79 resultados para Dam Failure
Resumo:
This study has developed an improved subjective approach of classification in conjunction with Step wise DFA analysis to discriminate Chinese sturgeon signals from other targets. The results showed that all together 25 Chinese sturgeon echo-signals were detected in the spawning ground of Gezhouba Dam during the last 3 years, and the identification accuracy reached 90.9%. In Stepwise DFA, 24 out of 67 variables were applied in discrimination and identification. PCA combined with DFA was then used to ensure the significance of the 24 variables and detailed the identification pattern. The results indicated that we can discriminate Chinese sturgeon from other fish species and noise using certain descriptors such as the behaviour variables, echo characteristics and acoustic cross-section characteristics. However, identification of Chinese sturgeon from sediments is more difficult and needs a total of 24 variables. This is due to the limited knowledge about the acoustic-scattering properties of the substrate regions. Based on identified Chinese sturgeon individuals, 18 individuals were distributed in the region between the site of Gezhouba Dam and Miaozui reach, with a surface area of about 3.4 km(2). Seven individuals were distributed in the region between Miaozui and Yanshouba reach, with a surface area of about 13 km(2).
Resumo:
Ecological responses to dam construction are poorly understood, especially for downstream benthic algal communities. We examined the responses of benthic algal communities in downstream reaches of a tributary of the Xiangxi River, China, to the construction of a small run-of-river dam. From February 2003 to August 2006, benthic algae, chemical factors, and habitat characteristics were monitored upstream and downstream of the dam site. This period spanned 6 mo before dam construction and 37 mo after dam construction. Benthic algal sampling yielded 199 taxa in 59 genera that belonged to Bacillariophyta, Chlorophyta, and Cyanophyta. Some physical factors (flow velocity, water depth, and channel width) and 3 algal metrics (diatom species richness, Margalef diversity, and % erect individuals) were significantly affected by the dam construction, whereas chemical factors (e.g., NH4-N, total N, SiO2) were not. Nonmetric multidimensional scaling (NMS) ordinations showed that overall algal assemblage structure downstream of the dam sites was similar to that of upstream control sites before dam construction and for 1 year after dam construction (p > 0.05). However, sites belonging to upstream and downstream reaches were well separated on NMS axis 1 during the 2(nd) and 3(rd) years after dam construction. Our results suggest that impacts of dam construction on benthic algal communities took 2 to 3 y to emerge. Further development of a complete set of indicators is needed to address the impact of small-dam construction. Our observations underscore the need for additional studies that quantify ecological responses to dam construction over longer time spans.
Resumo:
The concentrations of major anions and cations, nitrogen and phosphorus, dissolved and particulate trace elements, and organic pollutants were determined for the middle and lower reaches of the Yangtze River (Changjiang) from below the Three Gorges Dam (TGD) to the mouth at Shanghai in November 2006. The concentration of dissolved inorganic phosphate (DIP) was constant at a low level of 6-8 mu gP/L, but the concentration of nitrate (NO3-) approximately doubled downstream and was closely correlated with K+. This translated to a daily load of well over 1000 It of dissolved inorganic nitrogen (DIN) at Datong. The average concentrations of dissolved Pb (0.078 +/- 0.023 mu g/L), Cd (0.024 +/- 0.009 mu g/L), Cr(0.57 +/- 0.09 mu g/L), Cu (1.9 +/- 0.7 mu g/L), and Ni (0.50 +/- 0.49 mu g/L) were comparable with those in other major world rivers, while As (3.3 +/- 1.3 mu g/L) and Zn (1.5 +/- 0.6 mu g/L) were higher by factors of 5.5 and 2.5, respectively. The trace element contents of suspended particles of As (31 +/- 28 mu g/g), Pb (83 +/- 34 mu g/g), and Ni (52 +/- 16 mu g/g) were close to maximum concentrations recommended for rivers by the European Community (EC). The average concentrations of Cd (2.6 +/- 1.6 mu g/g), Cr (185 +/- 102 mu g/g), Cu (115 +/- 106 mu g/g), and Zn (500 +/- 300 mu g/g) exceeded the EC standards by a factor of two, and Hg (4.4 +/- 4.7 mu g/g) by a factor of 4 to 5. Locally occurring peak concentrations exceed these values up to fourfold, among them the notorious elements As, Hg, and Tl. All dissolved and particulate trace element concentrations were higher than estimates made twenty years ago [Zhang, J., Geochemistry of trace metals from Chinese river/estuary systems: an overview. Estuar Coast Shelf Sci 1995; 41: 631-658.]. The enormous loads of anthropogenic pollutants disposed to the river were diluted by the large water discharge of the Yangtze even during the lowest flow resulting in the relatively low concentration levels of trace elements and organic pollutants observed. We estimated loads of e.g. As, Pb and Ni to the East China Sea to be about 4600 kg As d(-1), 3000 kg Pb d(-1), and 2000 kg Ni d(-1). About 6000 t d(-1) of dissolved organic carbon (DOC) was delivered into the sea at the time of our cruise. We tested for 236 organic pollutants, and only the most infamous were found to be barely above detection limits. We estimated that the load of chlorinated compounds, aromatic hydrocarbons, phenols, and PAHs were between 500 and 3500 kg d(-1). We also detected eight herbicides entering the estuary with loads of 5-350 kg d(-1). The pollutant load, even when at low concentrations, are considerable and pose an increasing threat to the health of the East China Sea ecosystem. (c) 2008 Elsevier B.V. All rights reserved.
Resumo:
In order to explore the temporal impacts of a small dam on riverine zooplankton, monthly samples were conducted from November 2005 to June 2006 in a reach of Xiangxi River, China, which is affected by a small hydropower plant. A total of 56 taxa of zooplankton were recorded during the study and rotifers were the most abundant group, accounting for 97% of total taxa, while the others were copepod nauplii and copepod adults. This study indicated that: (1) the small dam in the Xiangxi River study area created distinct physical and ecological conditions relative to free-flowing lotic reaches despite the constrained channel and small size of the dam; (2) the existence of the plant's small dam had a significant effect on the zooplankton community. In long periods of drought or dry seasons the effect of the dam on potamoplankton was more pronounced (e.g., November, February, March, and May). But the downfall or the connectivity of channel appeared to decrease the effect of small hydropower plants on riverine zooplankton (e.g., April). The present observation underscores the need for additional studies that provide more basic data on riverine zooplankton communities and quantify ecological responses to dam construction over longer time spans.
Resumo:
Benthic macroinvertebrates were assessed monthly in Xiangxi Bay of the Three Gorges Reservoir for two years after the initial closure of the dam. Mean total density of macroinvertebrates varied from 275 ind./m(2) during the first year to 5,094 ind./m(2) during the second year, and the community of 50 taxa was overwhelmingly dominated by oligochaetes and chironomids (44 and 48% of the total taxa, respectively). As sediment accumulated in the substrate of the bay, the species composition changed dramatically, with oligochaetes comprising 91.3-99.3% of the total abundance during the second year. The dominant oligochaetes were Limnodrilus hoffmeisteri and Nais inflata. The chironomids Procladius sp., and Polypedilum scalaenum group sp. were similarly abundant in both years.
Resumo:
The largest damming project to date, the Three Gorges Dam has been built along the Yangtze River (China), the most species-rich river in the Palearctic region. Among 162 species of fish inhabiting the main channel of the upper Yangtze, 44 are endemic and are therefore under serious threat of global extinction from the dam. Accordingly, it is urgently necessary to develop strategies to minimize the impacts of the drastic environmental changes associated with the dam. We sought to identify potential reserves for the endemic species among the 17 tributaries in the upper Yangtze, based on presence/absence data for the 44 endemic species. Potential reserves for the endemic species were identified by characterizing the distribution patterns of endemic species with an adaptive learning algorithm called a "self-organizing map" (SOM). Using this method, we also predicted occurrence probabilities of species in potential reserves based on the distribution patterns of communities. Considering both SOM model results and actual knowledge of the biology of the considered species, our results suggested that 24 species may survive in the tributaries, 14 have an uncertain future, and 6 have a high probability of becoming extinct after dam filling.
Resumo:
Since its completion in 1973 the Danjiangkou Dam has markedly changed downstream flows, water levels, temperatures, sediment loads and other water quality characteristics in downstream reaches of the Hanjiang River. There have been changes in the growth, spawning behaviour and overwintering condition of local fish populations, in the composition and abundance of food organisms and in the composition of the commercial fish catch. Despite the changed environment and the absence of a fish pass, fish populations are still able to grow and spawn under the new regime. Where conditions are like those of the Hanjiang River, dams may not necessarily have calamitous consequences for fishery production.
Resumo:
Condensed clusters of point defects within an InGaN/AlGaN double heterostructure grown by metal-organic vapor phase epitaxy on sapphire substrate have been observed using transmission electron microscopy. The existence of voids results in failure of the heterostructure in electroluminescence. The voids are 50-100 nm in diameter and are distributed inhomogeneously within In0.25Ga0.75N/AlGaN active layers. The density of the voids was measured as 10(15) cm(-3), which corresponds to a density of dangling bonds of 10(20) cm(-3). These dangling bonds may fully deplete free carriers in this double heterostructure and result in the heterostructure having high resistivity as confirmed by electrical measurement. (C) 2003 Elsevier Science B.V. All rights reserved.