13 resultados para The 7pm Project

em Cambridge University Engineering Department Publications Database


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper describes the development of a software design aid for use at the conceptual stage of engineering design. It is intended for use in the design of mechatronic products but has wider potential uses. Early approaches were based on function structures and tables of options and the system that evolved allows the assembly of schemes linked by matching their input and output ports. A database of components is provided which can be accessed via different indexes and the designer can easily create and compare alternative schemes at the concept stage. A bond graph approach is used to define the interconnections between components. This allows correct port matching but also provides for future development such as constraint propagation through the design and links to simulation tools. © 1993 Springer-Verlag New York Inc.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Water service providers (WSPs) in the UK have statutory obligations to supply drinking water to all customers that complies with increasingly stringent water quality regulations and minimum flow and pressure criteria. At the same time, the industry is required by regulators and investors to demonstrate increasing operational efficiency and to meet a wide range of performance criteria that are expected to improve year-on-year. Most WSPs have an ideal for improving the operation of their water supply systems based on increased knowledge and understanding of their assets and a shift to proactive management followed by steadily increasing degrees of system monitoring, automation and optimisation. The fundamental mission is, however, to ensure security of supply, with no interruptions and water quality of the highest standard at the tap. Unfortunately, advanced technologies required to fully understand, manage and automate water supply system operation either do not yet exist, are only partially evolved, or have not yet been reliably proven for live water distribution systems. It is this deficiency that the project NEPTUNE seeks to address by carrying out research into 3 main areas; these are: data and knowledge management; pressure management (including energy management); and the associated complex decision support systems on which to base interventions. The 3-year project started in April of 2007 and has already resulted in a number of research findings under the three main research priority areas (RPA). The paper summarises in greater detail the overall project objectives, the RPA activities and the areas of research innovation that are being undertaken in this major, UK collaborative study. Copyright 2009 ASCE.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This report deals with collaborations of engineering consultants and clients in the automobile industry.

In these relationships three main challenges have been identified which have to be addressed by the consultancies. Therefore, the research takes the viewpoint of the consulting side. The challenges are

(i) the appropriate project goal definition;

(ii) achieving client satisfaction; and

(iii) dealing with international clients.

An investigation of such a relationship carried out on a case study shows that improvements can be achieved through communication support. The ways to do that are proposed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A high-altitude tethered balloon (HATB) reaching a height of 20 km has numerous applications including communications, meteorological monitoring, surveillance and, for the current paper, geoengineering. The HATB configuration consists of a 20 km tether rising up from the ground through the troposphere, where the wind-regime can be turbulent and include high-wind velocities due to the jet-stream, up into the more stable stratosphere where the tether would be attached to a spherical balloon. This paper evaluates wind-excited vibration of a HATB and will investigate the advantages of using a streamlined instead of a circular tether profile. Streamlining the tether reduces drag but introduces stability problems and complicates the numerical modelling. Consequently, prior to a thorough investigation of the stability issues due to fluid-structure interaction, a 3D nonlinear lumped-mass HATB model is used to quantify the benefit of a streamlined tether. The benefit is quantified by comparing the system specifications - such as balloon size and the tension in the tether - required to meet certain design requirements driven by the Stratospheric Particle Injection for Climate Engineering (SPICE) project. The SPICE project is investigating the feasibility of climate engineering using a HATB.