18 resultados para software management infrastructure


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Climate change impact on a groundwater-dependent small urban town has been investigated in the semiarid hard rock aquifer in southern India. A distributed groundwater model was used to simulate the groundwater levels in the study region for the projected future rainfall (2012-32) obtained from a general circulation model (GCM) to estimate the impacts of climate change and management practices on groundwater system. Management practices were based on the human-induced changes on the urban infrastructure such as reduced recharge from the lakes, reduced recharge from water and wastewater utility due to an operational and functioning underground drainage system, and additional water extracted by the water utility for domestic purposes. An assessment of impacts on the groundwater levels was carried out by calibrating a groundwater model using comprehensive data gathered during the period 2008-11 and then simulating the future groundwater level changes using rainfall from six GCMs Institute of Numerical Mathematics Coupled Model, version 3.0 (INM-CM. 3.0); L'Institut Pierre-Simon Laplace Coupled Model, version 4 (IPSL-CM4); Model for Interdisciplinary Research on Climate, version 3.2 (MIROC3.2); ECHAM and the global Hamburg Ocean Primitive Equation (ECHO-G); Hadley Centre Coupled Model, version 3 (HadCM3); and Hadley Centre Global Environment Model, version 1 (HadGEM1)] that were found to show good correlation to the historical rainfall in the study area. The model results for the present condition indicate that the annual average discharge (sum of pumping and natural groundwater outflow) was marginally or moderately higher at various locations than the recharge and further the recharge is aided from the recharge from the lakes. Model simulations showed that groundwater levels were vulnerable to the GCM rainfall and a scenario of moderate reduction in recharge from lakes. Hence, it is important to sustain the induced recharge from lakes by ensuring that sufficient runoff water flows to these lakes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Exploiting the performance potential of GPUs requires managing the data transfers to and from them efficiently which is an error-prone and tedious task. In this paper, we develop a software coherence mechanism to fully automate all data transfers between the CPU and GPU without any assistance from the programmer. Our mechanism uses compiler analysis to identify potential stale accesses and uses a runtime to initiate transfers as necessary. This allows us to avoid redundant transfers that are exhibited by all other existing automatic memory management proposals. We integrate our automatic memory manager into the X10 compiler and runtime, and find that it not only results in smaller and simpler programs, but also eliminates redundant memory transfers. Tested on eight programs ported from the Rodinia benchmark suite it achieves (i) a 1.06x speedup over hand-tuned manual memory management, and (ii) a 1.29x speedup over another recently proposed compiler--runtime automatic memory management system. Compared to other existing runtime-only and compiler-only proposals, it also transfers 2.2x to 13.3x less data on average.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

India's energy demand is increasing rapidly with the intensive growth of economy. The electricity demand in India exceeded the availability, both in terms of base load energy and peak availability. The efficient use of energy source and its conversion and utilizations are the viable alternatives available to the utilities or industry. There are essentially two approaches to electrical energy management. First at the supply / utility end (Supply Side Management or SSM) and the other at the consumer end (Demand Side Management or DSM). This work is based on Supply Side Management (SSM) protocol and consists of design, fabrication and testing of a control device that will be able to automatically regulate the power flow to an individual consumer's premise. This control device can monitor the overuse of electricity (above the connected load or contracted demand) by the individual consumers. The present project work specially emphasizes on contract demand of every consumer and tries to reduce the use beyond the contract demand. This control unit design includes both software and hardware work and designed for 0.5 kW contract demand. The device is tested in laboratory and reveals its potential use in the field.