82 resultados para height of instrument
Resumo:
Theory of limit analysis include upper bound theorem and lower bound theorem. To deal with slope stability analysis by limit analysis is to approximate the real solution from upper limit and lower limit. The most used method of limit analysis is upper bound theorem, therefore it is often applied to slope engineering in many cases. Although upper bound approach of limit analysis can keep away from vague constitutive relation and complex stress analyses, it also can obtain rigorous result. Assuming the critical surface is circular slip surface, two kinematically admissible velocity fields for perpendicular slice method and radial slice method can be established according to the limit analysis of upper bound theorem. By means of virtual work rate equation and strength reduction method, the upper-bound solution of limit analysis for homogeneous soil slope can be obtained. A log-spiral rotational failure mechanism for homogeneous slope is discussed from two different conditions which represent the position of shear crack passing the toe and below the toe. In the dissertition, the author also establishes a rotational failure mechanics with combination of different logarithmic spiral arcs. Furthermore, the calculation formula of upper bound solution for inhomogeneous soil slope stability problem can be deduced based on the upper bound approach of rigid elements. Through calculating the external work rate caused by soil nail, anti-slide pile, geotechnological grid and retaining wall, the upper bound solution of safety factor of soil nail structure slope, slip resistance of anti-slide pile, critical height of reinforced soil slope and active earth pressure of retaining wall can be obtained by upper bound limit analysis method. Taking accumulated body slope as subject investigated, with study on the limit analysis method to calculate slope safety factor, the kinematically admissible velocity fields of perpendicular slice method for slope with broken slip surface is proposed. Through calculating not only the energy dissipation rate produced in the broken slip surfaces and the vertical velocity discontinuity, but also the work rate produced by self-weight and external load, the upper bound solution of slope with broken slip surface is deduced. As a case study, the slope stability of the Sanmashan landslide in the area of the Three Gorges reservoir is analyzed. Based on the theory of limit analysis, the upper bound solution for rock slope with planar failure surface is obtained. By means of virtual work-rate equation, energy dissipation caused by dislocation of thin-layer and terrane can be calculated; furthermore, the formulas of safety factor for upper bound approach of limit analysis can be deduced. In the end, a new computational model of stability analysis for anchored rock slope is presented after taking into consideration the supporting effect of rock-bolts, the action of seismic force and fissure water pressure. By using the model, not only the external woke-rate done by self-weight, seismic force, fissure water pressure and anchorage force but also the internal energy dissipation produced in the slip surface and structural planes can be totally calculated. According to the condition of virtual work rate equation in limit state, the formula of safety factor for upper bound limit analysis can be deduced.
Resumo:
It is a basic work to ascertain the parameters of rock mass for evaluation about stability of the engineering. Anisotropism、inhomogeneity and discontinuity characters of the rock mass arise from the existing of the structural plane. Subjected to water、weathering effect、off-loading, mechanical characters of the rock mass are greatly different from rock itself, Determining mechanical parameters of the rock mass becomes so difficult because of structure effect、dimension effect、rheological character, ‘Can’t give a proper parameter’ becomes one of big problems for theoretic analysis and numerical simulation. With the increment of project scale, appraising the project rock mass and ascertaining the parameters of rock mass becomes more and more important and strict. Consequently, researching the parameters of rock mass has important theoretical significance and actual meaning. The Jin-ping hydroelectric station is the first highest hyperbolic arch dam in the world under construction, the height of the dam is about 305m, it is the biggest hydroelectric station at lower reaches of Yalong river. The length of underground factory building is 204.52m, the total height of it is 68.83m, the maximum of span clearance is 28.90m. Large-scale excavation in the underground factory of Jin-ping hydroelectric station has brought many kinds of destructive phenomenon, such as relaxation、spilling, providing a precious chance for study of unloading parameter about rock mass. As we all know, Southwest is the most important hydroelectric power base in China, the construction of the hydroelectric station mostly concentrate at high mountain and gorge area, basically and importantly, we must be familiar with the physical and mechanical character of the rock mass to guarantee to exploit safely、efficiently、quickly, in other words, we must understand the strength and deformation character of the rock mass. Based on enough fieldwork of geological investigation, we study the parameter of unloading rock mass on condition that we obtain abundant information, which is not only important for the construction of Jin-ping hydroelectric station, but also for the construction of other big hydroelectric station similar with Jin-ping. This paper adopt geological analysis、test data analysis、experience analysis、theory research and Artificial Neural Networks (ANN) brainpower analysis to evaluate the mechanical parameter, the major production is as follows: (1)Through the excavation of upper 5-layer of the underground powerhouse and the statistical classification of the main joints fractures exposed, We believe that there are three sets of joints, the first group is lay fracture, the second group and the fourth group are steep fracture. These provide a strong foundation for the following calculation of and analysis; (2)According to the in-situ measurement about sound wave velocity、displacement and anchor stress, we analyses the effects of rock unloading effect,the results show a obvious time-related character and localization features of rock deformation. We determine the depth of excavation unloading of underground factory wall based on this. Determining the rock mass parameters according to the measurement about sound wave velocity with characters of low- disturbing、dynamic on the spot, the result can really reflect the original state, this chapter approximately the mechanical parameters about rock mass at each unloading area; (3)Based on Hoek-Brown experienced formula with geological strength index GSI and RMR method to evaluate the mechanical parameters of different degree weathering and unloading rock mass about underground factory, Both of evaluation result are more satisfied; (4)From the perspective of far-field stress, based on the stress field distribution ideas of two-crack at any load conditions proposed by Fazil Erdogan (1962),using the strain energy density factor criterion (S criterion) proposed by Xue changming(1972),we establish the corresponding relationship between far-field stress and crack tip stress field, derive the integrated intensity criterion formula under the conditions of pure tensile stress among two line coplanar intermittent jointed rock,and establish the corresponding intensity criterion for the exploratory attempt; (5)With artificial neural network, the paper focuses on the mechanical parameters of rock mass that we concerned about and the whole process of prediction of deformation parameters, discusses the prospect of applying in assessment about the parameters of rock mass,and rely on the catalog information of underground powerhouse of Jinping I Hydropower Station, identifying the rock mechanics parameters intellectually,discusses the sample selection, network design, values of basic parameters and error analysis comprehensively. There is a certain significance for us to set up a set of parameters evaluation system,which is in construction of large-scale hydropower among a group of marble mass.
Resumo:
In this paper, the complex faulted-block oil reservoir of Xinzhen area in Dongying depression is systematically studied from basic conditions forming faulted-block oil and gas reservoir integrating geology, seismic, logging and reservoir engineering information and computer; guided by petroleum geology, geomechanics, structural geology and geophysics and other theories. Based on analysis of background condition such as regional strata, structure and petroleum geology, structural research on geometry, kinemaitcs and dynamics, oil-controlling fault research on the seal features, sealing mechanism and sealing pattern, and research on enrichment rules and controlling factors of complex faulted-block oil reservoir are carried out to give out the formation mechanics of oil reservoir of Xinzhen complex faulted-block oil reservoir. As a result, the reservoir formation pattern is established. At the same time, through dissecting the characteristics and hydrocarbon enrichment law of complex faulted-block oil reservoir, and studying its distribution law of remaining oil after entering extra high water-cut period, a set of technologies are formed to predict complex faulted-block oil reservoir and its remaining oil distribution and to enhance oil recovery (EOR). Based on the time relationship between migration of hydrocarbon and trap formation, accumulating period of Xinzhen oil reservoir is determined. The formation of Xinzhen anticlinal trap was prior to the primary migration. This is favorable to formation of Xinzhen anticlinal hydrocarbon reservoir. Meanwhile, because anticline top caving isn't at the sane time as that of moving or faulted-trap forming inner anticline, oil and gas migrated many times and Xinzhen complex faulted-block oil reservoir formed from ES_3~(upper) to EG. Accumulating law and controlling factors of complex faulted-block reservoir are analyzed from many aspects such as regional structure background controlling hydrocarbon accumulating, plastic arch-open structure controlling oil-bearing series and reservoir types, sealing-opening of fault controlling hydrocarbon distribution and structure pattern controlling enriched trap types. Also, we established the structure pattern in Xinzhen a'ea: the arch-open of underlying strata cause expanding fracture. The main block groups developed here are shovel-like normal fault block group in the north area of Xinzhen and its associated graben block group. Block groups dominate the formation and distribution of reservoirs. We studied qualitatively and quantitatively the sealing characteristics, sealing history and sealing mechanism of faults, too. And, the sealing characteristics are evaluated and the distribution pattern of hydrocarbon controlled by faults is researched. Due to movement intensity of big faults, deep falling of downthrown block, high degree of repture and development of fracture, shallow layers close to the downthrown block of secondary faults are unfavorable to hydrocarbon accumulation. This is confirmed by the exploration practice in Xinzhen anticline. In terms of the downthrown blocks of sencondary contemporaneous faults lied in the south and north area of Xinzhen, hydrocarbon is poor close to fracture belt, while it is relatively abundant in tertiary companion faults. Because of long-term movement of faults that control hydrocarbon, fi'om ES3 to EG, six set of oil-bearing series formed. And their opening causes the inhomogeneity in hydrocarbon abundance among each block--in two flanks of anticline reservoirs are abundant while in the axial area, oil and gas are sporadic. There the sealing characteristics control oil-bearing area of oil/gas accumulation and the height of oil reservoir. Longitudinally, oil and gas are enriched in dip-flat areas in mid-plane of faults. It is established that there are four types of accumulating patterns in complex faulted-block oil reservoirs in Xinzhen. The first is accumulating pattern of lithologic oil reservoirs in E~S_3~(mid-lowwer), that is, self-generating-self-reserving-self-covering lithologic trap pattern. The second is drag-anticline accumulating pattern in Xinzhen. The structure traps are drag anticlines formed by the contemporaneous faults of the second basement in the north of Xinzhen, and the multiple source rocks involve Ek_2, Es_4, Es_3 and Es_1 members. The reservoirs are fluvial-delta sandstones of the upper member of Shahejie formation and Guantao formation, covered by regional thick mudstone of the upper member of Guantao formation and MingHuazhen formation. The third is the accumulating pattern of reverse listric fault, the third-degree fault of Xinzhen anticline limb and the reservoirs form reservoir screened by reverse listric faults. The forth is accumulating pattern of crossing faults which form closing or semi-closing faulted-blocks that accumulate hydrocarbon. The technologies of predicting remaining oil in complex faulted-block reservoir during the mid and late development stage is formed. Remaining oil in simple large faulted-blocks enriches in structural high, structural middle, structural low of thick bottom water reservoirs, points near bent edge-fault oftertiary faults and part the fourth ones with big falling displacement, microstructure high place of oil-sandbodies and areas where local well pattern isn't perfect. While that in small complex faulted-blocks enriches near small nose, small high point, angle of small faults, small oil-bearing faulted-blocks without well and areas with non-perfect well pattern. The technologies of enhancing recovery factor in complex faulted-block reservoir during the mid and late development stage is formed as follows: fine reservoir description, drilling adjust wells, designing directional wells, sub-dividing layer series of development, improving flooding pattern, changing water-injection direction and enhancing swept volume, cyclic waterflooding and gas-injection, etc. Here, directional wells include directional deflecting wells, lateral-drilling wells, lateral-drilling horizontal wells and horizontal wells. The results of this paper have been used in exploration and development of Shengli oilfield, and have achieved great social and economic profit, especially in predicting distribution of complex faulted-block reservoir, remaining oil distribution during middle and late stage of development, and in EOR. Applying the achievement of fault-closure research, new hydrocarbon-bearing blocks are discovered in flanks of Dongying central uplift and in complex blocks with proved reserves 15 million tons. With the study of remaining oil distribution law in complex faulted-block reservoirs, recovery factors are increased greatly in Dongxin, Xianhe and Linpan complex faulted-block reservoirs and accumulated oil production increment is 3 million tons.
Resumo:
In the engineering reinforcement of-rock and soil mass, engineers must consider how to obtain better reinforcing effect at the cost of less reinforcing expense, which, in fact, is the aim of reinforcement design. In order to accomplish the purpose, they require not only researching the material used to reinforce and its structure, but also taking into account of several important geological factors, such as the structure and property of rock and soil mass. How to improve the reinforcing effect according to engineering geomechanical principle at the respect of the reinforcement of engineering soil and rock mass is studied and discussed in this paper. The author studies the theory, technology and practice of geotechnical reinforcement based on engineering geomechanics, taking example for the soil treatment of Zhengzhou Airport, the effect analysis of reinforcement to the slope on the left bank of Wuqiangxi Hydropower Station and the reinforcing design of the No. 102 Landslide and unique sand-slide slope on the Sichuan-Tibet Highway. The paper is comprised of two parts for the convenience of discussion. In the first part, from the first chapter to the fifth chapter, trying to perform the relevant research and application at the viewpoint of soil mass engineering geomechanics, the author mainly discusses the study of reinforcing soft ground soil through dynamical consolidation and its application. Then, in the second part, from the sixth chapter to the eleventh chapter, the study of new technologies in the rock slope reinforcement and their application are discussed. The author finds that not only better reinforcing effect can be gained in the research where the principle and method of rock mass engineering geomechanics is adopted, but also new reinforcing technologies can be put forward. Zhengzhou Airport is an important one in central plains. It lies on Yellow River alluvial deposit and the structure of stratum is complex and heterogeneous. The area of airport is very large, which can result in differential settlement easily, damage of airport and aircraft accident, whereas, there are no similar experiences to dispose the foundation, so the foundation treatment become a principal problem. During the process of treatment, the method of dynamic compaction was adopted after compared with other methods using the theory of synthetic integration. Dynamic compaction is an important method to consolidate foundation, which was successfully used in the foundation of Zhengzhou Airport. For fill foundation, controlling the thickness of fill so as to make the foundation treatment can reach the design demand and optimum thickness of the fill is a difficult problem. Considering this problem, the author proposed a calculation method to evaluate the thickness of fill. The method can consider not only the self-settlement of fill but also the settlement of the ground surface under applied load so as to ensure the settlement occurred during the using period can satisfy the design demand. It is proved that the method is correct after using it to choose reasonable energy of dynamic compaction to treat foundation. At the same time, in order to examine the effect of dynamic compaction, many monitor methods were adopted in the test such as static loading test, modulus of resilience test, deep pore pressure -test, static cone penetration test and the variation of the pore volume measurement. Through the tests, the author summarized the discipline of the accumulation and dissipation of pore pressure in Yellow River alluvial deposit under the action of dynamic compaction, gave a correct division of the property change of silt and clay under dynamic compaction, determined the bearing capacity of foundation after treatment and weighted the reinforcing effect of dynamic consolidation from the variation of the soil particle in microcosmic and the parameter of soil mass' density. It can be considered that the compactness of soil is in proportion to the energy of dynamic compaction. This conclusion provided a reference to the research of the "Problem of Soil Structure-the Central Problem of Soil Mechanics in 21 Century ". It is also important to strengthen rock mass for water conservancy and electric power engineering. Slip-resistance pile and anchoring adit full of reinforced concrete are usually adopted in engineering experience to strengthen rock mass and very important for engineering. But there also some deficiency such as the weakest section can't be highlighted, the monitor is inconvenient and the diameter of pile and adit is very large etc. The author and his supervisor professor Yangzhifa invented prestressed slip-resistance pile and prestressed anchoring adit full of reinforced concrete, utilizing the advantage that the prestressed structure has better anti-tensile characteristic (this invention is to be published). These inventions overcome the disadvantages of general slip-resistance pile and anchoring adit full of reinforced concrete and have the functions of engineering prospecting, strengthening, drainage and monitor simultaneous, so they have better strengthened effect and be more convenient for monitor and more economical than traditional methods. Drainage is an important factor in treatments of rock mass and slop. In view of the traditional drainage method that drainage pore often be clogged so as to resulted in incident, professor Yangzhifa invented the method and setting of guide penetration by fiber bundle. It would take good effect to use it in prestressed slip-resistance pile and anchoring adit full of reinforced concrete. In this paper, the author took example for anchoring adit full of reinforced concrete used to strengthen Wuqiangxi left bank to simulate the strengthened effect after consolidated by prestressed slip-resistance pile, took example for 102 landslide occurred along Sichuan-Tibet highway to simulate the application of slip-resistance pile and the new technology of drainage. At the same time the author proposed the treatment method of flowing sand in Sichuan-Tibet highway, which will benefit the study on strengthening similar engineering. There are five novelties in the paper with the author's theoretical study and engineering practice: 1. Summarizing the role of pore water pressure accumulation and dissipation of the Yellow River alluvial and diluvial soil under the action of dynamical consolidation, which has instructive significance in the engineering construction under the analogical engineering geological conditions in the future. It has not been researched by the predecessors. 2. Putting forward the concept of density D in microcosmic based on the microcosmical structure study of the soil sample. Adopting D to weight the reinforcing effect of dynamic consolidation is considered to be appropriate by the means of comparing the D values of Zhengzhou Airport's ground soil before with after dynamically consolidating reinforcement, so a more convenient balancing method can be provided for engineering practice. 3. According to the deep research into the soil mass engineering geology, engineering rock and soil science, soil mechanics, as well as considerable field experiments, improving the consolidating method in airport construction, from the conventional method, which is dynamically compactmg original ground surface firstly, then filling soil and dynamically layer-consolidating or layer-compacting at last to the upgraded method, which is performing dynamical consolidation after filling soil to place totally at the extent of the certain earth-filling depth. The result of the dynamical consolidation not only complies with the specifications, but also reduces the soil treatment investment by 10 million RMB. 4. Proposing the method for calculating the height of the filled soil by the means of estimating the potential displacement produced in the original ground surface and the filled earth soil under the possible load, selecting the appropriate dynamically-compacting power and determining the virtual height of the filled earth soil. The method is proved to be effective and scientific. 5. According to the thought of Engineering Geomechanics Metal-Synthetic Methodology (EGMS), patenting two inventions (to the stage of roclamation, with Professor Yang Zhi-fa, the cooperative tutor, and etc.) in which multi-functions, engineering geological investigation, reinforcement, drainage and strength remedy, are integrated all over in one body at the viewpoint of the breakage mechanism of the rock slope.
Resumo:
Gas condensate reservoir research involves not only structure sediment reservoir liquid properties characterization but also the change of the temperature field, the change of the pressure field, the change of liquid phase and the reservoir sensitivity. To develop the gas condensate reservoir effectively .we must depict the static properties of the oil and gas system ,build exact and comprehensive parameter field, predict the rule of dynamic change and do the necessary reservoir characterization development plan dynamic prediction direct production. The MoBei Oil and Gas Field is the first gas condensate reservoirs which is found by the Xinjiang Oil Field Company in ZhunGaEr basin belly.it has deserved some knowledge after prospect evaluation, the MoBei Oil and Gas Field start development ,it is one of the important development blocks of Xinjiang Oil Field Company productivity constuction. During its development , it gradually appears some problems, such as complex oil and gas phase, great change of reservoir stretch .uncertain reservoir type and scale, controling its development strategy and plan difficultly. To deserve the high efficient development and long-term stable production of the gas condensate reservoir, it is necessary to characterize it systematically and form a suit of scientific development strategy. This thesis take the MoBei zone SanGongHe sand group reservoir as research object, applied advanced log techniques ,such as the nulear magnetism log ,MDT testing .etc. After comprehensive research of loging geology information, set up a suit of methods to identify oil gas water layer .these methods can identify the gas-oil level and the oil-water level. On the basis of reasonable development object system, according fine structure interpretation and structure modeling. build any oil water column height of the reservoir accurately. Through carefully analysis of the basic theory and method of reservoir seism prediction. optimize a reservoir inversion method .technique. software fitting the research region aiming strata, set up the GR field, porosity field, Rt field, impedence field .permeability field and initial oil saturation field, generating the base of quantity reservoir characterization. Discussing the characteristic of reservoir fluid and the movement and reallocating of muti-phase fluid in reservoir. And according the material of 100 soviet gas condensate reservoir ,build the recognition method and mode of gas condensate reservoir. Building the 3D geology model ,carry on the static and production evaluation, propose the development strategy and improve plan , provide the base of increasing reserves and advancing production and enriching the prospect development theory of the gas condensate reservoi
Resumo:
The protein binding constant, binding sites of the Strychnos alkaloid-strychnine and bovine serum albumin (BSA) was determined by capillary electrophoretic frontal analysis (CE-FA) for the first time. The experiment was carried out in a polyacrylamide-coated fused silica capillary (48.4 cmx50 mu m i.d., 38.1 cm effective length) with 20 mmol/L citrate/MES buffer (pH 6.0, ionic strength 0.17). The applied voltage was 12 kV and detection wavelength was set at 257 nm. The plateau height of the peak was employed to determine the unbound concentration of drug in BSA equilibrated sample solution based on the external drug standard in the absence of protein. The present method provides a convenient, accurate technique for the early stage of drug screening.
Resumo:
A new mesoporous sphere-like SBA-15 silica was synthesized and evaluated in terms of its suitability as stationary phases for CEC. The unique and attractive properties of the silica particle are its submicrometer particle size of 400 nm and highly ordered cylindrical mesopores with uniform pore size of 12 nm running along the same direction. The bare silica particles with submicrometer size have been successfully employed for the normal-phase electrochromatographic separation of polar compounds with high efficiency (e.g., 210 000 for thiourea), which is matched well with its submicrometer particle size. The Van Deemeter plot showed the hindrance to mass transfer because of the existence of pore structure. The lowest plate height of 2.0 mu m was obtained at the linear velocity of 1.1 mm/s. On the other hand, because of the relatively high linear velocity (e.g., 4.0 mm/s) can be generated, high-speed separation of neutral compounds, anilines, and basic pharmaceuticals in CEC with C-18-modified SBA-15 silica as stationary phases was achieved within 36, 60, and 34 s, respectively.