18 resultados para Tunnels.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

During tunnel constriction the classification of rock mass is widely used in tunnel design and construction. Moreover it offers the base information about tunnel investment and security. The quick classification of rock mass is very important for not delaying tunnel construction. Nowadays the tunnel engineers usually use initial survey files which are obtained by probe drilling to design a tunnel. It brings the problem that initial surrounding rock classification is usually much different from the real condition during the tunnel construction. Because initial surrounding rock lack credibility, it need us to make real time surrounding rock classification during the tunnel construction, and feed back the result to designers and constructors. Therefore, to find a quick wall rock classification method is very important not only for the time limit for a project but also for not delaying tunnel construction. Not all but many tunnels and underground constructions do suffer form collapse during the period of construction. Although accidental collapse in a large project in civil and geotechnical engineering sometimes appears to be a local event, if it occurred, it can bring about casualties, disrupted,production, construction delay, environmental damage, capital cost etc,therefore, it has been a difficult problem ,both in theory and in practice, establishing how to prevent underground structures form collapse and how to handle such an event in case in occurs. It is important to develop effective solutions and technical measures to prevent and control the collapse. According to the tunnel collapse occurred in Cheng De this paper analyze the main collapse mechanism leading to tunnel collapse and summon up the disposal method when collapse happened. It may be useful for tunnel construction in Cheng De in future. This paper is base on tunnel surrounding rock classification and tunnel support tasks during the tunnel construction in Cheng De area. It aims at solving 4 important problems in tunnel design and construction. 1) The relationship between rock rebound strength and rock single axle compression strength. First we go to the face wall and do rebound test on the tunnel face, then we chose some pieces of rock and do point loading test. Form the tests record we try to find the relationship between rock rebound strength and rock single axle compression strength. 2) The relationship between the value [BQ] and the value Q. First in order to obtain the information of rock character, rock strength, degree of weathering, the structure of rock mass, the joint condition, underground water condition and so on, we go to the tunnel face to do field investigation. And then we use two kinds of rock classification method to make surrounding rock classification. Base on the works above, finally we analyze the relationship between the value [BQ] and the value Q. 3) Sum up the mechanism leading to tunnel collapse and it disposal method in Cheng De area According to the tunnel collapse occurred in Cheng De this paper analyze the main reasons leading to the tunnel collapse and sum up the disposal method when collapse happened. 4) Obtain the properties of steel frame grid by numerical simulation. First we establish the 3D numeral model of steel frame grid by ADINA, and then find the mechanics properties by numerical simulation in ADINA. Second Based on the rock mass geological structure model, we established steel frame grid numeral model which is installed in the tunnel by FLAC3D and simulated the progress of tunnel construction. We hope that the support effect in tunnel can be evaluated from the numerical simulation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The scholars in the world have been trying to find an effective analytic algorithm of multiple hole problems usually meet in engineering designs. Though some studies on circular or elliptic holes had been achieved under specific conditions, no efforts were made to any multiple hole problems that is most significant for engineering designs. The author has made further studies on any multiple hole problems, using complex variable function method and Schwarz alternating method. After solving a series of technological difficulties, the author obtains an effective analytic algorithm, and acquires stress field and displacement field with high accuracy, which can be conducted for arbitrary many iterations according to practical accuracy requirements. In addition, th solution of stress and displacement fields, even for multiple holes of complex shapes and smaller distances. Further, the author made preliminary studies on viscoelastic displacement solution for any double holes. In terms of the obtained displacement solution of any multiple holes, this paper studies displacement back-analysis for the excavations of two tunnels, and find that the back-analysis method is accurate. Additionally, the author presents the mathematical prove of inversion uniqueness for ground stresses, elastic modulus and Poisson ratio. The author believes that the accurate analytic algorithm provided in this paper will presents an effective way to stress and displacement analysis for any multiple hole problems, optimal arrangement of multiple holes, hole shape optimization of multiple holes, etc..

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Guangxi Longtan Hydropower Station is not only a representative project of West Developing and Power Transmission from West to East in China, but also the second Hydropower Station to Three Gorges Project which is under construction in China. There are 770 X 104m3 creeping rock mass on the left bank slope in upper reaches, in which laid 9 water inlet tunnels and some underground plant buildings. Since the 435m high excavated slope threatens the security of the Dam, its deformation and stability is of great importance to the power station.Based on the Autodesk Map2004, Longtan Hydropower Station Monitoring Information System on Left Bank has been basically finished on the whole. Integrating the hydropower station monitoring information into Geographic Information System(GIS) environment, managers and engineers can dynamically gain the deformation information of the slop by query the symbols. By this means, designers can improve the correctness of analysis, and make a strategic and proper decision. Since the system is beneficial to effectively manage the monitoring-data, equitably save the cost of design and safe construction, and decrease the workload of the engineers, it is a successful application to the combination of hydropower station monitoring information management and computer information system technology.At the same time, on the basis of the geological analysis and rock mass toppling deformation and failure mechanism analysis of Longtan engineering left bank slope, the synthetic space-time analysis and influence factors analysis on the surface monitoring data and deep rock mass monitoring data of A-zone on left bank slope are carried on. It shows that the main intrinsic factor that effects the deformation of Zone A is the argillite limestone interbedding toppling structure, and its main external factors are rain and slope excavation. What's more, Degree of Reinforcement Demand(DRD) has been used to evaluate the slop reinforce effect of Zone A on left bank according to the Engineering Geomechanics-mate-Synthetics(EGMS). The result shows that the slop has been effective reinforced, and it is more stable after reinforce.At last, on the basis of contrasting with several forecast models, a synthetic forecast GRAV model has been presented and used to forecast the deformation of zone A on left bank in generating electricity period. The result indicates that GRAV model has good forecast precision, strong stability, and practical valuable reliability.