263 resultados para POWER-AMPLIFIER
Resumo:
This paper illustrates the application of a new technique, based on Support Vector Clustering (SVC) for the direct identification of coherent synchronous generators in a large interconnected Multi-Machine Power Systems. The clustering is based on coherency measures, obtained from the time domain responses of the generators following system disturbances. The proposed clustering algorithm could be integrated into a wide-area measurement system that enables fast identification of coherent clusters of generators for the construction of dynamic equivalent models. An application of the proposed method is demonstrated on a practical 15 generators 72-bus system, an equivalent of Indian Southern grid in an attempt to show the effectiveness of this clustering approach. The effects of short circuit fault locations on coherency are also investigated.
Resumo:
This paper deals with the coupling of High Power Microwaves with a buried twisted pair cable. The electric field at a distance of 1km from the HPM antenna has been computed and is used for further computation of induced voltage and current. It is found that the peak of the induced current and voltage in a buried unshielded twisted pair cable at a distance of 1km from an HPM antenna of power level 10GW is 20A and 2kV respectively.
Resumo:
Constellation Constrained (CC) capacity regions of two-user Gaussian Multiple Access Channels (GMAC) have been recently reported, wherein an appropriate angle of rotation between the constellations of the two users is shown to enlarge the CC capacity region. We refer to such a scheme as the Constellation Rotation (CR) scheme. In this paper, we propose a novel scheme called the Constellation Power Allocation (CPA) scheme, wherein the instantaneous transmit power of the two users are varied by maintaining their average power constraints. We show that the CPA scheme offers CC sum capacities equal (at low SNR values) or close (at high SNR values) to those offered by the CR scheme with reduced decoding complexity for QAM constellations. We study the robustness of the CPA scheme for random phase offsets in the channel and unequal average power constraints for the two users. With random phase offsets in the channel, we show that the CC sum capacity offered by the CPA scheme is more than the CR scheme at high SNR values. With unequal average power constraints, we show that the CPA scheme provides maximum gain when the power levels are close, and the advantage diminishes with the increase in the power difference.
Resumo:
A regenerative or circulating-power method is presented in this paper for heat run test on the legs of a three-level neutral point clamped (NPC) inverter. This test ensures that only losses are drawn from the dc supply, while rated power is circulated between the two legs, thus minimising wastage of energy. A proportional-resonant (PR) controller based current control scheme is proposed here for the circulating power test setup in NPC inverter. Simulation and experimental results are presented to validate the controller design at various operating conditions. Results of thermal test on the inverter legs are presented at two different operating conditions.
Resumo:
Power converters burn-in test consumes large amount of energy, which increases the cost of testing, and certification, in medium and high power application. A simple test configuration to test a PWM rectifier induction motor drive, using a Doubly Fed Induction Machine (DFIM) to circulate power back to the grid for burn-in test is presented. The test configuration makes use of only one power electronic converter, which is the converter to be tested. The test method ensures soft synchronization of DFIM and Squirrel Cage Induction Machine (SCIM). A simple volt per hertz control of the drive is sufficient for conducting the test. To synchronize the DFIM with SCIM, the rotor terminal voltage of DFIM is measured and used as an indication of speed mismatch between DFIM and SCIM. The synchronization is done when the DFIM rotor voltage is at its minimum. Analysis of the DFIM characteristics confirms that such a test can be effectively performed with smooth start up and loading of the test setup. After synchronization is obtained, the speed command to SCIM is changed in order to load the setup in motoring or regenerative mode of operation. The experimental results are presented that validates the proposed test method.
Resumo:
This paper presents an analysis and comparison between two circuit topologies of the 3-phase, 3-level unity power factor (Vienna) rectifier on the basis of packaging issues and semiconductor power losses. The analysis indicates the suitability of one particular circuit variant due to restrictions on switching frequency at higher power levels. A comparison is also done between hysteresis and carrier based PWM strategies for current control of the rectifier, along with experimental evaluation of the control strategies on a hardware prototype of the rectifier. The comparison indicates that the carrier based modulation strategy is better suited for use with higher order filters that are utilized in high power applications.
Resumo:
Wind power, as an alternative to fossil fuels, is plentiful, renewable, widely distributed, clean, produces no greenhouse gas emissions during operation, and uses little land. In operation, the overall cost per unit of energy produced is similar to the cost for new coal and natural gas installations. However, the stochastic behaviour of wind speeds leads to significant disharmony between wind energy production and electricity demand. Wind generation suffers from an intermittent characteristics due to the own diurnal and seasonal patterns of the wind behaviour. Both reactive power and voltage control are important under varying operating conditions of wind farm. To optimize reactive power flow and to keep voltages in limit, an optimization method is proposed in this paper. The objective proposed is minimization of the voltage deviations of the load buses (Vdesired). The approach considers the reactive power limits of wind generators and co-ordinates the transformer taps. This algorithm has been tested under practically varying conditions simulated on a test system. The results are obtained on a system of 50-bus real life equivalent power network. The result shows the efficiency of the proposed method.
Resumo:
On the backdrop of climate change scenario, there is emphasis on controlling emission of greenhouse gases such as CO2. Major thrust being seen worldwide as well as in India is for generation of electricity from renewable sources like solar and wind. Chitradurga area of Karnataka is identified as a suitable location for the production of electricity from wind turbines because of high wind-energy resource. The power generated and the performance of 18 wind turbines located in this region are studied based on the actual field data collected over the past seven years. Our study shows a good prospect for expansion of power production using wind turbines.