2 resultados para Run-Time Code Generation, Programming Languages, Object-Oriented Programming
em Universidade Complutense de Madrid
Resumo:
New generation embedded systems demand high performance, efficiency and flexibility. Reconfigurable hardware can provide all these features. However the costly reconfiguration process and the lack of management support have prevented a broader use of these resources. To solve these issues we have developed a scheduler that deals with task-graphs at run-time, steering its execution in the reconfigurable resources while carrying out both prefetch and replacement techniques that cooperate to hide most of the reconfiguration delays. In our scheduling environment task-graphs are analyzed at design-time to extract useful information. This information is used at run-time to obtain near-optimal schedules, escaping from local-optimum decisions, while only carrying out simple computations. Moreover, we have developed a hardware implementation of the scheduler that applies all the optimization techniques while introducing a delay of only a few clock cycles. In the experiments our scheduler clearly outperforms conventional run-time schedulers based on As-Soon-As-Possible techniques. In addition, our replacement policy, specially designed for reconfigurable systems, achieves almost optimal results both regarding reuse and performance.
An Approach to Manage Reconfigurations and Reduce Area Cost in Hard Real-Time Reconfigurable Systems
Resumo:
This article presents a methodology to build real-time reconfigurable systems that ensure that all the temporal constraints of a set of applications are met, while optimizing the utilization of the available reconfigurable resources. Starting from a static platform that meets all the real-time deadlines, our approach takes advantage of run-time reconfiguration in order to reduce the area needed while guaranteeing that all the deadlines are still met. This goal is achieved by identifying which tasks must be always ready for execution in order to meet the deadlines, and by means of a methodology that also allows reducing the area requirements.