107 resultados para Power systems reliability
Resumo:
This paper presents the design and implementation of a learning controller for the Automatic Generation Control (AGC) in power systems based on a reinforcement learning (RL) framework. In contrast to the recent RL scheme for AGC proposed by us, the present method permits handling of power system variables such as Area Control Error (ACE) and deviations from scheduled frequency and tie-line flows as continuous variables. (In the earlier scheme, these variables have to be quantized into finitely many levels). The optimal control law is arrived at in the RL framework by making use of Q-learning strategy. Since the state variables are continuous, we propose the use of Radial Basis Function (RBF) neural networks to compute the Q-values for a given input state. Since, in this application we cannot provide training data appropriate for the standard supervised learning framework, a reinforcement learning algorithm is employed to train the RBF network. We also employ a novel exploration strategy, based on a Learning Automata algorithm,for generating training samples during Q-learning. The proposed scheme, in addition to being simple to implement, inherits all the attractive features of an RL scheme such as model independent design, flexibility in control objective specification, robustness etc. Two implementations of the proposed approach are presented. Through simulation studies the attractiveness of this approach is demonstrated.
Resumo:
This paper reports the dynamic stability analysis of a single machine infinite bus system through torque angle loop analysis and forms an extension of the work on Block diagrams and torque angle loop analysis of synchronous machines reported by I. Nagy [3]. It aims to incorporate in the machine model, the damper windings (one on each axis) and to compare the dynamic behaviour of the system with and without damper windings. The effect of using different stabilizing signals (viz. active power and speed deviations) on the dynamic performance is analysed and the significant effect of damper windings on the dynamic behaviour of the system is highlighted.
Resumo:
This paper presents a methodology for selection of static VAR compensator location based on static voltage stability analysis of power systems. The analysis presented here uses the L-index of load buses, which includes voltage stability information of a normal load flow and is in the range of 0 (no load of system) to 1 (voltage collapse). An approach has been presented to select a suitable size and location of static VAR compensator in an EHV network for system voltage stability improvement. The proposed approach has been tested under simulated conditions on a few power systems and the results for a sample radial network and a 24-node equivalent EHV power network of a practical system are presented for illustration purposes. © 2000 Published by Elsevier Science S.A. All rights reserved.
Resumo:
Electric power utilities are installing distribution automation systems (DAS) for better management and control of the distribution networks during the recent past. The success of DAS, largely depends on the availability of reliable database of the control centre and thus requires an efficient state estimation (SE) solution technique. This paper presents an efficient and robust three-phase SE algorithm for application to radial distribution networks. This method exploits the radial nature of the network and uses forward and backward propagation scheme to estimate the line flows, node voltage and loads at each node, based on the measured quantities. The SE cannot be executed without adequate number of measurements. The extension of the method to the network observability analysis and bad data detection is also discussed. The proposed method has been tested to analyze several practical distribution networks of various voltage levels and also having high R:X ratio of lines. The results for a typical network are presented for illustration purposes. © 2000 Elsevier Science S.A. All rights reserved.
Resumo:
Artificial Neural Networks (ANNs) have recently been proposed as an alterative method for salving certain traditional problems in power systems where conventional techniques have not achieved the desired speed, accuracy or efficiency. This paper presents application of ANN where the aim is to achieve fast voltage stability margin assessment of power network in an energy control centre (ECC), with reduced number of appropriate inputs. L-index has been used for assessing voltage stability margin. Investigations are carried out on the influence of information encompassed in input vector and target out put vector, on the learning time and test performance of multi layer perceptron (MLP) based ANN model. LP based algorithm for voltage stability improvement, is used for generating meaningful training patterns in the normal operating range of the system. From the generated set of training patterns, appropriate training patterns are selected based on statistical correlation process, sensitivity matrix approach, contingency ranking approach and concentric relaxation method. Simulation results on a 24 bus EHV system, 30 bus modified IEEE system, and a 82 bus Indian power network are presented for illustration purposes.
Resumo:
Electric power systems are exposed to various contingencies. Network contingencies often contribute to over-loading of network branches, unsatisfactory voltages and also leading to problems of stability/voltage collapse. To maintain security of the systems, it is desirable to estimate the effect of contingencies and plan suitable measures to improve system security/stability. This paper presents an approach for selection of unified power flow controller (UPFC) suitable locations considering normal and network contingencies after evaluating the degree of severity of the contingencies. The ranking is evaluated using composite criteria based fuzzy logic for eliminating masking effect. The fuzzy approach, in addition to real power loadings and bus voltage violations, voltage stability indices at the load buses also used as the post-contingent quantities to evaluate the network contingency ranking. The selection of UPFC suitable locations uses the criteria on the basis of improved system security/stability. The proposed approach for selection of UPFC suitable locations has been tested under simulated conditions on a few power systems and the results for a 24-node real-life equivalent EHV power network and 39-node New England (modified) test system are presented for illustration purposes.
Resumo:
This paper proposes a new approach for solving the state estimation problem. The approach is aimed at producing a robust estimator that rejects bad data, even if they are associated with leverage-point measurements. This is achieved by solving a sequence of Linear Programming (LP) problems. Optimization is carried via a new algorithm which is a combination of “upper bound optimization technique" and “an improved algorithm for discrete linear approximation". In this formulation of the LP problem, in addition to the constraints corresponding to the measurement set, constraints corresponding to bounds of state variables are also involved, which enables the LP problem more efficient in rejecting bad data, even if they are associated with leverage-point measurements. Results of the proposed estimator on IEEE 39-bus system and a 24-bus EHV equivalent system of the southern Indian grid are presented for illustrative purpose.
Resumo:
There is a lot of pressure on all the developed and second world countries to produce low emission power and distributed generation (DG) is found to be one of the most viable ways to achieve this. DG generally makes use of renewable energy sources like wind, micro turbines, photovoltaic, etc., which produce power with minimum green house gas emissions. While installing a DG it is important to define its size and optimal location enabling minimum network expansion and line losses. In this paper, a methodology to locate the optimal site for a DG installation, with the objective to minimize the net transmission losses, is presented. The methodology is based on the concept of relative electrical distance (RED) between the DG and the load points. This approach will help to identify the new DG location(s), without the necessity to conduct repeated power flows. To validate this methodology case studies are carried out on a 20 node, 66kV system, a part of Karnataka Transco and results are presented.
Resumo:
This paper presents a method for placement of Phasor Measurement Units, ensuring the monitoring of vulnerable buses which are obtained based on transient stability analysis of the overall system. Real-time monitoring of phase angles across different nodes, which indicates the proximity to instability, the very purpose will be well defined if the PMUs are placed at buses which are more vulnerable. The issue is to identify the key buses where the PMUs should be placed when the transient stability prediction is taken into account considering various disturbances. Integer Linear Programming technique with equality and inequality constraints is used to find out the optimal placement set with key buses identified from transient stability analysis. Results on IEEE-14 bus system are presented to illustrate the proposed approach.
Resumo:
This article compares the land use in solar energy technologies with conventional energy sources. This has been done by introducing two parameters called land transformation and land occupation. It has been shown that the land area transformed by solar energy power generation is small compared to hydroelectric power generation, and is comparable with coal and nuclear energy power generation when life-cycle transformations are considered. We estimate that 0.97% of total land area or 3.1% of the total uncultivable land area of India would be required to generate 3400 TWh/yr from solar energy power systems in conjunction with other renewable energy sources.
Resumo:
Ceramic/Porcelain suspension disc insulators are widely used in power systems to provide electrical insulation and mechanically support for high-voltage transmission lines. These insulators are subjected to a variety of stresses, including mechanical, electrical and environmental. These stresses act in unison. The exact nature and magnitude of these stresses vary significantly and depends on insulator design, application and its location. Due to various reasons the insulator disc can lose its electrical insulation properties without any noticeable mechanical failure. Such a condition while difficult to recognize, can enhance the stress on remaining healthy insulator discs in the string further may lead to a flashover. To understand the stress enhancement due to faulty discs in a string, attempt has been made to simulate the potential and electric field profiles for various disc insulators presently used in the country. The results of potential and electric filed stress obtained for normal and strings with faulty insulator discs are presented.
Resumo:
Effective network overload alleviation is very much essential in order to maintain security and integrity from the operational viewpoint of deregulated power systems. This paper aims at developing a methodology to reschedule the active power generation from the sources in order to manage the network congestion under normal/contingency conditions. An effective method has been proposed using fuzzy rule based inference system. Using virtual flows concept, which provides partial contributions/counter flows in the network elements is used as a basis in the proposed method to manage network congestions to the possible extent. The proposed method is illustrated on a sample 6 bus test system and on modified IEEE 39 bus system.
Resumo:
This paper deals with line protection challenges experienced in system having substantial wind generation penetration. Two types of WTGU: Doubly Fed (DFIG) and Squirrel Cage (SCIG) Induction Generators are simulated and connected to grid with single circuit transmission line. The paper summarizes analytical investigations carried out on the impedance seen by distance relays by varying fault resistances and grid short circuit MVA, for the protection of such transmission lines during faults. The results are also compared with systems having conventional synchronous machine connected to the grid.
Resumo:
The effect of structure height on the lightning striking distance is estimated using a lightning strike model that takes into account the effect of connecting leaders. According to the results, the lightning striking distance may differ significantly from the values assumed in the IEC standard for structure heights beyond 30m. However, for structure heights smaller than about 30m, the results show that the values assumed by IEC do not differ significantly from the predictions based on a lightning attachment model taking into account the effect of connecting leaders. However, since IEC assumes a smaller striking distance than the ones predicted by the adopted model one can conclude that the safety is not compromised in adhering to the IEC standard. Results obtained from the model are also compared with Collection Volume Method (CVM) and other commonly used lightning attachment models available in the literature. The results show that in the case of CVM the calculated attractive distances are much larger than the ones obtained using the physically based lightning attachment models. This indicates the possibility of compromising the lightning protection procedures when using CVM. (C) 2014 Elsevier B.V. All rights reserved.