9 resultados para Finance and Financial Management
em Indian Institute of Science - Bangalore - Índia
Resumo:
During the course of preparation of a master plan for the transportation networks in Bangalore city, mapping the various initiatives and interventions planned towards addressing mobility, existing situation and implications of some of the proposed interventions was analysed. The inferences are based on existing transportation network; synthesis of various transportation related studies and proposed infrastructure initiatives (road works) in Bangalore. Broadly, they can be summarized as following five aspects: I. Need for ~Sreclassifying~T existing road networks (arterial and sub-arterial) with effective geospatial database in the back-end. II. The proposed Core Ring Road at surface grade may not be feasible. III. Current interventions encouraging more independent motorable transport by way of road widening, construction of underpasses, flyovers and grade-separators would not ease traffic congestion when addressed in isolation. IV. Factors affecting time and cost-overruns in infrastructure projects and ways to tackle are discussed. V. Initiatives required for addressing effective planning for operations recommended.
Resumo:
This paper reviews integrated economic and ecological models that address impacts and adaptation to climate change in the forest sector. Early economic model studies considered forests as one out of many possible impacts of climate change, while ecological model studies tended to limit the economic impacts to fixed price-assumptions. More recent studies include broader representations of both systems, but there are still few studies which can be regarded fully integrated. Full integration of ecological and economic models is needed to address forest management under climate change appropriately. The conclusion so far is that there are vast uncertainties about how climate change affects forests. This is partly due to the limited knowledge about the global implications of the social and economical adaptation to the effects of climate change on forests.
Resumo:
This paper describes a dynamic voltage frequency control scheme for a 256 X 64 SRAM block for reducing the energy in active mode and stand-by mode. The DVFM control system monitors the external clock and changes the supply voltage and the body bias so as to achieve a significant reduction in energy. The behavioral model of the proposed DVFM control system algorithm is described and simulated in HDL using delay and energy parameters obtained through SPICE simulation. The frequency range dictated by an external controller is 100 MHz to I GHz. The supply voltage of the complete memory system is varied in steps of 50 mV over the range of 500 mV to IV. The threshold voltage range of operation is plusmn100 mV around the nominal value, achieving 83.4% energy reduction in the active mode and 86.7% in the stand-by mode. This paper also proposes a energy replica that is used in the energy monitor subsystem of the DVFM system.
Resumo:
Interactions of major activities involved in airfleet operations, maintenance, and logistics are investigated in the framework of closed queuing networks with finite number of customers. The system is viewed at three levels, namely: operations at the flying-base, maintenance at the repair-depot, and logistics for subsystems and their interactions in achieving the system objectives. Several performance measures (eg, availability of aircraft at the flying-base, mean number of aircraft on ground at different stages of repair, use of repair facilities, and mean time an aircraft spends in various stages of repair) can easily be computed in this framework. At the subsystem level the quantities of interest are the unavailability (probability of stockout) of a spare and the duration of its unavailability. The repair-depot capability is affected by the unavailability of a spare which in turn, adversely affects the availability of aircraft at the flying-base level. Examples illustrate the utility of the proposed models.
Resumo:
In this paper, we study duty cycling and power management in a network of energy harvesting sensor (EHS) nodes. We consider a one-hop network, where K EHS nodes send data to a destination over a wireless fading channel. The goal is to find the optimum duty cycling and power scheduling across the nodes that maximizes the average sum data rate, subject to energy neutrality at each node. We adopt a two-stage approach to simplify the problem. In the inner stage, we solve the problem of optimal duty cycling of the nodes, subject to the short-term power constraint set by the outer stage. The outer stage sets the short-term power constraints on the inner stage to maximize the long-term expected sum data rate, subject to long-term energy neutrality at each node. Albeit suboptimal, our solutions turn out to have a surprisingly simple form: the duty cycle allotted to each node by the inner stage is simply the fractional allotted power of that node relative to the total allotted power. The sum power allotted is a clipped version of the sum harvested power across all the nodes. The average sum throughput thus ultimately depends only on the sum harvested power and its statistics. We illustrate the performance improvement offered by the proposed solution compared to other naive schemes via Monte-Carlo simulations.
Resumo:
Multi-GPU machines are being increasingly used in high-performance computing. Each GPU in such a machine has its own memory and does not share the address space either with the host CPU or other GPUs. Hence, applications utilizing multiple GPUs have to manually allocate and manage data on each GPU. Existing works that propose to automate data allocations for GPUs have limitations and inefficiencies in terms of allocation sizes, exploiting reuse, transfer costs, and scalability. We propose a scalable and fully automatic data allocation and buffer management scheme for affine loop nests on multi-GPU machines. We call it the Bounding-Box-based Memory Manager (BBMM). BBMM can perform at runtime, during standard set operations like union, intersection, and difference, finding subset and superset relations on hyperrectangular regions of array data (bounding boxes). It uses these operations along with some compiler assistance to identify, allocate, and manage data required by applications in terms of disjoint bounding boxes. This allows it to (1) allocate exactly or nearly as much data as is required by computations running on each GPU, (2) efficiently track buffer allocations and hence maximize data reuse across tiles and minimize data transfer overhead, and (3) and as a result, maximize utilization of the combined memory on multi-GPU machines. BBMM can work with any choice of parallelizing transformations, computation placement, and scheduling schemes, whether static or dynamic. Experiments run on a four-GPU machine with various scientific programs showed that BBMM reduces data allocations on each GPU by up to 75% compared to current allocation schemes, yields performance of at least 88% of manually written code, and allows excellent weak scaling.