2 resultados para Model compliant mechanisms

em eResearch Archive - Queensland Department of Agriculture


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bovine genital campylobacteriosis (BGC), caused by Campylobacter fetus subsp. venerealis, is associated with production losses in cattle worldwide. This study aimed to develop a reliable BGC guinea pig model to facilitate future studies of pathogenicity, abortion mechanisms and vaccine efficacy. Seven groups of five pregnant guinea pigs (1 control per group) were inoculated with one of three strains via intra-peritoneal (IP) or intra-vaginal routes. Samples were examined using culture, PCR and histology. Abortions ranged from 0 to 100 and re-isolation of causative bacteria from sampled sites varied with strain, dose of bacteria and time to abortion. Histology indicated metritis and placentitis, suggesting that the bacteria induce inflammation, placental detachment and subsequent abortion. Variation of virulence between strains was observed and determined by culture and abortion rates. IP administration of C. fetus subsp. venerealis to pregnant guinea pigs is a promising small animal model for the investigation of BGC abortion.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The achievement and measurement of improvements and innovations is not often an overt practice in the design and delivery of government services other than in health services. There is a need for specific mechanisms proven to increase the rate and scale of improvements and innovations in organisations, communities, regions and industries. This paper describes a model for the design, measurement and management of projects and services as systems for achieving and sustaining outcomes, improvements and innovations.The development of the model involved the practice of continuous improvement and innovation within and across a number of agricultural development projects in Australia and nternationally. Key learnings from the development and use of the model are: (1) all elements and factors critical for success can be implemented, measured and managed; (2) the design of a meaningful systemic measurement framework is possible; (3) all project partners can achieve and sustain rapid improvements and innovations; (4) outcomes can be achieved from early in the life of projects; and (5) significant spill-over benefits can be achieved beyond the scope, scale and timeframe of projects