2 resultados para stakeholder management

em Cambridge University Engineering Department Publications Database


Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE: This study identifies the stakeholders who have a role in medical device purchasing within the wider system of health-care delivery and reports on their particular challenges to promote patient safety during purchasing decisions. METHODS: Data was collected through observational work, participatory workshops, and semi-structured qualitative interviews, which were analyzed and coded. The study takes a systems-based and engineering design approach to the study. Five hospitals took part in this study, and the participants included maintenance, training, clinical end-users, finance, and risk departments. RESULTS: The main stakeholders for purchasing were identified to be staff from clinical engineering (Maintenance), device users (Clinical), device trainers (Training), and clinical governance for analyzing incidents involving devices (Risk). These stakeholders display varied characteristics in terms of interpretation of their own roles, competencies for selecting devices, awareness and use of resources for purchasing devices, and attitudes toward the purchasing process. The role of "clinical engineering" is seen by these stakeholders to be critical in mediating between training, technical, and financial stakeholders but not always recognized in practice. CONCLUSIONS: The findings show that many device purchasing decisions are tackled in isolation, which is not optimal for decisions requiring knowledge that is currently distributed among different people within different departments. The challenges expressed relate to the wider system of care and equipment management, calling for a more systemic view of purchasing for medical devices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the findings from four case studies on stakeholder engagement in new health information and communication technology (ICT) product-service system (PSS) development. The degree of connectivity between the new health ICT PSS and its intended operating environment has emerged to be an important contextual factor that may impact the decision of stakeholder engagement in the early stage development process. Along with the proposition of a four-level framework to guide stakeholder identification for new PSS development, three stakeholder engagement propositions that are based on the degree of connectivity are developed. Analysis has shown that there can be two types of connectivity: data and process. Moreover, each connectivity type can be characterized by how much the new PSS is connected with its environment: independent if there is no linkage, linked if it interfaces with, or incorporated if it is embedded into. Furthermore, depending upon whether and to what extent the PSS has data and process connectivity with its intended operating environment, the stakeholder engagement needs in early stage development vary. The propositions presented in this paper provide important directions for future work exploring PSS characterization and stakeholder engagement decision in early stage new PSS development in the healthcare industry. © 2013 PICMET.