35 resultados para Load Balancing
em Chinese Academy of Sciences Institutional Repositories Grid Portal
Resumo:
中国计算机学会
Resumo:
为了提高实时集群系统中各节点的利用率并防止出现CPU使用率的热点,研究了实时集群系统中基于反馈控制的实时调度框架,并提出了一种新的面向任意图结构的负载平衡算法。该算法基于差异迁移系数和扩散负载平衡原理指导任务迁移以实现系统负载均衡,同时结合反馈控制以避免系统节点使用率振荡。实验结果表明,该算法不仅实现了节点间负载平衡、有效避免了局部热点,而且与反馈控制算法有机集成,保证整个系统稳定运行。
Resumo:
柔性制造系统使生产加工路径有很多可选性,所以调度系统必须考虑机器调度问题。分配规则调度是一种最基本、最具影响力的动态调度方法。然而,分配规则调度方法很少考虑机器顺序选择。兼顾工件选择和机器选择两方面,本文运用交互投标过程,构建基于合同网协议调度的协商规则。研究作业车间动态调度问题,提出并构建了5种合同网规则调度方法。通过实验分析结果表明,基于合同网交互投标模式的规则调度能够大大改善调度系统性能,提高设备的利用率和设备负荷平衡指标。
Resumo:
基于鞍钢新轧集团股份有限公司冷轧薄板厂MES工程的实际情况,介绍了机组排产作业计划过程中的任务分配方法。该方法以机组与生产任务的最佳匹配、机组的负荷平衡为性能指标,采用了实时最小负荷分配规则,科学地解决了冷轧生产线CIMS环境下机组排产作业计划的在线生成问题,实现了生产线上的生产路径优化控制,从而提高了生产质量和设备利用率。
Resumo:
Landslide is a kind of serious geological hazards and its damage is very great. In recent years, landslides become more and more frequent along with increase of scale of engineering constructions and cause greater loss. Consequently, how to protect landslides has become important research subject in the engineering field. This paper improves the method how to compute landslide thrust and solves the irrational problem in the design of piles because of the irrational landslide thrust according to the theory and technology of existed anti-slide piles and pre-stressed cable anti-slide piles. Modern pre-stressing technology has been introduced and load balancing method has been used to improve the stressing behavior of anti-slide piles. Anchor cables, anti-slide piles and modern pre-stressing technology have been used to prevention complicated landslide. It is an important base to select values for the landslide thrust. An improved method to calculate design thrust of anti-slide piles has been presented in this paper on the base of residual thrust method by comparing existing methods to select values of landslide thrust in the design of anti-slide piles. In the method, residual landslide thrust behind the anti-slide piles and residual skid resistance before the piles has been analyzed, equitable distribution of residual landslide thrust behind the piles has been realized, and the method to select value of design thrust becomes more reasonable. The pre-stressed cable anti-slide piles are developed from the common anti-slide piles and are common method to prevent landslide. Their principle is that internal force of anti-slide piles is adjusted and size of section is diminished by changing constraint conditions of anti-slide piles. For landslides with deep slip surface and large scale of slopes, limitation of the method appears. Such landslides are in need of long piles and anchor cables which are not only non-economic but also can generate larger deformation and leave potential danger after prevention. For solving the problem, a new kind of anti-slide piles, inner pre-stressing force anti-slide piles, is presented in this paper, and its principle is that an additional force, which is generated in the inner anti-slide piles by arranging pre-stressed reinforcement or tight wire in a certain form in interior of anti-slide piles and stretching the steel reinforcement or tight wire, may balance out the internal force induced by landslide thrust whole or partly (load balancing method). The method will change bending moment which anti-slide piles are not good at bearing into compressive stress which piles are good at bearing, improve stressing performance of anti-slide piles greatly, diminish size of section, and make anti-slide piles not fissured in the natural service or postpone appearance of the fissures, and improve viability of anti-slide piles. Pre-stressed cable anti-slide piles and inner pre-stressing force anti-slide piles go by the general name of pre-stressed structure anti-slide piles in the paper, and their design and calculation method is also analyzed. A new calculation method is provided in the paper for design of anti-slide piles. For pre-stressed structure anti-slide piles, a new computation mode is firstly presented in the paper on the foundation of cantilever piles. In the mode, constraint form of load-bearing section of the anti-slide piles should be confirmed according to reservoir conditions in order to figure out amount of pre-stress of the anchor cables, and internal force should be analyzed for the load-bearing section of pre-stressed structure anti-slide piles so as to confirm anchorage section of anti-slide piles. Pre-stressed cables of the pre-stressed cable anti-slide piles can be arranged as required. This paper analyzes the load-bearing section of single-row and double-row pre-stressed cable anti-slide piles and provides a calculation method for design of the pre-stressed cable anti-slide piles. Inner pre-stressing force anti-slide piles are a new kind of structural style. Their load-bearing section is divided into four computation modes according to whether pre-stressed cables are applied for exterior of the anti-slide piles, and whether single-row or double-row exterior pre-stressed cables are applied. The load balancing method is used to analyze the computation modes for providing a method to design the inner pre-stressing force anti-slide piles rationally. Pre-stressed cable anti-slide piles and inner pre-stressing force anti-slide piles are applied to research on Mahe landfall in Yalong Lenggu hydropower station by the improved method to select value of design thrust of anti-slide piles. A good effect is obtained in the analysis.
Resumo:
Numerical modeling of groundwater is very important for understanding groundwater flow and solving hydrogeological problem. Today, groundwater studies require massive model cells and high calculation accuracy, which are beyond single-CPU computer’s capabilities. With the development of high performance parallel computing technologies, application of parallel computing method on numerical modeling of groundwater flow becomes necessary and important. Using parallel computing can improve the ability to resolve various hydro-geological and environmental problems. In this study, parallel computing method on two main types of modern parallel computer architecture, shared memory parallel systems and distributed shared memory parallel systems, are discussed. OpenMP and MPI (PETSc) are both used to parallelize the most widely used groundwater simulator, MODFLOW. Two parallel solvers, P-PCG and P-MODFLOW, were developed for MODFLOW. The parallelized MODFLOW was used to simulate regional groundwater flow in Beishan, Gansu Province, which is a potential high-level radioactive waste geological disposal area in China. 1. The OpenMP programming paradigm was used to parallelize the PCG (preconditioned conjugate-gradient method) solver, which is one of the main solver for MODFLOW. The parallel PCG solver, P-PCG, is verified using an 8-processor computer. Both the impact of compilers and different model domain sizes were considered in the numerical experiments. The largest test model has 1000 columns, 1000 rows and 1000 layers. Based on the timing results, execution times using the P-PCG solver are typically about 1.40 to 5.31 times faster than those using the serial one. In addition, the simulation results are the exact same as the original PCG solver, because the majority of serial codes were not changed. It is worth noting that this parallelizing approach reduces cost in terms of software maintenance because only a single source PCG solver code needs to be maintained in the MODFLOW source tree. 2. P-MODFLOW, a domain decomposition–based model implemented in a parallel computing environment is developed, which allows efficient simulation of a regional-scale groundwater flow. The basic approach partitions a large model domain into any number of sub-domains. Parallel processors are used to solve the model equations within each sub-domain. The use of domain decomposition method to achieve the MODFLOW program distributed shared memory parallel computing system will process the application of MODFLOW be extended to the fleet of the most popular systems, so that a large-scale simulation could take full advantage of hundreds or even thousands parallel processors. P-MODFLOW has a good parallel performance, with the maximum speedup of 18.32 (14 processors). Super linear speedups have been achieved in the parallel tests, indicating the efficiency and scalability of the code. Parallel program design, load balancing and full use of the PETSc were considered to achieve a highly efficient parallel program. 3. The characterization of regional ground water flow system is very important for high-level radioactive waste geological disposal. The Beishan area, located in northwestern Gansu Province, China, is selected as a potential site for disposal repository. The area includes about 80000 km2 and has complicated hydrogeological conditions, which greatly increase the computational effort of regional ground water flow models. In order to reduce computing time, parallel computing scheme was applied to regional ground water flow modeling. Models with over 10 million cells were used to simulate how the faults and different recharge conditions impact regional ground water flow pattern. The results of this study provide regional ground water flow information for the site characterization of the potential high-level radioactive waste disposal.
Resumo:
The phenomena of the 'piling up' and 'sinking-in' of surface profiles in conical indentation in elastic-plastic solids with work hardening are studied using dimensional and finite-element analysis. The degree of sinking in and piling up is shown to depend on the ratio of the initial yield strength Y to Young's modulus E and on the work-hardening exponent n. The widely used procedure proposed by Oliver and Pharr for estimating contact depth is then evaluated systematically. By comparing the contact depth obtained directly from finite-element calculations with that obtained from the initial unloading slope using the Oliver-Pharr procedure, the applicability of the procedure is discussed.
Resumo:
The Load/Unload Response Ratio (LURR) method is proposed for short-to-intermediate-term earthquake prediction [Yin, X.C., Chen, X.Z., Song, Z.P., Yin, C., 1995. A New Approach to Earthquake Prediction — The Load/Unload Response Ratio (LURR) Theory, Pure Appl. Geophys., 145, 701–715]. This method is based on measuring the ratio between Benioff strains released during the time periods of loading and unloading, corresponding to the Coulomb Failure Stress change induced by Earth tides on optimally oriented faults. According to the method, the LURR time series usually climb to an anomalously high peak prior to occurrence of a large earthquake. Previous studies have indicated that the size of critical seismogenic region selected for LURR measurements has great influence on the evaluation of LURR. In this study, we replace the circular region usually adopted in LURR practice with an area within which the tectonic stress change would mostly affect the Coulomb stress on a potential seismogenic fault of a future event. The Coulomb stress change before a hypothetical earthquake is calculated based on a simple back-slip dislocation model of the event. This new algorithm, by combining the LURR method with our choice of identified area with increased Coulomb stress, is devised to improve the sensitivity of LURR to measure criticality of stress accumulation before a large earthquake. Retrospective tests of this algorithm on four large earthquakes occurred in California over the last two decades show remarkable enhancement of the LURR precursory anomalies. For some strong events of lesser magnitudes occurred in the same neighborhoods and during the same time periods, significant anomalies are found if circular areas are used, and are not found if increased Coulomb stress areas are used for LURR data selection. The unique feature of this algorithm may provide stronger constraints on forecasts of the size and location of future large events.
Resumo:
A series of acoustic emission (AE) experiments of rock failure have been conducted under cyclic load in tri-axial stress tests. To simulate the hypocenter condition the specimens are loaded by the combined action of a constant stress, intended to simulate
Resumo:
The main idea of the Load-Unload Response Ratio (LURR) is that when a system is stable, its response to loading corresponds to its response to unloading, whereas when the system is approaching an unstable state, the response to loading and unloading becomes quite different. High LURR values and observations of Accelerating Moment/Energy Release (AMR/AER) prior to large earthquakes have led different research groups to suggest intermediate-term earthquake prediction is possible and imply that the LURR and AMR/AER observations may have a similar physical origin. To study this possibility, we conducted a retrospective examination of several Australian and Chinese earthquakes with magnitudes ranging from 5.0 to 7.9, including Australia's deadly Newcastle earthquake and the devastating Tangshan earthquake. Both LURR values and best-fit power-law time-to-failure functions were computed using data within a range of distances from the epicenter. Like the best-fit power-law fits in AMR/AER, the LURR value was optimal using data within a certain epicentral distance implying a critical region for LURR. Furthermore, LURR critical region size scales with mainshock magnitude and is similar to the AMR/AER critical region size. These results suggest a common physical origin for both the AMR/AER and LURR observations. Further research may provide clues that yield an understanding of this mechanism and help lead to a solid foundation for intermediate-term earthquake prediction.
Resumo:
Three models, JKR (Johnson, Kendall and Roberts), DMT (Derjaguin, Muller, and Toporov) andMD (Maugis-Dugdale),are compared with the Hertz model in dealing with nano-contact problems. It has been shown that both the dimensionless load parameter, P D P=.1/4
Resumo:
The Load-Unload Response Ratio (LURR) method is an intermediate-term earthquake prediction approach that has shown considerable promise. It involves calculating the ratio of a specified energy release measure during loading and unloading where loading and unloading periods are determined from the earth tide induced perturbations in the Coulomb Failure Stress on optimally oriented faults. In the lead-up to large earthquakes, high LURR values are frequently observed a few months or years prior to the event. These signals may have a similar origin to the observed accelerating seismic moment release (AMR) prior to many large earthquakes or may be due to critical sensitivity of the crust when a large earthquake is imminent. As a first step towards studying the underlying physical mechanism for the LURR observations, numerical studies are conducted using the particle based lattice solid model (LSM) to determine whether LURR observations can be reproduced. The model is initialized as a heterogeneous 2-D block made up of random-sized particles bonded by elastic-brittle links. The system is subjected to uniaxial compression from rigid driving plates on the upper and lower edges of the model. Experiments are conducted using both strain and stress control to load the plates. A sinusoidal stress perturbation is added to the gradual compressional loading to simulate loading and unloading cycles and LURR is calculated. The results reproduce signals similar to those observed in earthquake prediction practice with a high LURR value followed by a sudden drop prior to macroscopic failure of the sample. The results suggest that LURR provides a good predictor for catastrophic failure in elastic-brittle systems and motivate further research to study the underlying physical mechanisms and statistical properties of high LURR values. The results provide encouragement for earthquake prediction research and the use of advanced simulation models to probe the physics of earthquakes.