3 resultados para risk assessments

em Cambridge University Engineering Department Publications Database


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Infrastructure project sustainability assessment typically entails the use of specialised assessment tools to measure and rate project performance against a set of criteria. This paper looks beyond the prevailing approaches to sustainability assessments and explores sustainability principles in terms of project risks and opportunities. Taking a risk management approach to applying sustainability concepts to projects has the potential to reconceptualise decision structures for sustainability from bespoke assessments to becoming a standard part of the project decisionmaking process. By integrating issues of sustainability into project risk management for project planning, design and construction, sustainability is considered within a more traditional business and engineering language. Currently, there is no widely practised approach for objectively considering the environmental and social context of projects alongside the more traditional project risk assessments of time, cost and quality. A risk-based approach would not solve all the issues associated with existing sustainability assessments but it would place sustainability concerns alongside other key risks and opportunities, integrating sustainability with other project decisions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

BACKGROUND: After investing significant amounts of time and money in conducting formal risk assessments, such as root cause analysis (RCA) or failure mode and effects analysis (FMEA), healthcare workers are left to their own devices in generating high-quality risk control options. They often experience difficulty in doing so, and tend toward an overreliance on administrative controls (the weakest category in the hierarchy of risk controls). This has important implications for patient safety and the cost effectiveness of risk management operations. This paper describes a before and after pilot study of the Generating Options for Active Risk Control (GO-ARC) technique, a novel tool to improve the quality of the risk control options generation process. OUTCOME MEASURES: The quantity, quality (using the three-tiered hierarchy of risk controls), variety, and novelty of risk controls generated. RESULTS: Use of the GO-ARC technique was associated with improvement on all measures. CONCLUSIONS: While this pilot study has some notable limitations, it appears that the GO-ARC technique improved the risk control options generation process. Further research is needed to confirm this finding. It is also important to note that improved risk control options are a necessary, but not sufficient, step toward the implementation of more robust risk controls.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Contaminant behaviour in soils and fractured rock is very complex, not least because of the heterogeneity of the subsurface environment. For non-aqueous phase liquids (NAPLs), a liquid density contrast and interfacial tension between the contaminant and interstitial fluid adds to the complexity of behaviour, increasing the difficulty of predicting NAPL behaviour in the subsurface. This paper outlines the need for physical model tests that can improve fundamental understanding of NAPL behaviour in the subsurface, enhance risk assessments of NAPL contaminated sites, reduce uncertainty associated with NAPL source remediation and improve current technologies for NAPL plume remediation. Four case histories are presented to illustrate physical modelling approaches that have addressed problems associated with NAPL transport, remediation and source zone characterization. © 2006 Taylor & Francis Group, London.