8 resultados para Royal Court Theatre.
em Cambridge University Engineering Department Publications Database
Resumo:
This paper discusses the application of Discrete Event Simulation (DES) in modelling the complex relationship between patient types, case-mix and operating theatre allocation in a large National Health Service (NHS) Trust in London. The simulation model that was constructed described the main features of nine theatres, focusing on operational processes and patient throughput times. The model was used to test three scenarios of case-mix and to demonstrate the potential of using simulation modelling as a cost effective method for understanding the issues of healthcare operations management and the role of simulation techniques in problem solving. The results indicated that removing all day cases will reduce patient throughput by 23.3% and the utilization of the orthopaedic theatre in particular by 6.5%. This represents a case example of how DES can be used by healthcare managers to inform decision making. © 2008 IEEE.
Resumo:
Strategic planning can be an arduous and complex task; and, once a plan has been devised, it is often quite a challenge to effectively communicate the principal missions and key priorities to the array of different stakeholders. The communication challenge can be addressed through the application of a clearly and concisely designed visualisation of the strategic plan - to that end, this paper proposes the use of a roadmapping framework to structure a visual canvas. The canvas provides a template in the form of a single composite visual output that essentially allows a 'plan-on-a-page' to be generated. Such a visual representation provides a high-level depiction of the future context, end-state capabilities and the system-wide transitions needed to realise the strategic vision. To demonstrate this approach, an illustrative case study based on the Australian Government's Defence White Paper and the Royal Australian Navy's fleet plan will be presented. The visual plan plots the in-service upgrades for addressing the capability shortfalls and gaps in the Navy's fleet as it transitions from its current configuration to its future end-state vision. It also provides a visualisation of project timings in terms of the decision gates (approval, service release) and specific phases (proposal, contract, delivery) together with how these projects are rated against the key performance indicators relating to the technology acquisition process and associated management activities. © 2013 Taylor & Francis.
Resumo:
A methodology for the analysis of building energy retrofits has been developed for a diverse set of buildings at the Royal Botanic Gardens (RBG), Kew in southwest London, UK. The methodology requires selection of appropriate building simulation tools dependent on the nature of the principal energy demand. This has involved the development of a stand-alone model to simulate the heat flow in botanical glasshouses, as well as stochastic simulation of electricity demand for buildings with high equipment density and occupancy-led operation. Application of the methodology to the buildings at RBG Kew illustrates the potential reduction in energy consumption at the building scale achievable from the application of retrofit measures deemed appropriate for heritage buildings and the potential benefit to be gained from onsite generation and supply of energy. © 2014 Elsevier Ltd.