2 resultados para financial capacity building
em Indian Institute of Science - Bangalore - Índia
Resumo:
The high level of public accountability attached to Public Sector Enterprises as a result of public ownership makes them socially responsible. The Committee of Public Undertakings in 1992 examined the issue relating to social obligations of Central Public Sector Enterprises and observed that ``being part of the `State', every Public Sector enterprise has a moral responsibility to play an active role in discharging the social obligations endowed on a welfare state, subject to the financial health of the enterprise''. It issued the Corporate Social Responsibility Guidelines in 2010 where all Central Public Enterprises, through a Board Resolution, are mandated to create a CSR budget as a specified percentage of net profit of the previous year. This paper examines the CSR activities of the biggest engineering public sector organization in India, Bharath Heavy Electricals Limited. The objectives are twofold, one, to develop a case study of the organization about the funds allocated and utilized for various CSR activities, and two, to examine its status with regard to other organizations, the 2010 guidelines, and the local socio-economic development. Secondary data analysis results show three interesting trends. One, it reveals increasing organizational social orientation with the formal guidelines in place. Two, Firms can no longer continue to exploit environmental resources and escape from their responsibilities by acting separate entities regardless of the interest of the society and Three the thrust of CSR in public sector is on inclusive growth, sustainable development and capacity building with due attention to the socio-economic needs of the neglected and marginalized sections of the society.
Resumo:
The paper reports the operational experience from a 100 kWe gasification power plant connected to the grid in Karnataka. Biomass Energy for Rural India (BERI) is a program that implemented gasification based power generation with an installed capacity of 0.88 MWe distributed over three locations to meet the electrical energy needs in the district of Tumkur. The operation of one 100 kWe power plant was found unsatisfactory and not meeting the designed performance. The Indian Institute of Science, Bangalore, the technology developer, took the initiative to ensure the system operation, capacity building and prove the designed performance. The power plant connected to the grid consists of the IISc gasification system which includes reactor, cooling, cleaning system, fuel drier and water treatment system to meet the producer gas quality for an engine. The producer gas is used as a fuel in Cummins India Limited, GTA 855 G model, turbo charged engine and the power output is connected to the grid. The system has operated for over 1000 continuous hours, with only about 70 h of grid outages. The total biomass consumption for 1035 h of operation was 111 t at an average of 107 kg/h. Total energy generated was 80.6 MWh reducing over loot of CO(2) emissions. The overall specific fuel consumption was about 1.36 kg/kWh, amounting to an overall efficiency from biomass to electricity of about 18%. The present operations indicate that a maintenance schedule for the plant can be at the end of 1000 h. The results for another 1000 h of operation by the local team are also presented. (C) 2011 International Energy Initiative. Published by Elsevier Inc. All rights reserved.