6 resultados para Pier Bottoni

em Chinese Academy of Sciences Institutional Repositories Grid Portal


Relevância:

10.00% 10.00%

Publicador:

Resumo:

采用粒子图像测速技术和粒子图像识别技术研究了冲刷坑的演化过程及局部冲刷的流体动力机制.首先研究了动床条件下圆柱周围的床面演化过程,给出垂直对称面输沙率随时间变化以及圆柱下游垂直对称面的沙颗粒浓度和泥沙分布规律;其次针对典型冲刷坑形状固定底床,测量了圆柱下游的瞬时流场,并给出平均流场.结果表明尾流区平均剪应力较低,但垂向涡量和湍流强度较高.分析指出平均剪应力较低的尾流区域,局部冲刷的主要动力机制是尾涡和湍流的综合作用.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Expansion of economic activities, urbanisation, increased resource use and population growth are continuously increasing the vulnerability of the coastal zone. This vulnerability is now further raised by the threat of climate change and accelerated sea level rise. The potentially severe impacts force policy-makers to also consider long-term planning for climate change and sea level rise. For reasons of efficiency and effectiveness this long-term planning should be integrated with existing short-term plans, thus creating an Integrated Coastal Zone Management programme. As a starting point for coastal zone management, the assessment of a country's or region's vulnerability to accelerated sea level rise is of utmost importance. The Intergovernmental Panel on Climate Change has developed a common methodology for this purpose. Studies carried out according to this Common Methodology have been compared and combined, from which general conclusions on local, regional and global vulnerability have been drawn, the latter in the form of a Global Vulnerability Assessment. In order to address the challenge of coping with climate change and accelerated sea level rise, it is essential to foresee the possible impacts, and to take precautionary action. Because of the long lead times needed for creating the required technical and institutional infrastructures, such action should be taken in the short term. Furthermore, it should be part of a broader coastal zone management and planning context. This will require a holistic view, shared by the different institutional levels that exist, along which different needs and interests should be balanced.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

本文主要利用ECOMSED模式对长江口及邻近海域的水文、泥沙过程进行三维数值模拟,并结合实测资料分析其水动力、泥沙输运、底床冲淤等特征;然后利用欧拉二相流模型模拟小尺度条件下长江口底床上圆桩周围的水流和泥沙冲刷、输运规律。 通过资料分析和ECOMSED数值模拟结果比较,我们得出:长江口口门内为非正规半日潮流区,潮流运动形式多为往复流,落潮流占优。落潮流速大于涨潮流速,流速垂向分布从表层到底层递减。悬沙浓度与流速关系密切,一般来说,流速越大,悬沙浓度越高;一个潮周期过程中会出现两次、三次或四次泥沙再悬浮,分别是涨急、落急、涨转落、落转涨时刻;盐水楔结构对粘性与非粘性悬沙浓度的分布起决定性作用,转流时泥沙再悬浮主要是由于这时会出现盐水楔,并形成垂向环流,使床面大量未被固结的泥沙再悬浮,形成峰值。悬浮泥沙垂向分布可分为垂线型,斜线型,抛物线型和L型。流场和底床冲淤变化与水深关系密切:深水区,流速较大,底床冲淤变化也较大。其中,受径流影响区表现为淤积,受潮流影响区表现为冲刷;浅水区基本表现为淤积。 从模式运行结果和实测资料比较可以看出,该模型可以较好的模拟长江口水流、悬浮泥沙分布与变化;能够再现在径流入海口处,盐水楔结构及其诱生的垂向环流从形成到发展,又到消失的完整过程;也能够展示底床的冲淤变化。对于我们模拟长江口背景流场,了解该区域内水动力变化、悬浮泥沙输运、底床冲淤等有重要意义。 在欧拉二相流模型对长江口底床上圆桩周围的水流和局部冲刷数值模拟过程中,我们不仅考虑水流和泥沙之间的作用,还引入泥沙颗粒之间的相互影响。模拟结果较合理的展示了圆桩周围的流场类型和底床冲刷变化:在圆桩前方,流速减小并形成垂向涡旋,从而产生局部冲刷;在圆桩两侧,水流加速,挟带上游泥沙向下输送,并在内侧堆积;而在圆桩后面,存在流速分离区。在该分离区内流速很小,并且当流速较大时,会产生回流,形成两个对称的漩涡。流速越大,圆桩前由垂向涡旋引起的局部冲刷就越明显;而当底床泥沙粒径变小时,泥沙临界起动流速变小,底床也更容易被冲刷。悬浮泥沙浓度分布受流场的影响,并且当粒径小而流速大时,能悬浮到更高的深度。

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A series of simulation experiments on carbon steel (A(3) steel) and low alloy steel (16 Mn steel) in marine atmosphere (MA), seawater (SW) and seabed sediment (SBS) including rough sea sand, fine sea sand and seabed mud were carried out indoors for a year or so by means of individually hanging plates (IHP) and electrically connected hanging plates (ECHP). The corrosion of steels in SBS was mainly due to the macrogalvanic cell effect. The steel plates at the bottom of SBS, as the anode of a macrogalvanic cell, showed the heaviest corrosion with a corrosion rate of up to 0.12 mm/a, approximately equal to that of steel plates in marine atmosphere. The test results showed that the corrosion rates of A(3) and 16 Mn steel in marine environment were in the order: MA > SW > SBS by the IHP method; and MA > SBS > SW by the ECHP method. The corrosion rates of steels in the water/sediment interface were directly proportional to the grain size of the SBS by the ECHP method, but those of steels in the water/sediment interface did not vary with the grain size of SBS by the IHP method. The corrosion rate of low-alloy steel was a little higher than that of carbon steel. The results of this study have important applications for design of offshore steel structures such as oil platform, pier, and port.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The anchorages are unparalleled structures only in a suspension bridge, and as main bearing facilities, play an important role in connecting the superstructures and the ground. The tunnel anchorage, as one alternative type of the anchorages, has more advantages over its counterpart, the gravity anchorage. With the tunnel anchorages adopted, not only can surface excavation be reduced to protect the environment, and natural condition of the rock be utilized and potential bearing capacity of surrounding rock be mobilized to save engineering cost, but also the technological predominance of auxiliary engineering measures, such as prestressed concrete, anchoring piles, rock anchors and collar beam between the two separated anchorages, can be easily cooperated to work together harmoniously under the circumstances of poor rock quality. There are plentiful high mountains and deep canyons in west part of China, and long-span bridge construction is inevitably encountered in order to realize leapfrogging development of the transportation infrastructure. Western mountainous areas usually possess the conditions for constructing tunnel anchorages, and therefore, the tunnel anchorages, which are conformed to the conception of resource conservative and sustainable society, extremely have application and popularization value in western underdeveloped region. The scientific and technological problem about the design, construction and operation of tunnel anchorages should be further investigated. Combining the engineering of western tunnel anchorages for the Balinghe Suspension Bridge, this paper probed into the survey method and in-situ test method for tunnel anchorages, scientific rock quality evaluation of surrounding rock to provide reasonable physical and mechanical parameters for design, construction and operation of tunnel anchorages, bearing capacity estimation for tunnel anchorage, deformation prediction of the anchorage-rockmass system, tunnel-anchorage slope stability analysis and the evaluation of excavation stability and degree of safety of the anchorage tunnel. The following outcomes were obtained: 1. Materials of tunnel anchorages of suspension bridge built (and in progress) at home and abroad were systematically sorted out, with the engineering geological condition and geomechanical property of surrounding rock around the anchorage tunnel, the design size of anchorages and the construction method of anchorage tunnel paid more emphasis on, to unveil the internal relationship between the engineering geological conditions of surrounding rock and the design size and axis angle of anchorages and provide references for future design, construction and study of tunnel anchorages. 2. Physical and mechanical parameters were recommended based on three domestic and foreign methods of rock quality evaluation. 3. In-situ tests, adopting the back-thrust method, of two kinds of reduced scale model, 1/30 and 1/20, for the tunnel anchorages were conducted in the declining exploration drift with rock mass at the test depth being the same as surrounding rock around real anchorages, and reliable field rockmass displacement data were acquired. Attenuation relation between the increment of distance from the anchorage and the decrement of rockmass displacement under maximum test load, and influential scope suffered by anchorage load were obtained. 4. Using similarity theory, the magnitude of real anchorage and rockmass displacement under design load and degree of safety of the anchorage system were deduced. Furthermore, inversion analysis to deformation modulus of slightly weathered dolomite rock, the surrounding rock of anchorage tunnel, was performed by the means of numerical simulation. 5. The influential law of the geometrical size to the limit bearing capacity of tunnel anchorage was studied. 6. Based on engineering geological survey data, accounting for the combination of strata layer and adverse discontinuities, the failure patterns of tunnel anchorage slope were divided into three modes: sliding of splay saddle pier slope, superficial-layer slippage, and deep-layer slippage. Using virtual work principle and taking anchorage load in account, the stability of the three kinds of failure patterns were analyzed in detail. 7. The step-by-step excavation of anchorage tunnel, the numerical overload and the staged decrement of rock strength parameters were numerically simulated to evaluate the excavation stability of surrounding rock around anchorage tunnel, the overload performance of tunnel anchorage, and the safety margin of strength parameters of the surrounding rock.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In order to realize fast development of the national economy in a healthy way and coordinate progress with whole society, the country has implemented the strategy of development of the western region. An important action of finishing this strategic task is to accelerate the highway construction in the western region, join the western region and places along the coast, the river, the border with goods and materials, technology, and personnel interchanges, and then drive development of the local economy.The western region was influenced by the Himalaya Tectonization in Cenozoic, and the crust rose and became the plateau. In the course of rising, rivers cut down sharply to form a lot of high mountains and gorges.Because of topography and geomorphology, bridges in the traffic construction in the alpine gorge area are needed. Rivers have characteristics of large flow, fast velocity and high and steep river valley, so building a pier in the river is not only very difficult, but also making the cost increase. At the same time, the impact that the pier is corroded and the bridge base that is drawn to be empty by flow are apt to cause destruction of the pier. For those reasons, suspending bridge and cable-stay bridge are usually adopted with the single and large span. For the large span bridge, the pier foundation could receive ten thousand and more vertical strength, bending moment and near kiloton horizontal thrust.Because bank slope in the alpine gorge district is cut deeply and unsettled big, natural stability is worse under endogenic and exogenic force. When bank slope bears heavy vertical strength, bending moment and horizontal thrust facing the river, it will inevitably make the balance state of rock and soil mass change, bridge bank slope deform, and even destroyed. So the key problem at the time of the large span's bridge construction in the alpine gorge area is how to make it stable.So based on the spot investigation, the Engineering Geology Analysis Method is very important to grasp the bank slope stability. It can provide the bank slope stability macroscopic ally and qualitatively, and reference to the indoor calculation. The Engineering Geology Analysis Method is that by way of analyzing and investigating terms of bank slope instability, stability development trend, the ancient rock slide and devolution in the site, stability comprehensive evaluation primarily, current and future stability of bank slope is gotten, realizing the intention to serving the concrete engineering.After the Engineering Geology Analysis Method is applied to project instances of BeiPan River Bridge and BaLin River Bridge, results are accord with bank slope actual conditions, which proves sites are suited to building bridges from site stability.we often meet bank slope stability issues in the traffic construction in the alpine gorge areao Before the evaluation of the bank slope stability, the engineering geological condition is investigated first. After that, the next exploration target and geology measures are decided. So, the Engineering Geology Analysis Method that the investigation of the engineering geological condition is the main content is quite important in practice. The other evaluations of the bank slope stability are based on it. Because foundation receives very heavy load, for the big span's bridge in the alpine gorge area, a long pile of the large diameter (D^0.8m) is usually selected. In order to reflect rock mass's deformation properties under rock-socketed pile function, the author has used the FLAG30 software for rock and soil mass and done many numerical simulations. By them, the author launches the further investigation on deformation properties of bank slope under different slope angle, pile length, diameter, elastic modulus, load, bank slope's structure, etc. Some conclusion meaningful to the design and produce are obtained.