18 resultados para Riparian front
em Cambridge University Engineering Department Publications Database
Resumo:
Product innovativeness is a primary contingent factor to be addressed for the development of flexible management for the front-end. However, due to complexity of this early phase of the innovation process, the definition of which attributes to customise is critical to support a contingent approach. Therefore, this study investigates front-end attributes that need to be customised to permit effective management for different degrees of innovation. To accomplish this aim, a literature review and five case studies were performed. The findings highlighted the front-end strategic and operational levels as factors influencing the front-end attributes related to product innovativeness. In conclusion, this study suggests that two front-end attributes should be customised: development activities and decision-making approach. Copyright © 2011 Inderscience Enterprises Ltd.
Resumo:
Decision-making at the front-end of innovation is critical for the success of companies. This paper presents a simple visual method, called DMCA (Decision-Making Criteria Assessment), which was created to clarify and improve decision-making at the front-end of innovation. The method maps the uncertainty of project information and importance of decision criteria, compiling a measure that indicates whether the decision is highly uncertain, what information interferes with it, and what criteria are actually being considered. The DMCA method was tested in two projects that faced decision-making issues, and the results confirm the benefits of using this method in decision-making at the front-end. © 2012 IEEE.
Resumo:
Water front structures have suffered significant damage in many of the recent earthquakes. These include gravity type quay walls, vertically composite walls, cantilever retaining walls, anchored bulkheads and similar structures. One of the primary causes for the poor performance of these classes of structures is the liquefaction of the foundation soil and in some instances liquefaction of the backfill soil. The liquefaction of the soil in-front of the quay wall tends to cause large lateral displacements and rotation of the wall. Often such gravity walls are placed on rubble mound deposited onto the sea bed.This paper presents finite element analyses of such a problem in which strength degradation of the foundation soil and the backfill material will be modelled using PZ mark III constitutive model. The performance of the wall in terms of its lateral displacement, vertical settlement and/or the rotation suffered by the wall will be presented. In addition, the contours of the horizontal and vertical effective stresses and the excess pore pressure ratio will be presented at different time instants together with hyrdraulic gradients. Immediately after the earthquake, the hydraulic gradients indicate migration of pore water into the region below the wall, suggesting further softening of the foundation soil below the wall.