32 resultados para construction project teams

em Cambridge University Engineering Department Publications Database


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Choosing a project manager for a construction project—particularly, large projects—is a critical project decision. The selection process involves different criteria and should be in accordance with company policies and project specifications. Traditionally, potential candidates are interviewed and the most qualified are selected in compliance with company priorities and project conditions. Precise computing models that could take various candidates’ information into consideration and then pinpoint the most qualified person with a high degree of accuracy would be beneficial. On the basis of the opinions of experienced construction company managers, this paper, through presenting a fuzzy system, identifies the important criteria in selecting a project manager. The proposed fuzzy system is based on IF-THEN rules; a genetic algorithm improves the overall accuracy as well as the functions used by the fuzzy system to make initial estimates of the cluster centers for fuzzy c-means clustering. Moreover, a back-propagation neutral network method was used to train the system. The optimal measures of the inference parameters were identified by calculating the system’s output error and propagating this error within the system. After specifying the system parameters, the membership function parameters—which by means of clustering and projection were approximated—were tuned with the genetic algorithm. Results from this system in selecting project managers show its high capability in making high-quality personnel predictions

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Architecture, Engineering, Construction and Facilities Management (AEC/FM) industry is rapidly becoming a multidisciplinary, multinational and multi-billion dollar economy, involving large numbers of actors working concurrently at different locations and using heterogeneous software and hardware technologies. Since the beginning of the last decade, a great deal of effort has been spent within the field of construction IT in order to integrate data and information from most computer tools used to carry out engineering projects. For this purpose, a number of integration models have been developed, like web-centric systems and construction project modeling, a useful approach in representing construction projects and integrating data from various civil engineering applications. In the modern, distributed and dynamic construction environment it is important to retrieve and exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research demonstrated that a major hurdle in AEC/FM data integration in such systems is caused by its variety of data types and that a significant part of the data is stored in semi-structured or unstructured formats. Therefore, new integrative approaches are needed to handle non-structured data types like images and text files. This research is focused on the integration of construction site images. These images are a significant part of the construction documentation with thousands stored in site photographs logs of large scale projects. However, locating and identifying such data needed for the important decision making processes is a very hard and time-consuming task, while so far, there are no automated methods for associating them with other related objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The embodied energy (EE) and gas emissions of four design alternatives for an embankment retaining wall system are analyzed for a hypothetical highway construction project. The airborne emissions considered are carbon dioxide (CO 2), methane (CH 4), nitrous oxide (N 2O), sulphur oxides (SO X), and nitrogen oxides (NO X). The process stages considered in this study are the initial materials production, transportation of construction machineries and materials, machinery operation during installation, and machinery depreciations. The objectives are (1) to determine whether there are statistically significant differences among the structural alternatives; (2) to understand the relative proportions of impacts for the process stages within each design; (3) to contextualize the impacts to other aspects in life by comparing the computed EE values to household energy consumption and car emission values; and (4) to examine the validity of the adopted EE as an environmental impact indicator through comparison with the amount of gas emissions. For the project considered in this study, the calculated results indicate that propped steel sheet pile wall and minipile wall systems have less embodied energy and gas emissions than cantilever steel tubular wall and secant concrete pile wall systems. The difference in CO 2 emission for the retaining wall of 100 m length between the most and least environmentally preferable wall design is equivalent to an average 2.0 L family car being driven for 6.2 million miles (or 62 cars with a mileage of 10,000 miles/year for 10 years). The impacts in construction are generally notable and careful consideration and optimization of designs will reduce such impacts. The use of recycled steel or steel pile as reinforcement bar is effective in reducing the environmental impact. The embodied energy value of a given design is correlated to the amount of gas emissions. © 2011 American Society of Civil Engineers.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In response to significant changes within the aerospace industry during recent years, a new approach is proposed for developing complex products in a globally distributed environment. Current approaches favour collocating project teams, but collocation is often not practical, nor economically justifiable. The Macro Concept is a process whereby products can be developed by globally distributed task teams, managed by a Core team. In the development of this concept, particular attention is paid to the human factors, the product decomposition and the infrastructure that supports the product introduction process in a globalized industry.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Effective data communications between the project site and decision making office can be critical for the success of a construction project. It allows convenient access to centrally stored information and allows centrally located decision makers to remotely monitor the site and collect data in real-time. However, high bandwidth, flexible data communication networks, such as wired local area networks, can often be time-consuming and costly to deploy for such purposes especially when project sites (dams, highways, etc.) are located in rural, undeveloped areas where networking infrastructure is not available. In such construction sites, wireless networking could reliably link the construction site and the decision-making office. This paper presents a case study on long-distance, site – office wireless data communications. The purpose was to investigate the capability of wireless technology in exchanging construction data in a fast and efficient manner and in allowing site personnel to interact and share knowledge and data with the office staff. This study took place at the University of Michigan’s campus where performance, reliability, and cost/benefit tests were performed. The indoor and outdoor tests performed demonstrated the suitability of this technology for office-site data communications and exposed the need for more research to further improve the reliability and data handling of this technology.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction industry is a sector that is renowned for the slow uptake of new technologies. This is usually due to the conservative nature of this sector that relies heavily on tried and tested and successful old business practices. However, there is an eagerness in this industry to adopt Building Information Modelling (BIM) technologies to capture and record accurate information about a building project. But vast amounts of information and knowledge about the construction process is typically hidden within informal social interactions that take place in the work environment. In this paper we present a vision where smartphones and tablet devices carried by construction workers are used to capture the interaction and communication between workers in the field. Informal chats about decisions taken in the field, impromptu formation of teams, identification of key persons for certain tasks, and tracking the flow of information across the project community, are some pieces of information that could be captured by employing social sensing in the field. This information can not only be used during the construction to improve the site processes but it can also be exploited by the end user during maintenance of the building. We highlight the challenges that need to be overcome for this mobile and social sensing system to become a reality. © 2012 ACM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The conceptual design phase of any project is, by its very nature, a vibrant, creative and dynamic period. It can also be disorganized with much backtracking accompanying the exchange of information between design team members. The transfer of information, ideas and opinion is critical to the development of concepts and as such, rather than being recognized as merely a component of conceptual design activity, it needs to be understood and, ultimately, managed. This paper describes an experimental workshop involving fifteen design professionals in which conceptual design activity was tracked, and subsequently mapped, in order to test and validate a tentative design framework (phase and activity model). The nature of the design progression of the various teams is captured and analyzed, allowing a number of conclusions to be drawn regarding both the iterative nature of this phase of design and how teams of professionals actually design together.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sir John Egan’s 1998 report on the construction industry (Construction Task Force 1998) noted its confrontational and adversarial nature. Both the original report and its subsequent endorsement in Accelerating Change (Strategic Forum 2002) called for improved working relationships—so-called ‘integration’—within and between both design and construction aspects. In this paper, we report on our observations of on-site team meetings for a major UK project during its construction phase. We attended a series of team meetings and recorded the patterns of verbal interaction that took place within them. In reporting our findings, we have deliberately used a graphical method for presenting the results, in the expectation that this will make them more readily accessible to designers. Our diagrams of these interaction patterns have already proved to be intuitively and quickly understood, and have generated interest and discussion among both those we observed and others who have seen them. We noted that different patterns of communication occurred in different types of meetings. Specifically, in the problem-solving meeting, there was a richness of interaction that was largely missing from progress meetings and technical meetings. Team members expressed greater satisfaction with this problem-solving meeting where these enriched exchanges took place. By making comparisons between the different patterns, we are also able to explore functional roles and their interactions. From this and other published evidence, we conclude that good teamworking practices depend on a complex interplay of relations and dependencies embedded within the team.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report is intended to contribute to strengthening the work of the Government, the Strategic Forum and the Specialist Engineering Alliance in bringing about a more integrated and a more sustainable industry. Its aim is to examine the potential for improving the sustainability of the built environment through an integrated approach to procurement and delivery, in which the role of the specialist engineering sector is recognised for its vital ability to improve building performance. Based on wide ranging knowledge and expertise across the construction sector, it puts forward a vision for sustainable buildings and sets out the actions needed from Government, clients, consultants, contractors and manufacturers to ensure the vision is realised. The report complements the Strategy for Sustainable Construction published by the Department for Business, Enterprise and Regulatory Reform (June 2008).