2 resultados para Scheduled Caste

em Glasgow Theses Service


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Introduction: Brain computer interface (BCI) is a promising new technology with possible application in neurorehabilitation after spinal cord injury. Movement imagination or attempted movement-based BCI coupled with functional electrical stimulation (FES) enables the simultaneous activation of the motor cortices and the muscles they control. When using the BCI- coupled with FES (known as BCI-FES), the subject activates the motor cortex using attempted movement or movement imagination of a limb. The BCI system detects the motor cortex activation and activates the FES attached to the muscles of the limb the subject is attempting or imaging to move. In this way the afferent and the efferent pathways of the nervous system are simultaneously activated. This simultaneous activation encourages Hebbian type learning which could be beneficial in functional rehabilitation after spinal cord injury (SCI). The FES is already in use in several SCI rehabilitation units but there is currently not enough clinical evidence to support the use of BCI-FES for rehabilitation. Aims: The main aim of this thesis is to assess outcomes in sub-acute tetraplegic patients using BCI-FES for functional hand rehabilitation. In addition, the thesis explores different methods for assessing neurological rehabilitation especially after BCI-FES therapy. The thesis also investigated mental rotation as a possible rehabilitation method in SCI. Methods: Following investigation into applicable methods that can be used to implement rehabilitative BCI, a BCI based on attempted movement was built. Further, the BCI was used to build a BCI-FES system. The BCI-FES system was used to deliver therapy to seven sub-acute tetraplegic patients who were scheduled to receive the therapy over a total period of 20 working days. These seven patients are in a 'BCI-FES' group. Five more patients were also recruited and offered equivalent FES quantity without the BCI. These further five patients are in a 'FES-only' group. Neurological and functional measures were investigated and used to assess both patient groups before and after therapy. Results: The results of the two groups of patients were compared. The patients in the BCI-FES group had better improvements. These improvements were found with outcome measures assessing neurological changes. The neurological changes following the use of the BCI-FES showed that during movement attempt, the activation of the motor cortex areas of the SCI patients became closer to the activation found in healthy individuals. The intensity of the activation and its spatial localisation both improved suggesting desirable cortical reorganisation. Furthermore, the responses of the somatosensory cortex during sensory stimulation were of clear evidence of better improvement in patients who used the BCI-FES. Missing somatosensory evoked potential peaks returned more for the BCI-FES group while there was no overall change in the FES-only group. Although the BCI-FES group had better neurological improvement, they did not show better functional improvement than the FES-only group. This was attributed mainly to the short duration of the study where therapies were only delivered for 20 working days. Conclusions: The results obtained from this study have shown that BCI-FES may induce cortical changes in the desired direction at least faster than FES alone. The observation of better improvement in the patients who used the BCI-FES is a good result in neurorehabilitation and it shows the potential of thought-controlled FES as a neurorehabilitation tool. These results back other studies that have shown the potential of BCI-FES in rehabilitation following neurological injuries that lead to movement impairment. Although the results are promising, further studies are necessary given the small number of subjects in the current study.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Crossing the Franco-Swiss border, the Large Hadron Collider (LHC), designed to collide 7 TeV proton beams, is the world's largest and most powerful particle accelerator the operation of which was originally intended to commence in 2008. Unfortunately, due to an interconnect discontinuity in one of the main dipole circuit's 13 kA superconducting busbars, a catastrophic quench event occurred during initial magnet training, causing significant physical system damage. Furthermore, investigation into the cause found that such discontinuities were not only present in the circuit in question, but throughout the entire LHC. This prevented further magnet training and ultimately resulted in the maximum sustainable beam energy being limited to approximately half that of the design nominal, 3.5-4 TeV, for the first three years of operation (Run 1, 2009-2012) and a major consolidation campaign being scheduled for the first long shutdown (LS 1, 2012-2014). Throughout Run 1, a series of studies attempted to predict the amount of post-installation training quenches still required to qualify each circuit to nominal-energy current levels. With predictions in excess of 80 quenches (each having a recovery time of 8-12+ hours) just to achieve 6.5 TeV and close to 1000 quenches for 7 TeV, it was decided that for Run 2, all systems be at least qualified for 6.5 TeV operation. However, even with all interconnect discontinuities scheduled to be repaired during LS 1, numerous other concerns regarding circuit stability arose. In particular, observations of an erratic behaviour of magnet bypass diodes and the degradation of other potentially weak busbar sections, as well as observations of seemingly random millisecond spikes in beam losses, known as unidentified falling object (UFO) events, which, if persist at 6.5 TeV, may eventually deposit sufficient energy to quench adjacent magnets. In light of the above, the thesis hypothesis states that, even with the observed issues, the LHC main dipole circuits can safely support and sustain near-nominal proton beam energies of at least 6.5 TeV. Research into minimising the risk of magnet training led to the development and implementation of a new qualification method, capable of providing conclusive evidence that all aspects of all circuits, other than the magnets and their internal joints, can safely withstand a quench event at near-nominal current levels, allowing for magnet training to be carried out both systematically and without risk. This method has become known as the Copper Stabiliser Continuity Measurement (CSCM). Results were a success, with all circuits eventually being subject to a full current decay from 6.5 TeV equivalent current levels, with no measurable damage occurring. Research into UFO events led to the development of a numerical model capable of simulating typical UFO events, reproducing entire Run 1 measured event data sets and extrapolating to 6.5 TeV, predicting the likelihood of UFO-induced magnet quenches. Results provided interesting insights into the involved phenomena as well as confirming the possibility of UFO-induced magnet quenches. The model was also capable of predicting that such events, if left unaccounted for, are likely to be commonplace or not, resulting in significant long-term issues for 6.5+ TeV operation. Addressing the thesis hypothesis, the following written works detail the development and results of all CSCM qualification tests and subsequent magnet training as well as the development and simulation results of both 4 TeV and 6.5 TeV UFO event modelling. The thesis concludes, post-LS 1, with the LHC successfully sustaining 6.5 TeV proton beams, but with UFO events, as predicted, resulting in otherwise uninitiated magnet quenches and being at the forefront of system availability issues.