21 resultados para integrated coastal zone management
Resumo:
以隆德县李太平小流域为例,对比分析了退化小流域系统恢复重建过程中系统的生态经济要素变化,揭示系统演变趋势。应用能值方法分析了投入产出的动态变化,评价治理的生态经济效果。结果显示:农、林、牧业用地比例由1990年的6·2∶2·0∶1·0变为2003年的1·9∶1·4∶1·0,土地利用及种植结构趋于合理,农业产值所占比重由79·6%下降为54·8%,林业、牧业、副业产值比例分别由9·6%、9·6%、1·1%上升为22·7%、15·1%、7·4%,收入多样性指数也呈增加趋势,显示了流域收入构成的多元化,有利于生态经济系统的稳定。同时,恩格尔系数减小,表明人民生活水平日益提高。基于能值的流域生态经济系统投入产出效率动态研究结果表明在调整后的土地利用格局及种植结构下,净能值产出率由1990年的2·5增长到2003年的3·41,资源利用效率逐年提高,环境负荷率在1990、1995和2003年分别为2·55、2·44和2·11,呈减小趋势,能值持续性指数从1990年的0·98增加到2003年的1·62,经济与生态环境的协调性不断提高。研究结果表明该治理模式是成功的。
Resumo:
In this paper, we estimate the inputs of phosphorus (P) to the Yangtze River Basin and exports of dissolved inorganic phosphorus (DIP) from the river to the estuary for the period 1970-2003, by using the global NEWS-DIP model. Modeled DIP yields range from 2.5 kg P km(-2) yr(-1) in 1970 to 4.6 kg P km(-2) yr(-1) in 1985, and then dramatically increase to 14.1 kg P km(-2) yr(-1) in 2003. No significant difference between the modeled and measured values at the level of P = 0.05 is observed. The study also demonstrates variable source contributions of P to the modeled DIP during the period 1970-2003. Point sewage P input accounted for approximately 100% in the period 1970-1985 and substantially decreased to 24.8% in 2003. Chemical fertilizer contributed 25.4% of DIP yields in 1986 and increased continuously to 50.3% in 2003, while a stable trend in manure P contribution averaging 22.9% of DIP yields was shown in the same period. The study concludes that P inputs to the Yangtze River Basin and the river DIP export to the estuary have substantially increased during the study period consequence to human pressure.
Resumo:
Suspended Particulate Matter (SPM) concentrations at various levels within the water column, together with salinity and temperature, were measured using water samples collected from six stations across the Straits of Dover. The sampling programme covered a 16-month period, undertaken during 23 cruises. On the basis of the spatial variability in the concentrations, the water bodies are divided by several boundaries, controlled by tidal and wind conditions. Within the water column, SPM concentrations were higher near the sea bed than in the surface waters. Throughout the cross-section, maximum concentrations occurred adjacent to the coastlines. Temporal variability in the SPM concentration exists on daily and seasonal scales within the coastal waters (4.2 to 74.5 mg L-1): resuspension processes, in response to semi-diurnal tidal cycles (with a period of around 12.4 h) and spring-neap cycles (with a period of 15 days) make significant contributions. Distinctive seasonal/annual concentration changes have also been observed. In the offshore waters, such variability is much less significant (0.9 to 6.0 mg L-1). In the summer the English Coastal Zone is associated with relatively high SPM concentrations: the Central Zone has a low and stable SPM concentration between these zones, there is a Transitional Zone, where there is a rapid response of SPM concentration to wind forcing. Finally, the French Coastal Zone is characterized by variable (sometimes high) SPM concentrations. Because of the zonation, SPM fluxes within the Dover Strait are controlled by different transport mechanisms. Within the Central Zone, the flux can be represented by the product of mean water discharges and SPM concentrations. However, within the coastal zones fluctuations in SPM concentrations on various time-scales must be considered. In order to calculate the maximum and minimum SPM fluxes, 10 cells were divided in the strait. A simple modelling calculation has been proposed for this complex area. The effect of spring-neap tidal cycles and seasonal changes can contribute significantly to the overall flux, which is of the order of 20 x 10(6) t.yr(-1) (through the Dover Strait, towards the North Sea). Such an estimate is higher than most obtained previously. (C) 2000 Ifremer/CNRS/IRD/Editions scientifiques et medicales Elsevier SAS.
Resumo:
Suspended particulate matter (SPM) measurements obtained along a cross-section in the central English Channel (Wight-Cotentin transect) indicate that the area may be differentiated into: (1) an English coastal zone, associated with the highest concentrations; (2) a French coastal zone, with intermediate concentrations; and (3) the offshore waters of the Channel, characterised by a very low suspended-sediment load. The SPM particle-size distribution was modal close to the English coast (main mode 10-12 mu m); the remainder of the area was characterised by flat SPM distributions. Examination of the diatom communities in the SPM suggest:; that material resuspended in the intertidal zone and the estuarine environments was advected towards the offshore waters of the English Channel. Considerable variations in SPM concentrations occurred during a tidal cycle: maximum concentrations were sometimes up to 3 times higher than the minimum concentrations, Empirical orthogonal function (EOF) analysis of the SPM concentration time series indicates that, although the bottom waters were more turbid than the surficial waters, this was not likely to be the result of in situ sediment resuspension. Instead, the observed variations appear to be controlled mainly by advective mechanisms. The limited resuspension was probably caused by: (1) the limited availability of fine-grained material within the bottom sediments, and (2) 'bed-armouring' processes which protect the finer-grained fractions of the seabed material from erosion and entrainment within the overlying flow during the less energetic stages of the tide.
Resumo:
本文分析了我国内陆黄土以及东部沿渤海黄土的分布特点,重新分析了渤海自西向东大量地质钻孔以及大量海底的浅地层剖面记录,第一次发现并确定了全新世海相层下面的埋藏黄土的存在。将第二海相地层之上的埋藏黄土与沿岸的出露的马兰期黄土上部进行对比,研究表明,渤海海底埋藏黄土与沿岸出露黄土具有时代一致,同一类型,同一成因的特点。提出了沿渤海马兰期黄土的近源沉积及分布关系,建立了沿渤海黄土成因的扇型分布模式。
Resumo:
Through years of practice, reservoir management has already become the basic mode of foreign oil companies to realize the high-efficient development of the oil field. From the view of reservoir development and technological economy, reservoir management regards the study of the reservoir engineering, designs of reservoir projects and the dynamic analysis of the reservoir's performance as a system. In the fields of reservoir description, the establishment of the geological models and development models, the dynamic simulations of reservoir exploitation and the design of the oil engineering, reservoir management emphasizes the cooperation of the geology and the engineering, the combination of the engineering technology and the economic evaluation. In order to provide the means and basis for the reservoir geology study, reservoir evaluation, reserves calculation, numerical simulation, development plan and risk analysis, it adopts the reservoir management activities(team work) to make and implement the optimized oil field development management strategies so that secientific and democratic decision making can be achieved. Under the planned economic system for a long time, the purpose of Chinese reservoir development has been to fulfill the" mandatory" production task. With the deepening of the reform, the management organization of Chinese petroleum enterprises has been gradually going through the transition and reforms to the operational entity and the establishment of the mode of oil companies under the socialist market economy system. This research aims at introducing the advanced reservoir management technique from foreign countries to further improve the reservoir development results and wholly raise the economic benefits of Chinese mature land facieses sandstone reservoirs in the later stage of the water flooding. We are going to set up a set of modern reservoir management modes according to the reservoir features, current situation and existing problems of GangXi oil field of DaGang oil company. Through the study and implementation of the reservoir description and numerical simulation technology effectively, we plan to work out integrated adjustment projects, to study the related technology of oil recovery; to set up the effective confirmable data procedure and data management system of the reservoir management, to establish the coordinated model and workbench related to geology, engineering and economy in order to realize the real time supervision and evaluation on the process of reservoir development. We hope to stipulate modernization management tools for GangXi oil fields to rationally utilize various kinds of existing technological methods and to realize the economic exploitation and achieve the maximum benefits from the reservoir. The project of the modem reservoir management will be carried out on the GangXi oil field of DaGang oil company for this oil field is typical and has integrated foundamental materials and perfect networks. Besides, it is located in the good geographical position enjoying very convenient traffic. Implementing modern reservoir management will raise the recovery ratio, reduce the production cost and improve the working efficiency. Moreover, the popularization of modern reservoir management will improve the comprehensive benefits of DaGang oil company and even the whole Petro China. Through the reserch of this project, the following technical indicators can be reached: Establishing the concept of modern reservoir management. Establishing a set of integrated data information management system adapt to the features of GangXi reservoir. 3. Forming technical research modes of modern reservoir management suitable for mature reservoirs in the later developing stage. 4. Advancing projects of GangXi reservoir which are maxium optimized in engineering technique and economic benefits of oil exploitation. Besides, this set of technology, research principle and method can guide the mature reservoir of DaGang oil field and even the whole PetroChina to develop the further research of reservoir adjustment and improve the reservoir recovery factor and developing level constantly.