6 resultados para Strategic decision model
em Chinese Academy of Sciences Institutional Repositories Grid Portal
Resumo:
水资源规划是一个复杂的系统规划问题,所以,在水资源规划中,含有大量的不精确的统计数据和模糊关系。由于这些特点,水资源规划必须用特殊的方法来解决。 本文将层次分析法(AHP)和模糊规划(Fuzzy Programming)方法相结合,形成了一种多目标规划的求解方法,并应用于大凌河流域水资源规划研究的课题中,通过实际分析可以看到,这种方法具有较好的实用性。
Resumo:
In the paper through extensive study and design, the technical plan for establishing the exploration database center is made to combine imported and self developed techniques. By research and repeated experiment a modern database center has been set up with its hardware and network having advanced performance, its system well configured, its data store and management complete, and its data support being fast and direct. Through study on the theory, method and model of decision an exploration decision assistant schema is designed with one decision plan of well location decision support system being evaluated and put into action. 1. Study on the establishment of Shengli exploration database center Research is made on the hardware configuration of the database center including its workstations and all connected hardware and system. The hardware of the database center is formed by connecting workstations, microcomputer workstations, disk arrays, and those equipments used for seismic processing and interpretation. Research on the data store and management includes the analysis of the contents to be managed, data flow, data standard, data QC, data backup and restore policy, optimization of database system. A reasonable data management regulation and workflow is made and the scientific exploration data management system is created. Data load is done by working out a schedule firstly and at last 200 more projects of seismic surveys has been loaded amount to 25TB. 2. Exploration work support system and its application Seismic data processing system support has the following features, automatic extraction of seismic attributes, GIS navigation, data order, extraction of any sized data cube, pseudo huge capacity disk array, standard output exchange format etc. The prestack data can be accessed by the processing system or data can be transferred to other processing system through standard exchange format. For supporting seismic interpretation system the following features exist such as auto scan and store of interpretation result, internal data quality control etc. the interpretation system is connected directly with database center to get real time support of seismic data, formation data and well data. Comprehensive geological study support is done through intranet with the ability to query or display data graphically on the navigation system under some geological constraints. Production management support system is mainly used to collect, analyze and display production data with its core technology on the controlled data collection and creation of multiple standard forms. 3. exploration decision support system design By classification of workflow and data flow of all the exploration stages and study on decision theory and method, target of each decision step, decision model and requirement, three concept models has been formed for the Shengli exploration decision support system including the exploration distribution support system, the well location support system and production management support system. the well location decision support system has passed evaluation and been put into action. 4. Technical advance Hardware and software match with high performance for the database center. By combining parallel computer system, database server, huge capacity ATL, disk array, network and firewall together to create the first exploration database center in China with reasonable configuration, high performance and able to manage the whole data sets of exploration. Huge exploration data management technology is formed where exploration data standards and management regulations are made to guarantee data quality, safety and security. Multifunction query and support system for comprehensive exploration information support. It includes support system for geological study, seismic processing and interpretation and production management. In the system a lot of new database and computer technology have been used to provide real time information support for exploration work. Finally is the design of Shengli exploration decision support system. 5. Application and benefit Data storage has reached the amount of 25TB with thousand of users in Shengli oil field to access data to improve work efficiency multiple times. The technology has also been applied by many other units of SINOPEC. Its application of providing data to a project named Exploration achievements and Evaluation of Favorable Targets in Hekou Area shortened the data preparation period from 30 days to 2 days, enriching data abundance 15 percent and getting information support from the database center perfectly. Its application to provide former processed result for a project named Pre-stack depth migration in Guxi fracture zone reduced the amount of repeated process and shortened work period of one month and improved processing precision and quality, saving capital investment of data processing of 30 million yuan. It application by providing project database automatically in project named Geological and seismic study of southern slope zone of Dongying Sag shortened data preparation time so that researchers have more time to do research, thus to improve interpretation precision and quality.
Resumo:
Decision Trees need train samples in the train data set to get classification rules. If the number of train data was too small, the important information might be missed and thus the model could not explain the classification rules of data. While it is not affirmative that large scale of train data set can get well model. This Paper analysis the relationship between decision trees and the train data scale. We use nine decision tree algorithms to experiment the accuracy, complexity and robustness of decision tree algorithms. Some results are demonstrated.
Resumo:
The propositional mu-calculus is a propositional logic of programs which incorporates a least fixpoint operator and subsumes the propositional dynamic logic of Fischer and Ladner, the infinite looping construct of Streett, and the game logic of Parikh. We give an elementary time decision procedure, using a reduction to the emptiness problem for automata on infinite trees. A small model theorem is obtained as a corollary.
Resumo:
Our Agent-based Software Process Modelling (ASPM) approach describes a software process as a set of cooperative agents. Negotiation is the way in which the agents construct their cooperative relations, and thus the software process. Currently, most negotiation models use a fixed negotiation protocol and fixed strategies. In order to achieve the flexibility that the negotiation of the agents in ASPM requires, we propose a negotiation model NM-PA. NM-PA mainly includes a generic negotiation protocol and some rules, which possibly change in different negotiation processes. By changing the rules, the model can support multi-protocols and multi-decision-making strategies at a lower cost.
Resumo:
Guangxi Longtan Hydropower Station is not only a representative project of West Developing and Power Transmission from West to East in China, but also the second Hydropower Station to Three Gorges Project which is under construction in China. There are 770 X 104m3 creeping rock mass on the left bank slope in upper reaches, in which laid 9 water inlet tunnels and some underground plant buildings. Since the 435m high excavated slope threatens the security of the Dam, its deformation and stability is of great importance to the power station.Based on the Autodesk Map2004, Longtan Hydropower Station Monitoring Information System on Left Bank has been basically finished on the whole. Integrating the hydropower station monitoring information into Geographic Information System(GIS) environment, managers and engineers can dynamically gain the deformation information of the slop by query the symbols. By this means, designers can improve the correctness of analysis, and make a strategic and proper decision. Since the system is beneficial to effectively manage the monitoring-data, equitably save the cost of design and safe construction, and decrease the workload of the engineers, it is a successful application to the combination of hydropower station monitoring information management and computer information system technology.At the same time, on the basis of the geological analysis and rock mass toppling deformation and failure mechanism analysis of Longtan engineering left bank slope, the synthetic space-time analysis and influence factors analysis on the surface monitoring data and deep rock mass monitoring data of A-zone on left bank slope are carried on. It shows that the main intrinsic factor that effects the deformation of Zone A is the argillite limestone interbedding toppling structure, and its main external factors are rain and slope excavation. What's more, Degree of Reinforcement Demand(DRD) has been used to evaluate the slop reinforce effect of Zone A on left bank according to the Engineering Geomechanics-mate-Synthetics(EGMS). The result shows that the slop has been effective reinforced, and it is more stable after reinforce.At last, on the basis of contrasting with several forecast models, a synthetic forecast GRAV model has been presented and used to forecast the deformation of zone A on left bank in generating electricity period. The result indicates that GRAV model has good forecast precision, strong stability, and practical valuable reliability.