5 resultados para Knowledge of workers

em Cambridge University Engineering Department Publications Database


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Raising design quality and value in the built environment requires continuous improvement, drawing on feedback from clients or occupiers and other industry players. The challenging task for architectural and engineering designers has always been to use their intellectual knowledge to deliver both forms of benefits, tangibles and intangibles, in the built environment. Increasingly as clients demand best value for money, there is a greater need to understand the potential from intangibles, to see projects not as ends in themselves but as means to improved quality of life and wealth creation. As we begin to understand more about how - through the design of the built environment - to deliver these improvements in outcomes, clients will be better placed to expect their successful delivery from designers, and designers themselves will be better placed to provide them. This paper discusses cross-disciplinary issues about intangibles and is aimed at designers, clients, investors and entrepreneurs within the built environment. It presents some findings from a minuscule study that investigated intangible benefits in a new primary school. © 2004 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Confronted with high variety and low volume market demands, many companies, especially the Japanese electronics manufacturing companies, have reconfigured their conveyor assembly lines and adopted seru production systems. Seru production system is a new type of work-cell-based manufacturing system. A lot of successful practices and experience show that seru production system can gain considerable flexibility of job shop and high efficiency of conveyor assembly line. In implementing seru production, the multi-skilled worker is the most important precondition, and some issues about multi-skilled workers are central and foremost. In this paper, we investigate the training and assignment problem of workers when a conveyor assembly line is entirely reconfigured into several serus. We formulate a mathematical model with double objectives which aim to minimize the total training cost and to balance the total processing times among multi-skilled workers in each seru. To obtain the satisfied task-to-worker training plan and worker-to-seru assignment plan, a three-stage heuristic algorithm with nine steps is developed to solve this mathematical model. Then, several computational cases are taken and computed by MATLAB programming. The computation and analysis results validate the performances of the proposed mathematical model and heuristic algorithm. © 2013 Springer-Verlag London.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Decision making at the front end of innovation is critical for the success of companies. This paper presents a method, called decision making based on knowledge (DeBK), which was created to analyze the decision-making process at the front end. The method evaluates the knowledge of project information and the importance of decision criteria, compiling a measure that indicates whether decisions are founded on available knowledge and what criteria are in fact being considered to delineate them. The potential contribution of DeBK is corroborated through two projects that faced decision-making issues at the front end of innovation. © 2014 RADMA and John Wiley & Sons Ltd.