42 resultados para Bridge Project

em Indian Institute of Science - Bangalore - Índia


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The demand for tunnelling and underground space creation is rapidly growing due to the requirement of civil infrastructure projects and urbanisation. Blasting remains the most inexpensive method of underground excavations in hard rock. Unfortunately, there are no specific safety guidelines available for the blasted tunnels with regards to the threshold limits of vibrations caused by repeated blasting activity in the close proximity. This paper presents the results of a comprehensive study conducted to find out the effect of repeated blast loading on the damage experienced by jointed basaltic rock mass during tunnelling works. Conducting of multiple rounds of blasts for various civil excavations in a railway tunnel imparted repeated loading on rock mass of sidewall and roof of the tunnel. The blast induced damage was assessed by using vibration attenuation equations of charge weight scaling law and measured by borehole extensometers and borehole camera. Ground vibrations of each blasting round were also monitored by triaxial geophones installed near the borehole extensometers. The peak particle velocity (V-max) observations and plastic deformations from borehole extensometers were used to develop a site specific damage model. The study reveals that repeated dynamic loading imparted on the exposed tunnel from subsequent blasts, in the vicinity, resulted in rock mass damage at lesser vibration levels than the critical peak particle velocity (V-cr). It was found that, the repeated blast loading resulted in the near-field damage due to high frequency waves and far-field damage due to low frequency waves. The far field damage, after 45-50 occurrences of blast loading, was up to 55% of the near-field damage in basaltic rock mass. The findings of the study clearly indicate that the phenomena of repeated blasting with respect to number of cycles of loading should be taken into consideration for proper assessment of blast induced damage in underground excavations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A simple four-terminal AC bridge is described which can be used with germanium resistance thermometers down to 1 K. The special features of the bridge are its ease of fabrication and extremely low cost.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The solution and solid-state conformations of the peptide disulfide Boc-Cys-Pro-Aib-Cys-NHMe have been determined by NMR spectroscopy and X-ray diffraction. The Cys(4) and methylamide NH groups are solvent shielded in CDCI3 and (CD,),SO, suggesting their involvement in intramolecular hydrogen bonding. On the basis of known stereochemical preferences of Pro and Aib residues, a consecutive @-turn structure is favored in solution. X-ray diffraction analysis reveals a highly folded 310 helical conformation for the peptide, with the S-S bridge lying approximately parallel to the helix axis, linking residues 1 and 4. The backbone conformational angles are Cys(1) 4 = -121.1', $ = 65.6"; Pro(2) 4 = -58.9', 4 = -34.0'; Aib(3) 4 = -61.8', $ = -17.9'; Cys(4) 4 = -70.5', $ = -18.6'. Two intramolecular hydrogen bonds are observed between Cys(1) CO--HN Cys(4) and Pro(2) CO--HNMe. The disulfide bond has a right-handed chirality, with a dihedral angle (xss) of 82'.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A simple ramp control firing circuit, suitable for use with fully controlled, line-commutated thyristor bridge circuits, is discussed here. This circuit uses very few components and generates the synchronized firing pulses in a simple way. It operates from a single 15 V Supply and has an inherent pulse inhibit facility. This circuit provides the synchronized firing pulses for both thyristors of the same limb in a bridge. To ensure reliability, wide triggering pulses are used, which are modulated to pass through the pulse transformers1 and demodulated before being fed to the thyristor gates. The use of throe such circuits only for a three-phase bridge is discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An integrated approach to energy planning, when applied to large hydroelectric projects, requires that the energy-opportunity cost of the land submerged under the reservoir be incorporated into the planning methodology. Biomass energy lost from the submerged land has to be compared to the electrical energy generated, for which we develop four alternative formulations of the net-energy function. The design problem is posed as an LP problem and is solved for two sites in India. Our results show that the proposed designs may not be viable in net-energy terms, whereas a marginal reduction in the generation capacity could lead to an optimal design that gives substantial savings in the submerged area. Allowing seasonal variations in the hydroelectric generation capacity also reduces the reservoir size. A mixed hydro-wood generation system is then examined and is found to be viable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present trend in the industry is towards the use of power transistors in the development of efficient Pulsewidth Modulated (PWM) inverters, because of their operation at high frequency, simplicity of turn-off, and low commutation losses compared to the technology using thyristors. But the protection of power transistors, minimization of switching power loss, and design of base drive circuit are very important for a reliable operation of the system. The requirements, analysis, and a simplified procedure for calculation of the switching-aid network components are presented. The transistor is protected against short circuit using a modified autoregulated and autoprotection drive circuit. The experimental results show that the switching power loss and voltage stress in the device can be reduced by suitable choice of the switching-aid network component values.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We report a versatile but easy to make AC mutual inductance bridge. The bridge has been used over the temperature range 4-300 K and with applied magnetic fields up to 7 T. Representative data obtained on various types of magnetic systems are shown.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The crystal structure of the cyclic peptide disulfide Boc-Cys-Pro-Aib-Cys-NHMe has been determined by X-ray diffraction. The peptide crystallizes in the space group P212121, with A = 8.646(1), B = 18.462(2), C = 19.678(3)Å and Z = 4. The molecules adopt a highly folded compact conformation, stabilized by two intramolecular 4→ 1 hydrogen bonds between the Cys (1) and Pro (2) CO groups and the Cys (4) and methylamide NH groups, respectively. The backbone conformational angles for the peptide lie very close to those expected for a 310 helix. The S-S bridge adopts a right handed twist with a dihedral angle of 82°. The structure illustrates the role of stereochemically constrained residues, in generating novel peptide conformations. Aib, α-aminoisobutyric acid; Z, benzyloxycarbonyl; Boc, t-butyloxycarbonyl; OMe, methyl ester; OBz, benzyl ester; NHMe, N-methylamide; Tosyl, p-toluenesulfonyl.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new two-stage state feedback control design approach has been developed to monitor the voltage supplied to magnetorheological (MR) dampers for semi-active vibration control of the benchmark highway bridge. The first stage contains a primary controller, which provides the force required to obtain a desired closed-loop response of the system. In the second stage, an optimal dynamic inversion (ODI) approach has been developed to obtain the amount of voltage to be supplied to each of the MR dampers such that it provides the required force prescribed by the primary controller. ODI is formulated by optimization with dynamic inversion, such that an optimal voltage is supplied to each damper in a set. The proposed control design has been simulated for both phase-I and phase-II study of the recently developed benchmark highway bridge problem. The efficiency of the proposed controller is analyzed in terms of the performance indices defined in the benchmark problem definition. Simulation results demonstrate that the proposed approach generally reduces peak response quantities over those obtained from the sample semi-active controller, although some response quantities have been seen to be increasing. Overall, the proposed control approach is quite competitive as compared with the sample semi-active control approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A simple ramp control firing circuit, suitable for use with fully controlled, line-commutated thyristor bridge circuits, is discussed here. This circuit uses very few components and generates the synchronized firing pulses in a simple way. It operates from a single 15 V Supply and has an inherent pulse inhibit facility. This circuit provides the synchronized firing pulses for both thyristors of the same limb in a bridge. To ensure reliability, wide triggering pulses are used, which are modulated to pass through the pulse transformers1 and demodulated before being fed to the thyristor gates. The use of throe such circuits only for a three-phase bridge is discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper focuses on the reliability-based design optimization of gravity wall bridge abutments when subjected to active condition during earthquakes. An analytical study considering the effect of uncertainties in the seismic analysis of bridge abutments is presented. Planar failure surface has been considered in conjunction with the pseudostatic limit equilibrium method for the calculation of the seismic active earth pressure. Analysis is conducted to evaluate the external stability of bridge abutments when subjected to earthquake loads. Reliability analysis is used to estimate the probability of failure in three modes of failure viz. sliding failure of the wall on its base, overturning failure about its toe (or eccentricity failure of the resultant force) and bearing failure of foundation soil below the base of wall. The properties of backfill and foundation soil below the base of abutment are treated as random variables. In addition, the uncertainties associated with characteristics of earthquake ground motions such as horizontal seismic acceleration and shear wave velocity propagating through backfill soil are considered. The optimum proportions of the abutment needed to maintain the stability are obtained against three modes of failure by targeting various component and system reliability indices. Studies have also been made to study the influence of various parameters on the seismic stability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

the leopard tree Caesalpinia ferrea (Leguminosae) a native of eastern Brazil-some of the leader branches connect to and fuse with neighbouring branches of the same tree. The bridge initials project out as pegs or protuberances and apparently extend in a coordinated manner, connecting branches up to 4 ft apart. The fusion of two branches of the same tree implies intra-plant communication involving signaling factor(s). The bridges resemble fusions between hyphae in a fungal colony. Whereas hyphal fusions are common and the process is apparently completed in <1 h, branch fusions in C. ferrea tree are limited and a slow process, apparently requiring several months to years to complete. Branch fusions in C. ferrea are in accord with Claus Mattheck's analysis that tree branches actually seek contact rather than avoid contacts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A simple, low-cost, constant frequency, analog controller is proposed for the front-end half-bridge rectifier of a single-phase transformerless UPS system to maintain near unity power factor at the input and zero dc-offset voltage at the output. The controller generates the required gating pulses by comparing the input current with a periodic, bipolar, linear carrier without sensing the input voltage. Two voltage controllers and a single integrator with reset are used to generate the required carrier. All the necessary control operations can be performed without using any PLL, multiplier and/or divider. The controller can be fabricated as a single integrated circuit. The control concept is validated through simulation and also experimentally on an 800W half-bridge rectifier. Experimental results are presented for ac-dc application, and also for ac-dc-ac UPS application with both sinusoidal and nonlinear loads. The simulation and experimental results agree well.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A three-terminal capacitance bridge is developed for the measurement of the dielectric constant of lossy liquids. Using this modified ratio transformer bridge, the capacitance shunted by a resistance as low as 50 Omega is measured at 10 kHz. The capacitance error associated with the inductance of the connecting wire is compensated using the novel method of introducing an additional transformer to the existing ratio transformer bridge. Other sources of capacitance errors, such as the non-zero output impedence of the ratio transformer and the shield capacitances of the cables, are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Submergence of land is a major impact of large hydropower projects. Such projects are often also dogged by siltation, delays in construction and heavy debt burdens-factors that are not considered in the project planning exercise. A simple constrained optimization model for the benefit~ost analysis of large hydropower projects that considers these features is proposed. The model is then applied to two sites in India. Using the potential productivity of an energy plantation on the submergible land is suggested as a reasonable approach to estimating the opportunity cost of submergence. Optimum project dimensions are calculated for various scenarios. Results indicate that the inclusion of submergence cost may lead to a substanual reduction in net present value and hence in project viability. Parameters such as project lifespan, con$truction time, discount rate and external debt burden are also of significance. The designs proposed by the planners are found to be uneconomic, whIle even the optimal design may not be viable for more typical scenarios. The concept of energy opportunity cost is useful for preliminary screening; some projects may require more detailed calculations. The optimization approach helps identify significant trade-offs between energy generation and land availability.