3 resultados para management earnings forecast, information disclosure, Australia, continuous disclosure, litigation risk

em Chinese Academy of Sciences Institutional Repositories Grid Portal


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Guangxi Longtan Hydropower Station is not only a representative project of West Developing and Power Transmission from West to East in China, but also the second Hydropower Station to Three Gorges Project which is under construction in China. There are 770 X 104m3 creeping rock mass on the left bank slope in upper reaches, in which laid 9 water inlet tunnels and some underground plant buildings. Since the 435m high excavated slope threatens the security of the Dam, its deformation and stability is of great importance to the power station.Based on the Autodesk Map2004, Longtan Hydropower Station Monitoring Information System on Left Bank has been basically finished on the whole. Integrating the hydropower station monitoring information into Geographic Information System(GIS) environment, managers and engineers can dynamically gain the deformation information of the slop by query the symbols. By this means, designers can improve the correctness of analysis, and make a strategic and proper decision. Since the system is beneficial to effectively manage the monitoring-data, equitably save the cost of design and safe construction, and decrease the workload of the engineers, it is a successful application to the combination of hydropower station monitoring information management and computer information system technology.At the same time, on the basis of the geological analysis and rock mass toppling deformation and failure mechanism analysis of Longtan engineering left bank slope, the synthetic space-time analysis and influence factors analysis on the surface monitoring data and deep rock mass monitoring data of A-zone on left bank slope are carried on. It shows that the main intrinsic factor that effects the deformation of Zone A is the argillite limestone interbedding toppling structure, and its main external factors are rain and slope excavation. What's more, Degree of Reinforcement Demand(DRD) has been used to evaluate the slop reinforce effect of Zone A on left bank according to the Engineering Geomechanics-mate-Synthetics(EGMS). The result shows that the slop has been effective reinforced, and it is more stable after reinforce.At last, on the basis of contrasting with several forecast models, a synthetic forecast GRAV model has been presented and used to forecast the deformation of zone A on left bank in generating electricity period. The result indicates that GRAV model has good forecast precision, strong stability, and practical valuable reliability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

在激烈的市场竞争中,过程企业不仅要重视技术、更要加强管理,实现全局优化运行。提高过程企业的市场竞争能力必须全面综合集成人、组织、战略管理、经营管理、过程管理及信息自动化技术等因素。本文以石化企业为背景,对过程企业面临的问题及发展趋势进行了分析,并且对过程企业管理模式、过程企业的体系结构以及过程集成与优化技术进行了探讨。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

软件开发是一项高度复杂的活动,涉及到人员、过程、产品、客户等多种因素,这些因素中存在着大量的不确定性,在软件项目中表现为风险。风险能够给软件项目带来严重的危害,造成工程延期、成本超支、软件产品质量低下等各种问题,因此软件项目管理者必须对软件项目风险进行有效的管理。 软件项目风险管理是软件项目管理中不可或缺的重要组成部分,但是在实际的软件项目中,软件项目风险管理却常常被忽略,很多项目管理者凭自己的经验和直觉来管理软件项目风险。造成这种现象的原因除了软件企业的文化因素外,主要是因为软件项目管理者缺少操作层面上有效的风险管理方法和工具。 软件过程仿真能够分析软件过程的动态行为特性,预测软件过程执行的性能,是一种很好的软件项目分析和管理工具。软件过程仿真已经广泛应用于包括风险管理在内的软件项目管理的多个方面。多项研究已经表明软件过程仿真作为一种有效的风险管理方法和工具,能够很好的支持软件项目风险管理过程。 为了指导软件项目管理者使用软件过程仿真进行风险管理,本文提出了一种基于软件过程仿真的软件项目风险管理方法(SPS-RM)。该方法是一种使用软件过程仿真进行软件项目风险管理的通用方法框架,实现了“风险监控风险影响分析风险解决”的风险管理过程,并且为每个风险管理活动都提供了相应的过程仿真模型。SPS-RM方法还包括使用软件过程仿真进行风险管理的通用步骤,以及建立和分析过程仿真模型的一般方法,并为模型、步骤和方法都提供了详细的指导说明。 本文的主要贡献包括: 对软件过程仿真在软件项目风险管理中的应用和研究现状进行了调研。调研的目的是为了获得当前的研究进展,找出目前存在的问题,并指出未来可能的研究方向。调研的结果为本文的研究方向提供了很好的指导,也为本文的具体研究内容提供了良好的理论和实际依据。 提出了一种基于软件过程仿真的软件项目风险管理方法(SPS-RM)。该方法是一个使用软件过程仿真进行软件项目风险管理的通用方法框架,其目的是指导广大的软件项目管理者使用软件过程仿真有效的管理软件项目风险。SPS-RM是本文的核心方法,后面对两个具体风险的研究都是基于该方法进行的。 提出了需求变更风险分析仿真方法(RVSim)。需求变更是一种在软件项目中常见的、对软件项目影响较大的风险。本文基于SPS-RM方法对需求变更风险进行研究,提出了需求变更风险分析仿真方法。该方法以需求的横向和纵向跟踪信息为基础,对需求变更的处理过程进行仿真,能够量化的给出单个需求变更或者一系列需求变更对软件项目的时间和工作量的影响,帮助项目管理者更好的理解和管理需求变更风险。 提出了人员离职风险解决仿真方法(LF-ETRS)。人员离职是软件项目中的另一个重要风险。本文基于SPS-RM方法对人员离职风险进行研究,提出了人员离职风险解决仿真方法。该方法的主要特点是首次在对软件项目中的人员进行建模时同时考虑了人的学习和遗忘行为,因此能够更加准确的预测人员替代所需的时间和成本。另外,该方法还考虑了除人员替代外的其他解决措施,通过对多种解决措施进行建模和仿真,项目管理者可以根据项目的实际情况和仿真结果选择最合适的措施来解决人员离职风险。