24 resultados para route planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study presents a theory of utility models based on aspiration levels, as well as the application of this theory to the planning of timber flow economics. The first part of the study comprises a derivation of the utility-theoretic basis for the application of aspiration levels. Two basic models are dealt with: the additive and the multiplicative. Applied here solely for partial utility functions, aspiration and reservation levels are interpreted as defining piecewisely linear functions. The standpoint of the choices of the decision-maker is emphasized by the use of indifference curves. The second part of the study introduces a model for the management of timber flows. The model is based on the assumption that the decision-maker is willing to specify a shape of income flow which is different from that of the capital-theoretic optimum. The utility model comprises four aspiration-based compound utility functions. The theory and the flow model are tested numerically by computations covering three forest holdings. The results show that the additive model is sensitive even to slight changes in relative importances and aspiration levels. This applies particularly to nearly linear production possibility boundaries of monetary variables. The multiplicative model, on the other hand, is stable because it generates strictly convex indifference curves. Due to a higher marginal rate of substitution, the multiplicative model implies a stronger dependence on forest management than the additive function. For income trajectory optimization, a method utilizing an income trajectory index is more efficient than one based on the use of aspiration levels per management period. Smooth trajectories can be attained by squaring the deviations of the feasible trajectories from the desired one.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper examines the needs, premises and criteria for effective public participation in tactical forest planning. A method for participatory forest planning utilizing the techniques of preference analysis, professional expertise and heuristic optimization is introduced. The techniques do not cover the whole process of participatory planning, but are applied as a tool constituting the numerical core for decision support. The complexity of multi-resource management is addressed by hierarchical decision analysis which assesses the public values, preferences and decision criteria toward the planning situation. An optimal management plan is sought using heuristic optimization. The plan can further be improved through mutual negotiations, if necessary. The use of the approach is demonstrated with an illustrative example, it's merits and challenges for participatory forest planning and decision making are discussed and a model for applying it in general forest planning context is depicted. By using the approach, valuable information can be obtained about public preferences and the effects of taking them into consideration on the choice of the combination of standwise treatment proposals for a forest area. Participatory forest planning calculations, carried out by the approach presented in the paper, can be utilized in conflict management and in developing compromises between competing interests.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To enhance the utilization of the wood, the sawmills are forced to place more emphasis on planning to master the whole production chain from the forest to the end product. One significant obstacle to integrating the forest-sawmill-market production chain is the lack of appropriate information about forest stands. Since the wood procurement point of view in forest planning systems has been almost totally disregarded there has been a great need to develop an easy and efficient pre-harvest measurement method, allowing separate measurement of stands prior to harvesting. The main purpose of this study was to develop a measurement method for pine stands which forest managers could use in describing the properties of the standing trees for sawing production planning. Study materials were collected from ten Scots pine stands (Pinus sylvestris) located in North Häme and South Pohjanmaa, in southern Finland. The data comprise test sawing data on 314 pine stems, dbh and height measures of all trees and measures of the quality parameters of pine sawlog stems in all ten study stands as well as the locations of all trees in six stands. The study was divided into four sub-studies which deal with pine quality prediction, construction of diameter and dead branch height distributions, sampling designs and applying height and crown height models. The final proposal for the pre-harvest measurement method is a synthesis of the individual sub-studies. Quality analysis resulted in choosing dbh, distance from stump height to the first dead branch (dead branch height), crown height and tree height as the most appropriate quality characteristics of Scots pine. Dbh and dead branch height are measured from each pine sample tree while height and crown height are derived from dbh measures by aid of mixed height and crown height models. Pine and spruce diameter distribution as well as dead branch height distribution are most effectively predicted by the kernel function. Roughly 25 sample trees seems to be appropriate in pure pine stands. In mixed stands the number of sample trees needs to be increased in proportion to the intensity of pines in order to attain the same level of accuracy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two methods of pre-harvest inventory were designed and tested on three cutting sites containing a total of 197 500 m3 of wood. These sites were located on flat-ground boreal forests located in northwestern Quebec. Both methods studied involved scaling of trees harvested to clear the road path one year (or more) prior to harvest of adjacent cut-blocks. The first method (ROAD) considers the total road right-of-way volume divided by the total road area cleared. The resulting volume per hectare is then multiplied by the total cut-block area scheduled for harvest during the following year to obtain the total estimated cutting volume. The second method (STRATIFIED) also involves scaling of trees cleared from the road. However, in STRATIFIED, log scaling data are stratified by forest stand location. A volume per hectare is calculated for each stretch of road that crosses a single forest stand. This volume per hectare is then multiplied by the remaining area of the same forest stand scheduled for harvest one year later. The sum of all resulting estimated volumes per stand gives the total estimated cutting-volume for all cut-blocks adjacent to the studied road. A third method (MNR) was also used to estimate cut-volumes of the sites studied. This method represents the actual existing technique for estimating cutting volume in the province of Quebec. It involves summing the cut volume for all forest stands. The cut volume is estimated by multiplying the area of each stand by its estimated volume per hectare obtained from standard stock tables provided by the governement. The resulting total estimated volume per cut-block for all three methods was then compared with the actual measured cut-block volume (MEASURED). This analysis revealed a significant difference between MEASURED and MNR methods with the MNR volume estimate being 30 % higher than MEASURED. However, no significant difference from MEASURED was observed for volume estimates for the ROAD and STRATIFIED methods which respectively had estimated cutting volumes 19 % and 5 % lower than MEASURED. Thus the ROAD and STRATIFIED methods are good ways to estimate cut-block volumes after road right-of-way harvest for conditions similar to those examined in this study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Yhteenveto: Veden laadun arviointi vesiensuojelun suunnittelussa

Relevância:

20.00% 20.00%

Publicador:

Resumo:

XVIII IUFRO World Congress, Ljubljana 1986.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Menneinä vuosikymmeninä maatalouden työt ovat ensin koneellistuneet voimakkaasti ja sittemmin mukaan on tullut automaatio. Nykyään koneiden kokoa suurentamalla ei enää saada tuottavuutta nostettua merkittävästi, vaan työn tehostaminen täytyy tehdä olemassa olevien resurssien käyttöä tehostamalla. Tässä työssä tarkastelun kohteena on ajosilppuriketju nurmisäilörehun korjuussa. Säilörehun korjuun intensiivisyys ja koneyksiköiden runsas määrä ovat työnjohdon kannalta vaativa yhdistelmä. Työn tavoitteena oli selvittää vaatimuksia maatalouden urakoinnin tueksi kehitettävälle tiedonhallintajärjestelmälle. Tutkimusta varten haastateltiin yhteensä 12 urakoitsijaa tai yhteistyötä tekevää viljelijää. Tutkimuksen perusteella urakoitsijoilla on tarvetta tietojärjestelmille.Luonnollisesti urakoinnin laajuus ja järjestelyt vaikuttavat asiaan. Tutkimuksen perusteella keskeisimpiä vaatimuksia tiedonhallinnalle ovat: • mahdollisimman laaja, yksityiskohtainen ja automaattinen tiedon keruu tehtävästä työstä • karttapohjaisuus, kuljettajien opastus kohteisiin • asiakasrekisteri, työn tilaus sähköisesti • tarjouspyyntöpohjat, hintalaskurit • luotettavuus, tiedon säilyvyys • sovellettavuus monenlaisiin töihin • yhteensopivuus muiden järjestelmien kanssa Kehitettävän järjestelmän tulisi siis tutkimuksen perusteella sisältää seuraavia osia: helppokäyttöinen suunnittelu/asiakasrekisterityökalu, toimintoja koneiden seurantaan, opastukseen ja johtamiseen, työnaikainen tiedonkeruu sekä kerätyn tiedon käsittelytoimintoja. Kaikki käyttäjät eivät kuitenkaan tarvitse kaikkia toimintoja, joten urakoitsijan on voitava valita tarvitsemansa osat ja mahdollisesti lisätä toimintoja myöhemmin. Tiukoissa taloudellisissa ja ajallisissa raameissa toimivat urakoitsijat ovat vaativia asiakkaita, joiden käyttämän tekniikan tulee olla toimivaa ja luotettavaa. Toisaalta inhimillisiä virheitä sattuu kokeneillekin, joten hyvällä tietojärjestelmällä työstä tulee helpompaa ja tehokkaampaa.