4 resultados para Illinois Comprehensive Cancer Control Program.

em Chinese Academy of Sciences Institutional Repositories Grid Portal


Relevância:

100.00% 100.00%

Publicador:

Resumo:

在现有的工业控制系统中经常使用PLC实现顺序控制、定时等功能.控制程序经常需要执行同步操作且输入开关量的触发时机具有不确定性,因此无法充分描述真实的执行过程.为此提出下述解决方法:首先在控制程序的编译阶段,使用Petri网建立网模型以表示程序执行逻辑,其次在控制程序的执行阶段,根据程序真实执行状况动态运行上述网模型,当程序运行结束时网模型停止执行,由此判断程序中存在的逻辑错误.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

报道了基于双面反射镜的N×N光开关器件。介绍了使用双面反射镜的2×2, 4×4光开关的集成光路设计和工作原理; 采用Benes网络, 以2×2和4×4光开关为基本单元的N×N光开关器件的整体结构, 并根据“一笔画”原理, 分析了4×4, 8×8和16×16光开关矩阵的可重排无阻塞特性和光开关矩阵的光路选择算法。最后, 基于2×2, 4×4光开关技术制备了16×16光开关矩阵。测试表明, 该器件具有良好的插入损耗、回波损耗、串扰和开关时间等性能, 从而验证了设计思想和工艺的可行性。在基于双面反射镜的光开关矩

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Under the auspices of the 'knowledge-Innovation Program' of CAS, Institute of Geology and Geophysics has established the Broadband Seismic Laboratory. A new kind of 24-bit high-resolution seismograph DAS24-3B has been designed and manufactured in an effort of developing China's own technology of seismic array. Since these instruments will primarily be used in field operation, there is a need to optimize the system software of data acquisition system (DAS) to enhance its stability, compatibility and maintenance. The design ideas of the system software of DAS24-3B are partly learned from the advanced DAS 72A-08. In this system there are two exclusive communication programs DNAPI-COM1 and DNAPI-LPT1, which are suitable for all standard industrial computers with ECP parallel port and serial port. By these exclusive parallel and serial communication interface the system software is split into three parts, acquisition program, user's control program and graphical display program, which can function well in separate units and can run correctly in whole. The three parts of DAS24-3B's system software possess different functions and advantages. The function of acquisition program is to control the process of seismic data acquisition. DAS24-3B system reduced its power and harddisk read-write disturbance by using the extended memory attached to its CPU, which functions as enlarging the data buffer of system and lessening the times of harddisk read-write operations. Since GPS receiver of DAS is strongly sensitive to the around environment and has the possibility of signal loss the acquisition program has been designed with the ability to automatically trail the GPS locked time. The function of user's controlling program is to configure the system's work environment, to inform the user's commands to DAS, to trail the status of DAS in real-time. The function of graphical display program is to illustrate data in figures, to convert data file into some common formatted file, to split data file in parts and combine data files into one. Both user's control program and graphical display program are API (Application Programming Interface) in window 95/98 system. Both possess the features of clearness and friendship by use of all kind of window controls, which are composed by menu, toolbar, statusbar, dialogue box, message box, edit box, scrollbar, time control, button and so on. Two programs of systemic exception handles are provided to treat the trouble in field. The DAS24-3B DAS has been designed to be easier to use-better ability, more stable and simpler. It has been tested in field and base station and has been proved more suitable for field operation of seismic array than other native instruments.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A slope failure is developed due to progressive external loads and deteriorations of slope geomaterials, thus forming a progressive and dynamic development and occurrence of landslides. Site geological properties and other active factors such as hydrodynamic load and human activities are complex and usually unknown, thus this dynamic development and occurrence of landslides can only be understood through the progressive accumulation of knowledge on the landslides. For such a progressive process, this paper proposes a dynamic comprehensive control method for landslide control. This control method takes full advantage of updated monitoring data and site investigations of landslides, and emphasizes the implementation of possible measures for landslide control at reasonable stages and in different groups. These measures are to prevent the occurrence of a landslide disaster. As a case study, a landslide project at the Panluo open-pit iron mine is analyzed to illustrate this dynamic comprehensive control method.