59 resultados para Mountain Chief Mine

em Chinese Academy of Sciences Institutional Repositories Grid Portal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Three-dimensional discrete element face-to-face contact model with fissure water pressure is established in this paper and the model is used to simulate three-stage process of landslide under fissure water pressure in the opencast mine, according to the actual state of landslide in Panluo iron mine where landslide happened in 1990 and was fathered in 1999. The calculation results show that fissure water pressure on the sliding surface is the main reason causing landslide and the local soft interlayer weakens the stability of slope. If the discrete element method adopts the same assumption as the limit equilibrium method, the results of two methods are in good agreement; while if the assumption is not adopted in the discrete element method, the critical phi numerically calculated is less than the one calculated by use of the limit equilibrium method for the same C. Thus, from an engineering point of view, the result from the discrete element model simulation is safer and has more widely application since the discrete element model takes into account the effect of rock mass structures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, the analytical model coupling the convective boundary layer (CBL) with the free atmosphere developed by Qi and Fu (1992) is improved. And by this improved model, the interaction between airflow over a mountain and the CBL is further discussed. The conclusions demonstrate: (1) The perturbation potential temperatures in the free atmosphere can counteract the effect of orographic thermal forcing through entraining and mixing in the CBL. If u(M)BAR > u(F)BAR, the feedback of the perturbation potential temperatures in the free atmosphere is more important than orographic thermal forcing, which promotes the effect of interfacial waves. If u(M)BAR < u(F)BAR, orographic thermal forcing is more important, which makes the interfacial height and the topographic height identical in phase, and the horizontal speeds are a maximum at the top of the mountain. (2) The internal gravity waves propagating vertically in the free atmosphere cause a strong downslope wind to become established above the lee slope in the CBL and result in the hydraulic jump at the top of the CBL. (3) With the CBL deepening, the interfacial gravity waves induced by the potential temperature jump at the top of the CBL cause the airflow in the CBL to be subcritical.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In order to obtain the distribution rules of in situ stress and mining-induced stress of Beiminghe Iron Mine, the stress relief method by overcoring was used to measure the in situ stress, and the MC type bore-hole stress gauge was adopted to measure the mining-induced stress. In the in situ stress measuring, the technique of improved hollow inclusion cells was adopted, which can realize complete temperature compensation. Based on the measuring results, the distribution model of in situ stress was established and analyzed. The in situ stress measuring result shows that the maximum horizontal stress is 1.75-2.45 times of vertical stress and almost 1.83 times of the minimum horizontal stress in this mineral field. And the mining-induced stress measuring result shows that, according to the magnitude of front abutment pressure the stress region can be separated into stress-relaxed area, stress-concentrated area and initial stress area. At the -50 m mining level of this mine, the range of stress-relaxed area is 0-3 m before mining face; the range of stress-concentrated area is 3-55 m before mining face, and the maximum mining-induced stress is 16.5-17.5 MPa, which is 15-20 m from the mining face. The coefficient of stress concentration is 1.85.