33 resultados para mandatory arrest


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The mouse tumor cell 5180 and human liver carcinoma cell SMC 7721 cells were first treated with R-PE and its subunits (alpha, beta, gamma subunits), then irradiated with Argon laser (496 nm, 28.8 J/cm(2)). Survival rate was measured by MTT method. In order to compare the phototoxicity in normal cells, the mouse marrow cells were treated with photofrin II and beta-subunit, irradiated with 45 J/cm(2) of light; survival rate was also measured by MTT method. The result showed that R-PE subunits had better PDT effect on s180 cells than R-PE and lower phototoxicity in marrow cells than photofrin II Flow cytometric analysis showed that PDT results in a growth inhibition and a G(0)-G(1) cell cycle arrest in SMC 7721 cells. The tumor cells inhibited by PDT in vivo were morphologically observed by TEM, the tumor cell death was daze to the occlusion of tumor blood vessels and inducement of cell programmed death in nuclei. Therefore, with the advantage in special fluorescence activity, loth molecular weight, good light absorbent character and weak phototoxicity, R-PE subunit is art attractive option for improving the selectivity of PDT.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A nnual changes of the rep roduct ive act ivity in adult male p lateau p ika (Ochotona curzoniae) , a small endemic mammal in Q inghai2T ibet P lateau, w ere invest igated from J anuary to December, 1991. A ll of the animals w ere k illed and decap itated during the nigh t (23:00~ 24:00) and the p lasma, p ineal glands, testes ep ididym is, sem inal vesicles, deferent ducts were co llected and used for biochemical, and histo logical studies. Significant changes associated with seasonal cycles were found. (1) In February~ early April, the restoration phase, the weights of testes, epididym ides and deferent ducts were increased; the process of sperm atogenesis was strengthened and testo sterone level in plasma was increased, but the pineal weight and its melatonin content were decreased. (2) During the middle of April~ late May, the sexually active phase, a significant elevation of gonadal activity was observed. In this period, gonadalw eights were increased, spermatogenesis was completed, pineal weights were decreased and melatonin contents were fluctuated at alow level. These results suggested the increasing in sexual activity as well as in the ability of testo sterone secretion. (3) A striking reduction of test icular activity appears in June~A ugust. In this inhibition phase, gonada lweight, process of sperm atogenesis, plasma testo sterone level were decreased while the pineal weight and pineal melatonin content were increased. (4) During Sep tember~ J anuary, the sexually quiescent phase, declining in weights of testes and epididymides, arrest of spermatogenesis, decreasing of plasma testo sterone concent ration, fluctuating in pineal weights and increasing in pinealmelatonin level were observed. Our findings indicated that the male pikas under natural conditions exhibited an annual rep roductive cycle. A possible relationship between pineal activity and reproductive function was also suggested.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Through years of practice, reservoir management has already become the basic mode of foreign oil companies to realize the high-efficient development of the oil field. From the view of reservoir development and technological economy, reservoir management regards the study of the reservoir engineering, designs of reservoir projects and the dynamic analysis of the reservoir's performance as a system. In the fields of reservoir description, the establishment of the geological models and development models, the dynamic simulations of reservoir exploitation and the design of the oil engineering, reservoir management emphasizes the cooperation of the geology and the engineering, the combination of the engineering technology and the economic evaluation. In order to provide the means and basis for the reservoir geology study, reservoir evaluation, reserves calculation, numerical simulation, development plan and risk analysis, it adopts the reservoir management activities(team work) to make and implement the optimized oil field development management strategies so that secientific and democratic decision making can be achieved. Under the planned economic system for a long time, the purpose of Chinese reservoir development has been to fulfill the" mandatory" production task. With the deepening of the reform, the management organization of Chinese petroleum enterprises has been gradually going through the transition and reforms to the operational entity and the establishment of the mode of oil companies under the socialist market economy system. This research aims at introducing the advanced reservoir management technique from foreign countries to further improve the reservoir development results and wholly raise the economic benefits of Chinese mature land facieses sandstone reservoirs in the later stage of the water flooding. We are going to set up a set of modern reservoir management modes according to the reservoir features, current situation and existing problems of GangXi oil field of DaGang oil company. Through the study and implementation of the reservoir description and numerical simulation technology effectively, we plan to work out integrated adjustment projects, to study the related technology of oil recovery; to set up the effective confirmable data procedure and data management system of the reservoir management, to establish the coordinated model and workbench related to geology, engineering and economy in order to realize the real time supervision and evaluation on the process of reservoir development. We hope to stipulate modernization management tools for GangXi oil fields to rationally utilize various kinds of existing technological methods and to realize the economic exploitation and achieve the maximum benefits from the reservoir. The project of the modem reservoir management will be carried out on the GangXi oil field of DaGang oil company for this oil field is typical and has integrated foundamental materials and perfect networks. Besides, it is located in the good geographical position enjoying very convenient traffic. Implementing modern reservoir management will raise the recovery ratio, reduce the production cost and improve the working efficiency. Moreover, the popularization of modern reservoir management will improve the comprehensive benefits of DaGang oil company and even the whole Petro China. Through the reserch of this project, the following technical indicators can be reached: Establishing the concept of modern reservoir management. Establishing a set of integrated data information management system adapt to the features of GangXi reservoir. 3. Forming technical research modes of modern reservoir management suitable for mature reservoirs in the later developing stage. 4. Advancing projects of GangXi reservoir which are maxium optimized in engineering technique and economic benefits of oil exploitation. Besides, this set of technology, research principle and method can guide the mature reservoir of DaGang oil field and even the whole PetroChina to develop the further research of reservoir adjustment and improve the reservoir recovery factor and developing level constantly.