of the most important stages of steel casting industries. It determines the final properties that enable components to perform under demanding service conditions such as large mechanical load, high temperature and anti-corrosive processing. In general, different types of castings have to undergo more than one type of heat-treatment operations, where the total heat-treatment processing times change. To have a better control, castings are primarily classified into a number of job-families based on the alloy type such as low-alloy castings and high alloy castings. For technical reasons such as type of alloy, temperature level and the expected combination of heat-treatment operations, the castings from different families can not be processed together in the same batch.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study considers the scheduling problem observed in the burn-in operation of semiconductor final testing, where jobs are associated with release times, due dates, processing times, sizes, and non-agreeable release times and due dates. The burn-in oven is modeled as a batch-processing machine which can process a batch of several jobs as long as the total sizes of the jobs do not exceed the machine capacity and the processing time of a batch is equal to the longest time among all the jobs in the batch. Due to the importance of on-time delivery in semiconductor manufacturing, the objective measure of this problem is to minimize total weighted tardiness. We have formulated the scheduling problem into an integer linear programming model and empirically show its computational intractability. Due to the computational intractability, we propose a few simple greedy heuristic algorithms and meta-heuristic algorithm, simulated annealing (SA). A series of computational experiments are conducted to evaluate the performance of the proposed heuristic algorithms in comparison with exact solution on various small-size problem instances and in comparison with estimated optimal solution on various real-life large size problem instances. The computational results show that the SA algorithm, with initial solution obtained using our own proposed greedy heuristic algorithm, consistently finds a robust solution in a reasonable amount of computation time.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present work concerns with the static scheduling of jobs to parallel identical batch processors with incompatible job families for minimizing the total weighted tardiness. This scheduling problem is applicable in burn-in operations and wafer fabrication in semiconductor manufacturing. We decompose the problem into two stages: batch formation and batch scheduling, as in the literature. The Ant Colony Optimization (ACO) based algorithm called ATC-BACO algorithm is developed in which ACO is used to solve the batch scheduling problems. Our computational experimentation shows that the proposed ATC-BACO algorithm performs better than the available best traditional dispatching rule called ATC-BATC rule.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The author presents adaptive control techniques for controlling the flow of real-time jobs from the peripheral processors (PPs) to the central processor (CP) of a distributed system with a star topology. He considers two classes of flow control mechanisms: (1) proportional control, where a certain proportion of the load offered to each PP is sent to the CP, and (2) threshold control, where there is a maximum rate at which each PP can send jobs to the CP. The problem is to obtain good algorithms for dynamically adjusting the control level at each PP in order to prevent overload of the CP, when the load offered by the PPs is unknown and varying. The author formulates the problem approximately as a standard system control problem in which the system has unknown parameters that are subject to change. Using well-known techniques (e.g., naive-feedback-controller and stochastic approximation techniques), he derives adaptive controls for the system control problem. He demonstrates the efficacy of these controls in the original problem by using the control algorithms in simulations of a queuing model of the CP and the load controls.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We consider the problem of matching people to jobs, where each person ranks a subset of jobs in an order of preference, possibly involving ties. There are several notions of optimality about how to best match each person to a job; in particular, popularity is a natural and appealing notion of optimality. However, popular matchings do not always provide an answer to the problem of determining an optimal matching since there are simple instances that do not adroit popular matchings. This motivates the following extension of the popular rnatchings problem:Given a graph G; = (A boolean OR J, E) where A is the set of people and J is the set of jobs, and a list < c(1), c(vertical bar J vertical bar)) denoting upper bounds on the capacities of each job, does there exist (x(1), ... , x(vertical bar J vertical bar)) such that setting the capacity of i-th, job to x(i) where 1 <= x(i) <= c(i), for each i, enables the resulting graph to admit a popular matching. In this paper we show that the above problem is NP-hard. We show that the problem is NP-hard even when each c is 1 or 2.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A model comprising several servers, each equipped with its own queue and with possibly different service speeds, is considered. Each server receives a dedicated arrival stream of jobs; there is also a stream of generic jobs that arrive to a job scheduler and can be individually allocated to any of the servers. It is shown that if the arrival streams are all Poisson and all jobs have the same exponentially distributed service requirements, the probabilistic splitting of the generic stream that minimizes the average job response time is such that it balances the server idle times in a weighted least-squares sense, where the weighting coefficients are related to the service speeds of the servers. The corresponding result holds for nonexponentially distributed service times if the service speeds are all equal. This result is used to develop adaptive quasi-static algorithms for allocating jobs in the generic arrival stream when the load parameters are unknown. The algorithms utilize server idle-time measurements which are sent periodically to the central job scheduler. A model is developed for these measurements, and the result mentioned is used to cast the problem into one of finding a projection of the root of an affine function, when only noisy values of the function can be observed

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We consider the problem of minimizing the total completion time on a single batch processing machine. The set of jobs to be scheduled can be partitioned into a number of families, where all jobs in the same family have the same processing time. The machine can process at most B jobs simultaneously as a batch, and the processing time of a batch is equal to the processing time of the longest job in the batch. We analyze that properties of an optimal schedule and develop a dynamic programming algorithm of polynomial time complexity when the number of job families is fixed. The research is motivated by the problem of scheduling burn-in ovens in the semiconductor industry

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We study the problem of minimizing total completion time on single and parallel batch processing machines. A batch processing machine is one which can process up to B jobs simultaneously. The processing time of a batch is equal to the largest processing time among all jobs in the batch. This problem is motivated by burn-in operations in the final testing stage of semiconductor manufacturing and is expected to occur in other production environments. We provide an exact solution procedure for the single-machine problem and heuristic algorithms for both single and parallel machine problems. While the exact algorithms have limited applicability due to high computational requirements, extensive experiments show that the heuristics are capable of consistently obtaining near-optimal solutions in very reasonable CPU times.