8 resultados para Habitat e sistemas Fuzzy
em Cambridge University Engineering Department Publications Database
Resumo:
The conventional approaches to poverty alleviation in the slums entail a cocktail of interventions in health, education, governance and physical improvements, often stretching the scarce resources far and thin. Driven by the 'poverty' mindset, physical measures such as minimal paving, public water posts and community latrines actually brand the slums apart instead of assimilating them into the urban infrastructure fabric. The concept of Slum Networking proposes comprehensive water and environmental sanitation infrastructure as the central and catalytic leverage for holistic development. At costs less than the conventional 'slum' solutions, it tries to penetrate a high quality urban infrastructure net deeply into the slums to assimilate them into the city rather than lock them in as disadvantaged islands. Further, it transcends resource barriers and 'aid' through innovative partnerships and the latent resource mobilisation potential of the so-called 'poor'. This paper examines Slum Networking as implemented in Sanjaynagar in Ahmedabad, India and compares it with a similar settlement with no interventions in Ahmedabad. It assesses the knock-on impact of physical infrastructure on health, education and poverty. Finally, it evaluates the multiplier effect of physical infrastructure and the partnerships on the subsequent investments by the community in its own shelter and habitat. Copyright © 2009 Inderscience Enterprises Ltd.
Resumo:
Product innovativeness is a primary contingent factor to be addressed for the development of flexible management for the front-end. However, due to complexity of this early phase of the innovation process, the definition of which attributes to customise is critical to support a contingent approach. Therefore, this study investigates front-end attributes that need to be customised to permit effective management for different degrees of innovation. To accomplish this aim, a literature review and five case studies were performed. The findings highlighted the front-end strategic and operational levels as factors influencing the front-end attributes related to product innovativeness. In conclusion, this study suggests that two front-end attributes should be customised: development activities and decision-making approach. Copyright © 2011 Inderscience Enterprises Ltd.
Resumo:
Choosing a project manager for a construction project—particularly, large projects—is a critical project decision. The selection process involves different criteria and should be in accordance with company policies and project specifications. Traditionally, potential candidates are interviewed and the most qualified are selected in compliance with company priorities and project conditions. Precise computing models that could take various candidates’ information into consideration and then pinpoint the most qualified person with a high degree of accuracy would be beneficial. On the basis of the opinions of experienced construction company managers, this paper, through presenting a fuzzy system, identifies the important criteria in selecting a project manager. The proposed fuzzy system is based on IF-THEN rules; a genetic algorithm improves the overall accuracy as well as the functions used by the fuzzy system to make initial estimates of the cluster centers for fuzzy c-means clustering. Moreover, a back-propagation neutral network method was used to train the system. The optimal measures of the inference parameters were identified by calculating the system’s output error and propagating this error within the system. After specifying the system parameters, the membership function parameters—which by means of clustering and projection were approximated—were tuned with the genetic algorithm. Results from this system in selecting project managers show its high capability in making high-quality personnel predictions