3 resultados para Optimal allocation of voltage regulators and capacitor
em Universidade Complutense de Madrid
Resumo:
This paper revises mainstream economic models which include time use in an explicit and endogenous manner, suggesting a extended theory which escape from the main problem existing in the literature. In order to do it, we start by presenting in section 2 the mainstream time use models in economics, showing their main features. Once this is done, we introduce the reader in the main problems this kind of well established models imply, within section 3, being the most highlighted the problem of joint production. Subsequently, we propose an extended theory which solves the problem of joint production; this is extensively described in section 4. Last, but not least, we apply this model to offer a time use analysis of the effect of a policy which increases the retirement age in a life-cycle perspective for a representative individual.
Resumo:
Seebeck nanoantennas, which are based on the thermoelectric effect, have been proposed for electromagnetic energy harvesting and infrared detection. The responsivity and frequency dependence of three types of Seebeck nanoantennas is obtained by electromagnetic simulation for different materials. Results show that the square spiral antenna has the widest bandwidth and the highest induced current of the three analyzed geometries. However, the geometry that presented the highest temperature gradient was the bowtie antenna, which favors the thermoelectric effect in a Seebeck nanoantenna. The results also show that these types of devices can present a voltage responsivity as high as 36 μV/W36 μV/W for titanium–nickel dipoles resonant at far-infrared wavelengths.
Resumo:
Given that landfills are depletable and replaceable resources, the right approach, when dealing with landfill management, is that of designing an optimal sequence of landfills rather than designing every single landfill separately. In this paper we use Optimal Control models, with mixed elements of both continuous and discrete time problems, to determine an optimal sequence of landfills, as regarding their capacity and lifetime. The resulting optimization problems involve splitting a time horizon of planning into several subintervals, the length of which has to be decided. In each of the subintervals some costs, the amount of which depends on the value of the decision variables, have to be borne. The obtained results may be applied to other economic problems such as private and public investments, consumption decisions on durable goods, etc.