2 resultados para Municipal powers and services beyond corporate limits

em eResearch Archive - Queensland Department of Agriculture


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Models are abstractions of reality that have predetermined limits (often not consciously thought through) on what problem domains the models can be used to explore. These limits are determined by the range of observed data used to construct and validate the model. However, it is important to remember that operating the model beyond these limits, one of the reasons for building the model in the first place, potentially brings unwanted behaviour and thus reduces the usefulness of the model. Our experience with the Agricultural Production Systems Simulator (APSIM), a farming systems model, has led us to adapt techniques from the disciplines of modelling and software development to create a model development process. This process is simple, easy to follow, and brings a much higher level of stability to the development effort, which then delivers a much more useful model. A major part of the process relies on having a range of detailed model tests (unit, simulation, sensibility, validation) that exercise a model at various levels (sub-model, model and simulation). To underline the usefulness of testing, we examine several case studies where simulated output can be compared with simple relationships. For example, output is compared with crop water use efficiency relationships gleaned from the literature to check that the model reproduces the expected function. Similarly, another case study attempts to reproduce generalised hydrological relationships found in the literature. This paper then describes a simple model development process (using version control, automated testing and differencing tools), that will enhance the reliability and usefulness of a model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The achievement and measurement of improvements and innovations is not often an overt practice in the design and delivery of government services other than in health services. There is a need for specific mechanisms proven to increase the rate and scale of improvements and innovations in organisations, communities, regions and industries. This paper describes a model for the design, measurement and management of projects and services as systems for achieving and sustaining outcomes, improvements and innovations.The development of the model involved the practice of continuous improvement and innovation within and across a number of agricultural development projects in Australia and nternationally. Key learnings from the development and use of the model are: (1) all elements and factors critical for success can be implemented, measured and managed; (2) the design of a meaningful systemic measurement framework is possible; (3) all project partners can achieve and sustain rapid improvements and innovations; (4) outcomes can be achieved from early in the life of projects; and (5) significant spill-over benefits can be achieved beyond the scope, scale and timeframe of projects