13 resultados para Distribution power system reconfiguration

em Chinese Academy of Sciences Institutional Repositories Grid Portal


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes an ultra-low power CMOS random number generator (RING), which is based on an oscillator-sampling architecture. The noisy oscillator consists of a dual-drain MOS transistor, a noise generator and a voltage control oscillator. The dual-drain MOS transistor can bring extra-noise to the drain current or the output voltage so that the jitter of the oscillator is much larger than the normal oscillator. The frequency division ratio of the high-frequency sampling oscillator and the noisy oscillator is small. The RNG has been fabricated in a 0.35 mu m CMOS process. It can produce good quality bit streams without any post-processing. The bit rate of this RNG could be as high as 100 kbps. It has a typical ultra-low power dissipation of 0.91 mu W. This novel circuit is a promising unit for low power system and communication applications. (c) 2007 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The national science project HIRFL-CSR has recently been officially accepted. As a cyclotron and synchotron complex, it puts some particularly high demands on the control system. There are hundreds of pieces of equipment that need to be synchronized. An integrated timing control system is built to meet these demands. The output rate and the accuracy of the controller are 16 bit/mu s. The accuracy of the time delay reaches 40 ns. The timing control system is based on a typical event distribution system, which adopts the new event generation and the distribution scheme. The scheme of the tuning control system with innovation points, the architecture and the implemented method are presented in the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

轮式移动宜人机器人项目研究的主要目的是开发自主式仿人机器人样机 ,探索先进的机器人理论和技术。轮式移动宜人机器人由正交轮式移动平台、腰部、躯干及头部和双臂组成 ,共 2 1个自由度。整体结构包括 :电源系统、机械系统、控制系统和传感系统。电源系统采用车载电池供电。机械系统包括变刚度结构 ,提高了机器人与人交互作业的安全性。控制系统分为中央协调层和执行层结构。传感系统主要实现关节位置检测、姿态检测、力检测和视觉。文章讨论了此机器人的研究进展。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

可重构制造模式是一种指导管理和控制制造系统重构过程的制造哲理 ,它使制造系统有效地响应不断变化的环境。制造系统具有可重构能力是其生存和发展的基本手段 ,具有较高可重构性的公司在风云突变的环境中将远远超过其竞争对手。本文探讨了可重构制造模式的基本定义和内涵 ,并从组织、过程、产品、加工系统和信息平台等五个方面研究了制造系统的可重构性。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

本文介绍了一个用于供电系统的DPCS,以及智能控制─实时专家系统控制在DPCS中的应用、特点和实现。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

汉字微机数据库的最大缺点是速度太慢,因此难以实用化。本文提出了一种新的汉字检索方法——标志域法,解决了这个关键问题,使查找速度提高了近十倍;再采用单层连续提问等一系列措施,还可节省相当多的存储空间,扩大了微型机的应用范围。本数据库非常适合于“最终用户”使用,即使是不懂计算机的人,也能在一、两分钟内学会使用它。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

本文将随机系统状态模型辨识技术用于电力系统负荷预报。首先根据负荷的一系列历史数据建立负荷的状态空间模型,然后用滤波算法进行次日负荷预报,最后用电网实际数据在 PDP-11/23计算机上进行预报计算,得到比较满意的结果。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

本文提出一个计算网损微增率的新途径。应用网络拓扑方法得到的网损修正值的直接数学表达式,不仅可利用系统潮流进行直接计算,而且有明确的物理概念,可用于实时经济调度。文中给出了计算方法和实例。

Relevância:

100.00% 100.00%

Publicador:

Resumo:

这台显示器是根据某电力系统计算机控制的要求而设计的.本文简要介绍了设计特点及其在电力系统中实际应用的情况.本文介绍的监控显示器适用于工业过程控制.作者根据现场应用的经验,提出了研制工业监控显示器的一些想法.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the paper through extensive study and design, the technical plan for establishing the exploration database center is made to combine imported and self developed techniques. By research and repeated experiment a modern database center has been set up with its hardware and network having advanced performance, its system well configured, its data store and management complete, and its data support being fast and direct. Through study on the theory, method and model of decision an exploration decision assistant schema is designed with one decision plan of well location decision support system being evaluated and put into action. 1. Study on the establishment of Shengli exploration database center Research is made on the hardware configuration of the database center including its workstations and all connected hardware and system. The hardware of the database center is formed by connecting workstations, microcomputer workstations, disk arrays, and those equipments used for seismic processing and interpretation. Research on the data store and management includes the analysis of the contents to be managed, data flow, data standard, data QC, data backup and restore policy, optimization of database system. A reasonable data management regulation and workflow is made and the scientific exploration data management system is created. Data load is done by working out a schedule firstly and at last 200 more projects of seismic surveys has been loaded amount to 25TB. 2. Exploration work support system and its application Seismic data processing system support has the following features, automatic extraction of seismic attributes, GIS navigation, data order, extraction of any sized data cube, pseudo huge capacity disk array, standard output exchange format etc. The prestack data can be accessed by the processing system or data can be transferred to other processing system through standard exchange format. For supporting seismic interpretation system the following features exist such as auto scan and store of interpretation result, internal data quality control etc. the interpretation system is connected directly with database center to get real time support of seismic data, formation data and well data. Comprehensive geological study support is done through intranet with the ability to query or display data graphically on the navigation system under some geological constraints. Production management support system is mainly used to collect, analyze and display production data with its core technology on the controlled data collection and creation of multiple standard forms. 3. exploration decision support system design By classification of workflow and data flow of all the exploration stages and study on decision theory and method, target of each decision step, decision model and requirement, three concept models has been formed for the Shengli exploration decision support system including the exploration distribution support system, the well location support system and production management support system. the well location decision support system has passed evaluation and been put into action. 4. Technical advance Hardware and software match with high performance for the database center. By combining parallel computer system, database server, huge capacity ATL, disk array, network and firewall together to create the first exploration database center in China with reasonable configuration, high performance and able to manage the whole data sets of exploration. Huge exploration data management technology is formed where exploration data standards and management regulations are made to guarantee data quality, safety and security. Multifunction query and support system for comprehensive exploration information support. It includes support system for geological study, seismic processing and interpretation and production management. In the system a lot of new database and computer technology have been used to provide real time information support for exploration work. Finally is the design of Shengli exploration decision support system. 5. Application and benefit Data storage has reached the amount of 25TB with thousand of users in Shengli oil field to access data to improve work efficiency multiple times. The technology has also been applied by many other units of SINOPEC. Its application of providing data to a project named Exploration achievements and Evaluation of Favorable Targets in Hekou Area shortened the data preparation period from 30 days to 2 days, enriching data abundance 15 percent and getting information support from the database center perfectly. Its application to provide former processed result for a project named Pre-stack depth migration in Guxi fracture zone reduced the amount of repeated process and shortened work period of one month and improved processing precision and quality, saving capital investment of data processing of 30 million yuan. It application by providing project database automatically in project named Geological and seismic study of southern slope zone of Dongying Sag shortened data preparation time so that researchers have more time to do research, thus to improve interpretation precision and quality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Synthetic Geology Information System (SGIS) is an important constituent part of the theory of Engineering Geomechanics Mate-Synthetic (EGMS), and is the information system more suited for the collection, storage, management, analysis and processing to the information coming from engineering geology,' geological engineering and geotechnical engineering. Its contents involve various works and methods of the investigation, design, and construction in different stages of the geological engineering. Engineering geological and three-dimensional modeling and visualization is the fundamental part of the SGIS, and is a theory, method and technique by which, adopting the computer graphics and image processing techniques, the data derived from engineering geological survey and the calculated results obtained from the geomechanical numerical simulation and analysis are converted to the graphics and images displayed on the computer screen and can be processed interactively. In this paper, the significance and realizing approaches of the three-dimensional modeling and visualization for the complex geological mass in the engineering geology are discussed and the methods of taking advantage of the interpolation and fitting for the scattered and field-surveyed data to simulate the geological layers, such as the topography and earth surface, the groundwater table and the stratum boundary, are researched into. At the mean time, in mind the characteristics of the structure of the basic data for three-dimensional modeling, its visual management can be resolved into the engineering surveyed database management module, plot parameter management module and data output module and the requirement for basic data management can be fulfilled. In the paper, the establishment and development of the three-dimensional geological information system are probed tentatively, and an instance of three-dimensional visual Engineering Distribution Information System (EDIS), theConstruction Management Information System for an airport, in which the functions, such as the real-time browse among the three-dimensional virtual-reality landscapes of the airport construction from start to finish, the information query to the airport facility and the building in the housing district and the recording and playback of the animation sets for the browse and the takeoff and landing of the planes, is developed by applying the component-mode three-dimensional virtual-reality geological information system (GIS) software development kits (SDK), so the three-dimensional visual management platform is provided for the airport construction. Moreover, in the gaper, integrated with the three-dimensional topography visualization and its application in the Sichuan-Tibet Highways, the method of the digital elevation model (DEM) data collection from the topographic maps is described, and the three-dimensional visualization and the roaming about the terrain along the highway are achieved through computer language programming. Understanding to the important role played by the varied and unique topographical condition in the gestation and germination of the highly-dense, frequently-arising and severely-endangered geological hazards can be deepened.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In an attempt to effectively integrate catalytic partial oxidation (CPO) and steam reforming (SR) reactions on the same catalyst, autothermal reforming (ATR) of n-octane was addressed based on thermodynamic analysis and carried out on a non-pyrophoric catalyst 0.3 wt.% Ru/K2O-CeO2/gamma-Al2O3. The ATR of n-octane was more efficient at the molar ratio Of O-2/C 0.35-0.45 and H2O/C 1.6-2.2 (independent parameters), respectively, and reforming temperature of 750-800 degrees C (dependent parameter). Among the sophisticated reaction network, the main reaction thread was deducted as: long-chain hydrocarbon -> CH4, short-chain hydrocarbon -> CO2, CO and H-2 formation by steam reforming, although the parallel CPO, decomposition and reverse water gas shift reaction took place on the same catalyst. Low temperature and high steam partial pressure had more positive effect on CH4 SR to produce CO2 other than CO. This was verified by the tendency of the outlet reformate to the equilibrium at different operation conditions. Furthermore, the loss of active components and the formation of stable but less active components in the catalyst in the harsh ATR atmosphere firstly make the CO inhibition capability suffer, then eventually aggravated the ATR performance, which was verified by the characterizations of X-ray fluorescence, BET specific surface areas and temperature programmed reduction. (c) 2005 Elsevier B.V. All rights reserved.