67 resultados para Pile sort


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Theory of limit analysis include upper bound theorem and lower bound theorem. To deal with slope stability analysis by limit analysis is to approximate the real solution from upper limit and lower limit. The most used method of limit analysis is upper bound theorem, therefore it is often applied to slope engineering in many cases. Although upper bound approach of limit analysis can keep away from vague constitutive relation and complex stress analyses, it also can obtain rigorous result. Assuming the critical surface is circular slip surface, two kinematically admissible velocity fields for perpendicular slice method and radial slice method can be established according to the limit analysis of upper bound theorem. By means of virtual work rate equation and strength reduction method, the upper-bound solution of limit analysis for homogeneous soil slope can be obtained. A log-spiral rotational failure mechanism for homogeneous slope is discussed from two different conditions which represent the position of shear crack passing the toe and below the toe. In the dissertition, the author also establishes a rotational failure mechanics with combination of different logarithmic spiral arcs. Furthermore, the calculation formula of upper bound solution for inhomogeneous soil slope stability problem can be deduced based on the upper bound approach of rigid elements. Through calculating the external work rate caused by soil nail, anti-slide pile, geotechnological grid and retaining wall, the upper bound solution of safety factor of soil nail structure slope, slip resistance of anti-slide pile, critical height of reinforced soil slope and active earth pressure of retaining wall can be obtained by upper bound limit analysis method. Taking accumulated body slope as subject investigated, with study on the limit analysis method to calculate slope safety factor, the kinematically admissible velocity fields of perpendicular slice method for slope with broken slip surface is proposed. Through calculating not only the energy dissipation rate produced in the broken slip surfaces and the vertical velocity discontinuity, but also the work rate produced by self-weight and external load, the upper bound solution of slope with broken slip surface is deduced. As a case study, the slope stability of the Sanmashan landslide in the area of the Three Gorges reservoir is analyzed. Based on the theory of limit analysis, the upper bound solution for rock slope with planar failure surface is obtained. By means of virtual work-rate equation, energy dissipation caused by dislocation of thin-layer and terrane can be calculated; furthermore, the formulas of safety factor for upper bound approach of limit analysis can be deduced. In the end, a new computational model of stability analysis for anchored rock slope is presented after taking into consideration the supporting effect of rock-bolts, the action of seismic force and fissure water pressure. By using the model, not only the external woke-rate done by self-weight, seismic force, fissure water pressure and anchorage force but also the internal energy dissipation produced in the slip surface and structural planes can be totally calculated. According to the condition of virtual work rate equation in limit state, the formula of safety factor for upper bound limit analysis can be deduced.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The large ancient underground rock caverns in Longyou is an important component of grotto cultural. Current task facing the long-term preservation of these unmovable cultural relics is arduous and challenging. The deformation failure of the caverns' surrounding rock is deteriorating. The weathering velocity of these caverns is accelerating. With the strength of caverns' surrounding rock worsening, critical rocks were generated in local regions of the caverns' vault and posing a threat to the security of people passing by. Selection of a maximum-security route and construction a aisle in the caverns might be an efficient way to ensure the security of tourists and reach the target of long-term preservation. The deformation and destruction of the ancient underground caverns is primarily dominated by geological conditions and the special structure of caverns. Based on field investigation, several fundamental conditions for deformation and failure are recognized, and nine deformation and fracture patterns of the Longyou grotto are proposed. In order to judge the stability of caverns’ surrounding rock, the element safety coefficient method is presented. An explicit explanation for the meaning of the method is deduced using Mohr-Coulomb strength criterion. Numerical analyses are carried out in the dissertation through FLAC3D code. Through numerical analysis, the stress distribution regularities of the caverns’ roofs, piles and public side wall are analysed, and the stability properties of caverns’ surrounding rock are also assessed. At the same time, the element safety coefficient method is introduced to contrast the stability degree of different regions in caverns. The above analyses are bases for choosing the optimal tourism routes in the caverns of Longyou grotto. The impact of surface load on the stability of shallow buried cavities in Longyou grotto is evaluated, the results show that building load has significant influence on the stability of the No.1 cavern’s roof, pile and public side wall between the No.1 cavern and the No.2 cavern, pedestrian load has less impact on the stability of surrounding rock than building load. The principles for choosing the optimal tourism routes in the caverns are discussed. With these principles, the dissertation makes a systematic research on the geological analytic method, numerical analytic method and meeting tourism requirements method, which are used in selecting the optimal tourism routes in the caverns. In order to achieve the best effect in the process of tourism routes selection, the above three method are integrated through Theory of Engineering Geomechanics Meta-system(EGMS). According to field investigations, numerical analyses, tourism requirements and expert experiences, the optimal tourism routes through No.1 to No.5 cavern are determined preliminarily. The obtained results from the research work are useful for the security aisle's construction, they also have reference value to other projects in practice.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Soil nailing is a sort of new support system developed in recent year, and it has already been extensive application in the supporting system of deep-foundation pit . Based on the in situ measured data of hairun mansion deep-foundation pit excavation in Beijing, which include steel bar stress and lateral deformation, the following categories are systematically studied: (1) Magnitude of lateral deformation and displacement distribution vary with time at different excavation depth of deep-foundation pit excavation. Magnitude and distribution of soil nailing force vary with time at different excavation depth of deep-foundation pit excavation. By contract with the in situ measured data, we process the three-dimension numerical simulation of deep-foundation pit excavation with soil nailing support by Fast Lagrangian Analysis of Continua 3D(FLAC~(3D)). By above in situ measurement and studying, we found that the mechanism of soil nailing support is: by stress sharing, stress transmission and diffusion, and displacement restriction, composite soil nailing system can improve the strength and rigidity of soil and decrease the deformation and failure state by enhancing the whole stability of slope.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the engineering reinforcement of-rock and soil mass, engineers must consider how to obtain better reinforcing effect at the cost of less reinforcing expense, which, in fact, is the aim of reinforcement design. In order to accomplish the purpose, they require not only researching the material used to reinforce and its structure, but also taking into account of several important geological factors, such as the structure and property of rock and soil mass. How to improve the reinforcing effect according to engineering geomechanical principle at the respect of the reinforcement of engineering soil and rock mass is studied and discussed in this paper. The author studies the theory, technology and practice of geotechnical reinforcement based on engineering geomechanics, taking example for the soil treatment of Zhengzhou Airport, the effect analysis of reinforcement to the slope on the left bank of Wuqiangxi Hydropower Station and the reinforcing design of the No. 102 Landslide and unique sand-slide slope on the Sichuan-Tibet Highway. The paper is comprised of two parts for the convenience of discussion. In the first part, from the first chapter to the fifth chapter, trying to perform the relevant research and application at the viewpoint of soil mass engineering geomechanics, the author mainly discusses the study of reinforcing soft ground soil through dynamical consolidation and its application. Then, in the second part, from the sixth chapter to the eleventh chapter, the study of new technologies in the rock slope reinforcement and their application are discussed. The author finds that not only better reinforcing effect can be gained in the research where the principle and method of rock mass engineering geomechanics is adopted, but also new reinforcing technologies can be put forward. Zhengzhou Airport is an important one in central plains. It lies on Yellow River alluvial deposit and the structure of stratum is complex and heterogeneous. The area of airport is very large, which can result in differential settlement easily, damage of airport and aircraft accident, whereas, there are no similar experiences to dispose the foundation, so the foundation treatment become a principal problem. During the process of treatment, the method of dynamic compaction was adopted after compared with other methods using the theory of synthetic integration. Dynamic compaction is an important method to consolidate foundation, which was successfully used in the foundation of Zhengzhou Airport. For fill foundation, controlling the thickness of fill so as to make the foundation treatment can reach the design demand and optimum thickness of the fill is a difficult problem. Considering this problem, the author proposed a calculation method to evaluate the thickness of fill. The method can consider not only the self-settlement of fill but also the settlement of the ground surface under applied load so as to ensure the settlement occurred during the using period can satisfy the design demand. It is proved that the method is correct after using it to choose reasonable energy of dynamic compaction to treat foundation. At the same time, in order to examine the effect of dynamic compaction, many monitor methods were adopted in the test such as static loading test, modulus of resilience test, deep pore pressure -test, static cone penetration test and the variation of the pore volume measurement. Through the tests, the author summarized the discipline of the accumulation and dissipation of pore pressure in Yellow River alluvial deposit under the action of dynamic compaction, gave a correct division of the property change of silt and clay under dynamic compaction, determined the bearing capacity of foundation after treatment and weighted the reinforcing effect of dynamic consolidation from the variation of the soil particle in microcosmic and the parameter of soil mass' density. It can be considered that the compactness of soil is in proportion to the energy of dynamic compaction. This conclusion provided a reference to the research of the "Problem of Soil Structure-the Central Problem of Soil Mechanics in 21 Century ". It is also important to strengthen rock mass for water conservancy and electric power engineering. Slip-resistance pile and anchoring adit full of reinforced concrete are usually adopted in engineering experience to strengthen rock mass and very important for engineering. But there also some deficiency such as the weakest section can't be highlighted, the monitor is inconvenient and the diameter of pile and adit is very large etc. The author and his supervisor professor Yangzhifa invented prestressed slip-resistance pile and prestressed anchoring adit full of reinforced concrete, utilizing the advantage that the prestressed structure has better anti-tensile characteristic (this invention is to be published). These inventions overcome the disadvantages of general slip-resistance pile and anchoring adit full of reinforced concrete and have the functions of engineering prospecting, strengthening, drainage and monitor simultaneous, so they have better strengthened effect and be more convenient for monitor and more economical than traditional methods. Drainage is an important factor in treatments of rock mass and slop. In view of the traditional drainage method that drainage pore often be clogged so as to resulted in incident, professor Yangzhifa invented the method and setting of guide penetration by fiber bundle. It would take good effect to use it in prestressed slip-resistance pile and anchoring adit full of reinforced concrete. In this paper, the author took example for anchoring adit full of reinforced concrete used to strengthen Wuqiangxi left bank to simulate the strengthened effect after consolidated by prestressed slip-resistance pile, took example for 102 landslide occurred along Sichuan-Tibet highway to simulate the application of slip-resistance pile and the new technology of drainage. At the same time the author proposed the treatment method of flowing sand in Sichuan-Tibet highway, which will benefit the study on strengthening similar engineering. There are five novelties in the paper with the author's theoretical study and engineering practice: 1. Summarizing the role of pore water pressure accumulation and dissipation of the Yellow River alluvial and diluvial soil under the action of dynamical consolidation, which has instructive significance in the engineering construction under the analogical engineering geological conditions in the future. It has not been researched by the predecessors. 2. Putting forward the concept of density D in microcosmic based on the microcosmical structure study of the soil sample. Adopting D to weight the reinforcing effect of dynamic consolidation is considered to be appropriate by the means of comparing the D values of Zhengzhou Airport's ground soil before with after dynamically consolidating reinforcement, so a more convenient balancing method can be provided for engineering practice. 3. According to the deep research into the soil mass engineering geology, engineering rock and soil science, soil mechanics, as well as considerable field experiments, improving the consolidating method in airport construction, from the conventional method, which is dynamically compactmg original ground surface firstly, then filling soil and dynamically layer-consolidating or layer-compacting at last to the upgraded method, which is performing dynamical consolidation after filling soil to place totally at the extent of the certain earth-filling depth. The result of the dynamical consolidation not only complies with the specifications, but also reduces the soil treatment investment by 10 million RMB. 4. Proposing the method for calculating the height of the filled soil by the means of estimating the potential displacement produced in the original ground surface and the filled earth soil under the possible load, selecting the appropriate dynamically-compacting power and determining the virtual height of the filled earth soil. The method is proved to be effective and scientific. 5. According to the thought of Engineering Geomechanics Metal-Synthetic Methodology (EGMS), patenting two inventions (to the stage of roclamation, with Professor Yang Zhi-fa, the cooperative tutor, and etc.) in which multi-functions, engineering geological investigation, reinforcement, drainage and strength remedy, are integrated all over in one body at the viewpoint of the breakage mechanism of the rock slope.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With the continually increase both in the amount of wastewater disposal and in the treatment rate, more and more sewage sludge has been produced. An economic estimate was taken on the different sewage sludge disposal and treatment technologies, and led to the conclusion that compost is an effective way to make sewage sludge harmless, stable and resourceable. Normally, there are several ways to treat sewage sludge, such as landfill, compost, incineration and so on. These technologies will cost 300-1000 Y per ton of sludge. Among those ways, landfill is the cheapest one and operates easily, however, it just postpones the pollution instead of eventually eliminating the pollution; The amount of the sludge will reduce dramatically after incineration, while incineration will take a very high investment in the beginning, at the same time, it's very hard to maintain running; Sewage sludge will be resourceful after composting treantment, thus makes up the treatment cost, makes composting is the most economical way. Compost production is safe when correctly used, compost is a important way to treat sewage sludge. Oxygen is an important control factor in aerobic composting that has great effects on temperature and microorganisms. The gas gathering and transfering system of an online oxygen monitoring system for composting were bettermented to prolong the monitoring system's running period. The oxygen concentration changes in various aerobic composting stage were studied, and conclusions came to that oxygen concentration changes much faster in the oxygen concentration increasing stage than that in the declining stage; the better the aerobic condition is, the sooner the monitoring system starts to work. The minimal oxygen concentration during a ventilation cycle often falls at the beginning, then ascends in the composting period; at the same time, oxygen concentration changes fast in the early composting stage(temperature increasing stage), much slower in the middle stage(continouns thermophilic stage),and seldom changes in the late composting stage(temperature declining stage). With the help of the oxygen realtime-online monitoring system, oxygen concentrations was measured. During the composting period, water contents was analyzed after sampled. It's found that water contents (WC) and Oxygen concentration can both influence the composting process, and the control rule varies in the various composting stages. Essentially, the rule that water and oxygen control the composting process comes from water counterchecks the oxygen transferring to the composting substrate. The most influential factor to the WC and to the oxygen is the components in the composting pile. In the temperature increasing stage, seldom microorganisms exist in the composting pile with low activity, thus oxygen can meet with microorganisms' need, and WC is the dominant factor. In the high temperature (continouns thermophilic) stage, composting process is controlled by WC and oxygen, essentially by WC, at the same time, their influence somehow is not remarkable. In the temperature declining stage, WC and oxygen influence the composting process little. It's also found that the composting process will differ even if under the same components, thus to equably mix the components can avoid WC focusing in some place and let the composting pile to be aerobic. In one sentence, aerobic state is the most important factor in the composting process, suitable bulking material will be useful to the composting control.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In order to realize fast development of the national economy in a healthy way and coordinate progress with whole society, the country has implemented the strategy of development of the western region. An important action of finishing this strategic task is to accelerate the highway construction in the western region, join the western region and places along the coast, the river, the border with goods and materials, technology, and personnel interchanges, and then drive development of the local economy.The western region was influenced by the Himalaya Tectonization in Cenozoic, and the crust rose and became the plateau. In the course of rising, rivers cut down sharply to form a lot of high mountains and gorges.Because of topography and geomorphology, bridges in the traffic construction in the alpine gorge area are needed. Rivers have characteristics of large flow, fast velocity and high and steep river valley, so building a pier in the river is not only very difficult, but also making the cost increase. At the same time, the impact that the pier is corroded and the bridge base that is drawn to be empty by flow are apt to cause destruction of the pier. For those reasons, suspending bridge and cable-stay bridge are usually adopted with the single and large span. For the large span bridge, the pier foundation could receive ten thousand and more vertical strength, bending moment and near kiloton horizontal thrust.Because bank slope in the alpine gorge district is cut deeply and unsettled big, natural stability is worse under endogenic and exogenic force. When bank slope bears heavy vertical strength, bending moment and horizontal thrust facing the river, it will inevitably make the balance state of rock and soil mass change, bridge bank slope deform, and even destroyed. So the key problem at the time of the large span's bridge construction in the alpine gorge area is how to make it stable.So based on the spot investigation, the Engineering Geology Analysis Method is very important to grasp the bank slope stability. It can provide the bank slope stability macroscopic ally and qualitatively, and reference to the indoor calculation. The Engineering Geology Analysis Method is that by way of analyzing and investigating terms of bank slope instability, stability development trend, the ancient rock slide and devolution in the site, stability comprehensive evaluation primarily, current and future stability of bank slope is gotten, realizing the intention to serving the concrete engineering.After the Engineering Geology Analysis Method is applied to project instances of BeiPan River Bridge and BaLin River Bridge, results are accord with bank slope actual conditions, which proves sites are suited to building bridges from site stability.we often meet bank slope stability issues in the traffic construction in the alpine gorge areao Before the evaluation of the bank slope stability, the engineering geological condition is investigated first. After that, the next exploration target and geology measures are decided. So, the Engineering Geology Analysis Method that the investigation of the engineering geological condition is the main content is quite important in practice. The other evaluations of the bank slope stability are based on it. Because foundation receives very heavy load, for the big span's bridge in the alpine gorge area, a long pile of the large diameter (D^0.8m) is usually selected. In order to reflect rock mass's deformation properties under rock-socketed pile function, the author has used the FLAG30 software for rock and soil mass and done many numerical simulations. By them, the author launches the further investigation on deformation properties of bank slope under different slope angle, pile length, diameter, elastic modulus, load, bank slope's structure, etc. Some conclusion meaningful to the design and produce are obtained.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Three experiments were conducted in the attempt to understand the development of hierarchical classification. The 3-and 4-year-olds as well as hindergartners were given matching or object sorting tasks with either basic-level or superordinate relations. The results indicated: 1. Even 3-year-olds can consistently sort at the basic level. However, children perform poorly at the superordinate level, and there are developmental differences in the ability to sort at this level. 2. The perceptual similarity of stimulus materials, various competing organizations and the different ways of dealing with superordinate categories, depending on whether the categories are explicitly or implicitly represented for the child, are all factors appear to contribute to children's hierarchical classification.