3 resultados para misleading and deceptive conduct

em Cambridge University Engineering Department Publications Database


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: The purpose of this study is to examine a buyer's adoption of servitization and the associated implications for the relationships with its suppliers. Design/methodology/approach: The authors use the case study approach to examine the tripartite relationship between a manufacturing company and two of its two suppliers. The paper explores the perspectives of employees on multiple organisational levels, and collects evidence on both sides of a relationship. The authors use template analysis utilising Cannon and Perreault's relationship connectors framework to analyse the data. Findings: There are overarching implications of servitization adoption for buyer-supplier relationships. The implications are notable in all five relationship connectors. Parties expected more open exchange of information, operational linkages were strengthened and changes in the structural arrangements of relationships were witnessed. Legal contracts are complemented by relational norms. The authors also observed a departure away from a win-lose mentality and increased levels of supplier adaptation to support the buyer's provision of integrated solutions. Research limitations/implications: The findings are confined to this tripartite relationship and to an extent are context specific. Practical implications: The study unveils buyer-supplier relationships in a servitized context and provides managers with a better understanding of some of the potential implications that the adoption of a servitization strategy may have for managing buyer-supplier relationships. Originality/value: This is the first empirical study that explores the implications of servitization on buyer-supplier relationships. It advances the understanding of the implications that the adoption of servitization has on the manner in which two parties interrelate and conduct commercial exchange. © Emerald Group Publishing Limited.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Image-based (i.e., photo/videogrammetry) and time-of-flight-based (i.e., laser scanning) technologies are typically used to collect spatial data of infrastructure. In order to help architecture, engineering, and construction (AEC) industries make cost-effective decisions in selecting between these two technologies with respect to their settings, this paper makes an attempt to measure the accuracy, quality, time efficiency, and cost of applying image-based and time-of-flight-based technologies to conduct as-built 3D reconstruction of infrastructure. In this paper, a novel comparison method is proposed, and preliminary experiments are conducted. The results reveal that if the accuracy and quality level desired for a particular application is not high (i.e., error < 10 cm, and completeness rate > 80%), image-based technologies constitute a good alternative for time-of-flight-based technologies and significantly reduce the time and cost needed for collecting the data on site.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Image-based (i.e., photo/videogrammetry) and time-of-flight-based (i.e., laser scanning) technologies are typically used to collect spatial data of infrastructure. In order to help architecture, engineering, and construction (AEC) industries make cost-effective decisions in selecting between these two technologies with respect to their settings, this paper makes an attempt to measure the accuracy, quality, time efficiency, and cost of applying image-based and time-of-flight-based technologies to conduct as-built 3D reconstruction of infrastructure. In this paper, a novel comparison method is proposed, and preliminary experiments are conducted. The results reveal that if the accuracy and quality level desired for a particular application is not high (i.e., error < 10 cm, and completeness rate > 80%), image-based technologies constitute a good alternative for time-of-flight-based technologies and significantly reduce the time and cost needed for collecting the data on site.