3 resultados para North West Company.

em Cambridge University Engineering Department Publications Database


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper investigates 'future-proofing' as an unexplored yet all-important aspect in the design of low-energy dwellings. It refers particularly to adopting lifecycle thinking and accommodating risks and uncertainties in the selection of fabric energy efficiency measures and low or zero-carbon technologies. Based on a conceptual framework for future-proofed design, the paper first presents results from the analysis of two 'best practice' housing developments in England; i.e., North West Cambridge in Cambridge and West Carclaze and Baal in St. Austell, Cornwall. Second, it examines the 'Energy and CO2 Emissions' part of the Code for Sustainable Homes to reveal which design criteria and assessment methods can be practically integrated into this established building certification scheme so that it can become more dynamic and future-oriented.Practical application: Future-proofed construction is promoted implicitly within the increasingly stringent building regulations; however, there is no comprehensive method to readily incorporate futures thinking into the energy design of buildings. This study has a three-fold objective of relevance to the building industry:Illuminating the two key categories of long-term impacts in buildings, which are often erroneously treated interchangeably:- The environmental impact of buildings due to their long lifecycles.- The environment's impacts on buildings due to risks and uncertainties affecting the energy consumption by at least 2050. This refers to social, technological, economic, environmental and regulatory (predictable or unknown) trends and drivers of change, such as climate uncertainty, home-working, technology readiness etc.Encouraging future-proofing from an early planning stage to reduce the likelihood of a prematurely obsolete building design.Enhancing established building energy assessment methods (certification, modelling or audit tools) by integrating a set of future-oriented criteria into their methodologies. © 2012 The Chartered Institution of Building Services Engineers.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

AIMS: To assess the occurrence of diagnostic delay in primary antibody deficiency in the period 1989-2002, since a similar study in 1989, and to assess the impact of UK national guidelines communicated in 1995. METHODS: A retrospective case note review was performed of 89 consecutive patients with antibody deficiency referred to a regional referral centre for clinical immunology in north west England and north Wales. The delay in diagnosis and the estimated resulting morbidity in terms of infections were assessed. RESULTS: Fifty six of the 89 patients experienced delay in diagnosis. The overall median delay was 2 years (mean, 4.4), resulting in substantial morbidity (equivalent to two major infections and one minor infection). This shows a moderate improvement since the previous study in 1989 and since the introduction of UK national guidelines in 1995. Respiratory infections are the most frequent presenting infections, and respiratory physicians the most common source of referral. CONCLUSIONS: There is still considerable delay in the diagnosis of primary antibody deficiency, but the data suggest an improvement in practice since the previous study in 1989 and the distribution of national guidelines in 1995.