9 resultados para Society for Savings (Bank : Hartford, Conn.)
em Chinese Academy of Sciences Institutional Repositories Grid Portal
Resumo:
《中国力学学会史》是《中国学会史丛书》之一。是一部全面系统记述中国力学学会建立与发展历程的专著。 《中国力学学会史》全书30万字,书中不但重点对学会的初创情况、发展过程、组织建设、学术交流、分支机构等进行了专门介绍,还特别收录了记述学会重大活动情况的大事记、名人与学会发展的丰富资料和一些极有史料价值的历史照片,旨在反映学会在不同时期的活动概况及其在中国力学界中发挥的桥梁与纽带作用。 中国力学学会是中国科协的组成部分,也是我国著名的学术团体之一,仅以此书的编著出版,纪念中国科协成立50周年和中国力学学会成立50多周年。本书可供力学界和科技界有关部门及工作者、各学会相关人员、大专院校师生参阅,也可作为组织和开展国内外学术交流研究的参考资料。
Resumo:
In this paper, we propose a new approach to construct a 2-dimensional (2-D) directional filter bank (DFB) by cascading a 2-D nonseparable checkerboard-shaped filter pair and 2-D separable cosine modulated filter bank (CMFB). Similar to diagonal subbands in 2-D separable wavelets, most of the subbands in 2-D separable CMFBs, tensor products of two 1-D CMFBs, are poor in directional selectivity due to the fact that the frequency supports of most of the subband filters are concentrated along two different directions. To improve the directional selectivity, we propose a new DFB to realize the subband decomposition. First, a checkerboard-shaped filter pair is used to decompose an input image into two images containing different directional information of the original image. Next, a 2-D separable CMFB is applied to each of the two images for directional decomposition. The new DFB is easy in design and has merits: low redundancy ratio and fine directional-frequency tiling. As its application, the BLS-GSM algorithm for image denoising is extended to use the new DFBs. Experimental results show that the proposed DFB achieves better denoising performance than the methods using other DFBs for images of abundant textures. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
Flowering and seed-bank development of annual Zostera marina L. and perennial Z. noltii hornem. were studied in the Zandkreek (S.W. Netherlands). Flowering of Z. noltii started at the end of June and continued until the end of September. A maximum of ca. 1000 flowering shoots (11% of the total amount of shoots per square metre) occurred in early August. Flowering of Z. marina started at the end of July and continued throughout October. Seed banks of both species appeared to be annual. Actual seed densities of Z. noltii were much lower than predicted on the basis of the amount of inflorescences.Germination was studied in the laboratory in relation to temperature (10, 20 and 30°C), salinity (1.0, 10.0, 20.0, 30.0 and 40.0‰) and stratification (at 4°C). Both species showed a maximal germination at 30°C and 1.0‰ salinity, decreasing with higher salinities and lower temperatures. Stratification stimulated germination only at salinities 20.0‰. Desiccation and anaerobia were lethal to Z. marina seeds. Seedlings of Z. marina survived best at 10°C and 10.0–20.0‰ salinity and those of Z. noltii survived best at 10°C and 1.0‰ salinity. Overall, seedlings of Z. marina survived better than those of Z. noltii.
Resumo:
In order to realize fast development of the national economy in a healthy way and coordinate progress with whole society, the country has implemented the strategy of development of the western region. An important action of finishing this strategic task is to accelerate the highway construction in the western region, join the western region and places along the coast, the river, the border with goods and materials, technology, and personnel interchanges, and then drive development of the local economy.The western region was influenced by the Himalaya Tectonization in Cenozoic, and the crust rose and became the plateau. In the course of rising, rivers cut down sharply to form a lot of high mountains and gorges.Because of topography and geomorphology, bridges in the traffic construction in the alpine gorge area are needed. Rivers have characteristics of large flow, fast velocity and high and steep river valley, so building a pier in the river is not only very difficult, but also making the cost increase. At the same time, the impact that the pier is corroded and the bridge base that is drawn to be empty by flow are apt to cause destruction of the pier. For those reasons, suspending bridge and cable-stay bridge are usually adopted with the single and large span. For the large span bridge, the pier foundation could receive ten thousand and more vertical strength, bending moment and near kiloton horizontal thrust.Because bank slope in the alpine gorge district is cut deeply and unsettled big, natural stability is worse under endogenic and exogenic force. When bank slope bears heavy vertical strength, bending moment and horizontal thrust facing the river, it will inevitably make the balance state of rock and soil mass change, bridge bank slope deform, and even destroyed. So the key problem at the time of the large span's bridge construction in the alpine gorge area is how to make it stable.So based on the spot investigation, the Engineering Geology Analysis Method is very important to grasp the bank slope stability. It can provide the bank slope stability macroscopic ally and qualitatively, and reference to the indoor calculation. The Engineering Geology Analysis Method is that by way of analyzing and investigating terms of bank slope instability, stability development trend, the ancient rock slide and devolution in the site, stability comprehensive evaluation primarily, current and future stability of bank slope is gotten, realizing the intention to serving the concrete engineering.After the Engineering Geology Analysis Method is applied to project instances of BeiPan River Bridge and BaLin River Bridge, results are accord with bank slope actual conditions, which proves sites are suited to building bridges from site stability.we often meet bank slope stability issues in the traffic construction in the alpine gorge areao Before the evaluation of the bank slope stability, the engineering geological condition is investigated first. After that, the next exploration target and geology measures are decided. So, the Engineering Geology Analysis Method that the investigation of the engineering geological condition is the main content is quite important in practice. The other evaluations of the bank slope stability are based on it. Because foundation receives very heavy load, for the big span's bridge in the alpine gorge area, a long pile of the large diameter (D^0.8m) is usually selected. In order to reflect rock mass's deformation properties under rock-socketed pile function, the author has used the FLAG30 software for rock and soil mass and done many numerical simulations. By them, the author launches the further investigation on deformation properties of bank slope under different slope angle, pile length, diameter, elastic modulus, load, bank slope's structure, etc. Some conclusion meaningful to the design and produce are obtained.