50 resultados para tip clearance


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The J-integral is applied to characterize the fracture initiation of phenolphthalein polyether ketone (PEK-C) for which the concepts of linear elastic fracture mechanics (LEFM) are inapplicable at high temperatures for reasonably-sized specimens due to ex

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We report new geophysical and petrological data collected at the southern tip of the Parece Vela Basin in the Philippine Sea. The Parece Vela Basin, which was formed as a backarc basin behind proto Mariana arc-trench system from late Oligocene to middle Miocene, provides us a good opportunity to study the nature of successive backarc basin formations in the Philippine Sea and the relationship between are and backarc magmatisms. Regional bathymetric map derived from satellite altimetry shows that the southern tip of the basin, now located just west of the Yap arc-trench system, has unique morphological and tectonic features which include: 1) the absence of spreading center or its trace, 2) shallow average depth, and 3) enigmatic curved structures. Our newly collected high-resolution bathymetric data reveal that the spreading fabric similar to the central Parece Vela Basin exists to the north of 9 degrees 20'N. Thus it appears that the present-day Yap arc and backarc region represent the western half of the seafloor that was produced by the early E-W and the following NE-SW spreading in the northern and central Parece Vela Basin, and that the eastern counterpart now lies west of the West Mariana Ridge. Unlike the northern Parece Vela Basin, there appears to be no evidence for a systematic propagation of spreading center in the southern part. Instead two rift segments, one which extends from the central Parece Vela Basin and the other which lies within the western remnant arc (Kyushu-Palau Ridge), overlap at the southern tip of the basin, producing a complex seafloor that includes curvilinear deeps and deformed topographic highs. (c) 2007 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The growth and survival of the Zhikong scallop Chlamys farreri suspended in deep water of Haizhou Bay were studied from July 2007 to June 2008, and the biodeposition method was used to estimate the clearance rate of C. farreri under field conditions. Results showed that the scallop grew fast during all the culture time, with the exception of summer. The condition index of the scallop increased with time and reached the highest value in spring of the second year. The survival of scallops was 60.8 +/- A 3.9% at the end of this study, mortality occurring mainly during the summer and autumn of the first year. The clearance rate fluctuated obviously with season,with the highest value in September 2007, and the lowest value in March 2008. Factors accounting for variations in growth and clearance rate of scallops are also discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It is a basic work to ascertain the parameters of rock mass for evaluation about stability of the engineering. Anisotropism、inhomogeneity and discontinuity characters of the rock mass arise from the existing of the structural plane. Subjected to water、weathering effect、off-loading, mechanical characters of the rock mass are greatly different from rock itself, Determining mechanical parameters of the rock mass becomes so difficult because of structure effect、dimension effect、rheological character, ‘Can’t give a proper parameter’ becomes one of big problems for theoretic analysis and numerical simulation. With the increment of project scale, appraising the project rock mass and ascertaining the parameters of rock mass becomes more and more important and strict. Consequently, researching the parameters of rock mass has important theoretical significance and actual meaning. The Jin-ping hydroelectric station is the first highest hyperbolic arch dam in the world under construction, the height of the dam is about 305m, it is the biggest hydroelectric station at lower reaches of Yalong river. The length of underground factory building is 204.52m, the total height of it is 68.83m, the maximum of span clearance is 28.90m. Large-scale excavation in the underground factory of Jin-ping hydroelectric station has brought many kinds of destructive phenomenon, such as relaxation、spilling, providing a precious chance for study of unloading parameter about rock mass. As we all know, Southwest is the most important hydroelectric power base in China, the construction of the hydroelectric station mostly concentrate at high mountain and gorge area, basically and importantly, we must be familiar with the physical and mechanical character of the rock mass to guarantee to exploit safely、efficiently、quickly, in other words, we must understand the strength and deformation character of the rock mass. Based on enough fieldwork of geological investigation, we study the parameter of unloading rock mass on condition that we obtain abundant information, which is not only important for the construction of Jin-ping hydroelectric station, but also for the construction of other big hydroelectric station similar with Jin-ping. This paper adopt geological analysis、test data analysis、experience analysis、theory research and Artificial Neural Networks (ANN) brainpower analysis to evaluate the mechanical parameter, the major production is as follows: (1)Through the excavation of upper 5-layer of the underground powerhouse and the statistical classification of the main joints fractures exposed, We believe that there are three sets of joints, the first group is lay fracture, the second group and the fourth group are steep fracture. These provide a strong foundation for the following calculation of and analysis; (2)According to the in-situ measurement about sound wave velocity、displacement and anchor stress, we analyses the effects of rock unloading effect,the results show a obvious time-related character and localization features of rock deformation. We determine the depth of excavation unloading of underground factory wall based on this. Determining the rock mass parameters according to the measurement about sound wave velocity with characters of low- disturbing、dynamic on the spot, the result can really reflect the original state, this chapter approximately the mechanical parameters about rock mass at each unloading area; (3)Based on Hoek-Brown experienced formula with geological strength index GSI and RMR method to evaluate the mechanical parameters of different degree weathering and unloading rock mass about underground factory, Both of evaluation result are more satisfied; (4)From the perspective of far-field stress, based on the stress field distribution ideas of two-crack at any load conditions proposed by Fazil Erdogan (1962),using the strain energy density factor criterion (S criterion) proposed by Xue changming(1972),we establish the corresponding relationship between far-field stress and crack tip stress field, derive the integrated intensity criterion formula under the conditions of pure tensile stress among two line coplanar intermittent jointed rock,and establish the corresponding intensity criterion for the exploratory attempt; (5)With artificial neural network, the paper focuses on the mechanical parameters of rock mass that we concerned about and the whole process of prediction of deformation parameters, discusses the prospect of applying in assessment about the parameters of rock mass,and rely on the catalog information of underground powerhouse of Jinping I Hydropower Station, identifying the rock mechanics parameters intellectually,discusses the sample selection, network design, values of basic parameters and error analysis comprehensively. There is a certain significance for us to set up a set of parameters evaluation system,which is in construction of large-scale hydropower among a group of marble mass.