3 resultados para law office management
em Cambridge University Engineering Department Publications Database
Resumo:
Climate change is expected to have significant impact on the future thermal performance of buildings. Building simulation and sensitivity analysis can be employed to predict these impacts, guiding interventions to adapt buildings to future conditions. This article explores the use of simulation to study the impact of climate change on a theoretical office building in the UK, employing a probabilistic approach. The work studies (1) appropriate performance metrics and underlying modelling assumptions, (2) sensitivity of computational results to identify key design parameters and (3) the impact of zonal resolution. The conclusions highlight the importance of assumptions in the field of electricity conversion factors, proper management of internal heat gains, and the need to use an appropriately detailed zonal resolution. © 2010 Elsevier B.V. All rights reserved.
Resumo:
The recent advances in urban wireless communications and protocols that spurred the development of city-wide wireless infrastructure motivated this research, since in many cases, construction sites are not conveniently located for wired connectivity. Large scale transportation projects for example, such as new highways, railroad tracks and the networks of utilities (power-lines, phone lines, mobile towers, etc) that usually follow them are constructed in areas where wired infrastructure for data exchange is often expensive and time-consuming to deploy. The communication difficulties that can be encountered in such construction sites can be addressed with a wireless communications link between the construction site and the decision-making office. This paper presents a case study on long-range, wireless communications suitable for data exchange between construction sites and engineering headquarters. The purpose of this study was to define the requirements for a reliable wireless communications model where common types of electronic construction data will be exchanged in a fast and efficient manner, and construction site personnel will be able to interact and share knowledge, information and electronic resources with the office staff.