3 resultados para War and emergency legislation

em Indian Institute of Science - Bangalore - Índia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The amount of reactive power margin available in a system determines its proximity to voltage instability under normal and emergency conditions. More the reactive power margin, better is the systems security and vice-versa. A hypothetical way of improving the reactive margin of a synchronous generator is to reduce the real power generation within its mega volt-ampere (MVA) ratings. This real power generation reduction will affect its power contract agreements entered in the electricity market. Owing to this, the benefit that the generator foregoes will have to be compensated by paying them some lost opportunity cost. The objective of this study is three fold. Firstly, the reactive power margins of the generators are evaluated. Secondly, they are improved using a reactive power optimization technique and optimally placed unified power flow controllers. Thirdly, the reactive power capacity exchanges along the tie-lines are evaluated under base case and improved conditions. A detailed analysis of all the reactive power sources and sinks scattered throughout the network is carried out in the study. Studies are carried out on a real life, three zone, 72-bus equivalent Indian southern grid considering normal and contingency conditions with base case operating point and optimised results presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Seismic microzonation has generally been recognized as the most accepted tool in seismic hazard assessment and risk evaluation. In general, risk reduction can be done by reducing the hazard, the vulnerability or the value at risk. Since the earthquake hazard can not be reduced, one has to concentrate on vulnerability and value at risk. The vulnerability of an urban area / municipalities depends on the vulnerability of infrastructure and redundancies within the infrastructure. The earthquake risk is the damage to buildings along with number of people that are killed / hurt and the economic losses during the event due to an earthquake with a return period corresponding to this time period. The principal approaches one can follow to reduce these losses are to avoid, if possible, high hazard areas for the siting of buildings and infrastructure, and further ensure that the buildings and infrastructure are designed and constructed to resist expected earthquake loads. This can be done if one can assess the hazard at local scales. Seismic microzonation maps provide the basis for scientifically based decision-making to reduce earthquake risk for Govt./public agencies, private owners and the general public. Further, seismic microzonation carried out on an appropriate scale provides a valuable tool for disaster mitigation planning and emergency response planning for urban centers / municipalities. It provides the basis for the identification of the areas of the city / municipality which are most likely to experience serious damage in the event of an earthquake.