45 resultados para Divorce settlements
em Cambridge University Engineering Department Publications Database
Resumo:
This paper considers how the provision of integrated household-level infrastructure – particularly water and environmental sanitation (including water supply, sewerage, roads, storm drainage and solid waste management) –can play a leading role in improving the conditions in slum settlements. Around 700 socio-economic interviews were carried out in India and South Africa to investigate an innovative approach called slum networking, which sees the strong correlation between slum locations and drainage paths as an opportunity for improving the wider urban environment. This recognition allows resources to be mobilised locally, thereby removing the need for external aid funding. The evidence from the 700 families shows that communities perceive water and sanitation inputs to be their top priority and are willing to contribute to the costs. If slum upgrading is led with access to integrated water and environmental sanitation at household level with community contributions to the cost of infrastructure, then slum communities subsequently invest considerably greater sums in improved housing and education, with longer term contributions to poverty alleviation, improvements in health and literacy and an increase in disposable incomes.
Resumo:
The assessment of settlement induced damage on buildings during the preliminary phase of tunnel excavation projects, is nowadays receiving greater attention. Analyses at different levels of detail are performed on the surface building in proximity to the tunnel, to evaluate the risk of structural damage and the need of mitigation measures. In this paper, the possibility to define a correlation between the main parameters that influence the structural response to settlement and the potential damage is investigated through numerical analysis. The adopted 3D finite element model allows to take into account important features that are neglected in more simplified approaches, like the soil-structure interaction, the nonlinear behaviour of the building, the three dimensional effect of the tunnelling induced settlement trough and the influence of openings in the structure. Aim of this approach is the development of an improved classification system taking into account the intrinsic vulnerability of the structure, which could have a relevant effect on the final damage assessment. Parametric analyses are performed, focusing on the effect of the orientation and the position of the structure with respect to the tunnel. The obtained results in terms of damage are compared with the Building Risk Assessment (BRA) procedure. This method was developed by Geodata Engineering (GDE) on the basis of empirical observations and building monitoring and applied during the construction of different metro lines in urban environment. The comparison shows a substantial agreement between the two procedures on the influence of the analysed parameters. The finite element analyses suggest a refinement of the BRA procedure for pure sagging conditions.
Resumo:
Soil liquefaction continues to be a major source of damage to buildings and infrastructure after major earthquake events. Ground improvement methods are widely used at many sites worldwide as a way of mitigating liquefaction damage. The relative success of these ground improvement methods in preventing damage after a liquefaction event and the mechanisms by which they can mitigate liquefaction continue to be areas of active research. In this paper the emphasis is on the use of dynamic centrifuge modelling as a tool to investigate the effectiveness of ground improvement methods in mitigating liquefaction risk. Three different ground improvement methods will be considered. First, the effectiveness of in situ densification as a liquefaction resistance measure will be investigated. It will be shown that the mechanism by which soil densification offers mitigation of the liquefaction risk can be studied at a fundamental level using dynamic centrifuge modelling. Second, the use of drains to relieve excess pore pressures generated during an earthquake event will be considered. It will be shown that current design methods can be further improved by incorporating the understanding obtained from dynamic centrifuge tests. Finally, the use of soil grouting to mitigate liquefaction risk will be investigated. It will be shown that by grouting the foundation soil, the settlement of a building can be reduced following earthquake loading. However, the grouting depth must extend the whole depth of the liquefiable layer to achieve this reduction in settlements.
Resumo:
This paper describes four centrifuge tests investigating the performance of non-structural inclined micro-piles as a liquefaction remediation method for existing buildings. Two soil profiles with the same superstructure founded on each were tested under earthquakes of different magnitudes and durations. The first profile consisted of a deep, homogeneous layer of loose, liquefiable sand. The second comprised a shallow layer of loose sand overlying dense sand. Centrifuge tests were carried out with and without inclined micro-piles in each soil profile. The superstructure was modelled as an idealised single degree of freedom (SDOF) system. It is found that the micro-piles have no detrimental effect on the performance of the structure during and after earthquakes. It is also possible that their presence may decrease structural settlements in earthquakes which cause liquefaction to a depth less than that of the improved zone. However, no conclusive evidence is obtained to show that the micro-piles significantly restrain lateral soil movement due to monotonic shearing from the structure or impede the migration of excess pore pressures from the free field to the foundation zone. Both these processes have critical effects on structural settlement. The use of inclined micro-piles for liquefaction remediation should therefore be considered with caution.
Resumo:
Many piled foundations have been destroyed under significant cyclic loads in earthquakes. Centrifuge modelling of a single pile subjected to cyclic loads has been conducted to investigate the influence of cyclic loads on the axial performance of the single pile. Different pile installation procedures were applied to compare the axial behaviour of different piles under cyclic loads. Pile head permanent settlements accumulated due to cyclic axial loads, and these increased with the increasing load amplitude. Also the pile head axial secant stiffness decreased with the increasing number of axial load cycles, and with increasing amplitude. Furthermore, the axial pile performance is influenced significantly by different installation methods. © 2010 ASCE.
Resumo:
Many typical liquefaction remediation techniques are not appropriate for application under existing buildings and more novel techniques are required. This paper describes centrifuge tests investigating the performance of cementation as a liquefaction remediation method. Two soil profiles with the same superstructure were tested under earthquake shaking. The first profile consisted of a deep layer of loose, liquefiable sand. The second comprised a shallow layer of loose sand overlying dense sand. Centrifuge tests were carried out with a cemented zone underneath the structure, through the full depth of the liquefiable layers and also partial depth. The superstructure was modelled as a single-degree-offreedom system. It is found that a cemented zone through the full depth of a liquefiable layer results in considerable reduction of structural settlements. Increased magnitude and higher frequency accelerations are transmitted to the structure but, depending on the building characteristics, it is likely that improved overall seismic performance can be achieved. Improvements in structural settlements can also be obtained with partialdepth remediation, if the depth of the cemented zone is greater than the depth of liquefaction. This type of remediation seems to have little effect on the accelerations transmitted to the structure.
Resumo:
The Fort Canning Tunnel is the first road tunnel in Singapore to be built using the sprayed concrete lining (SCL) method. The major technical challenge of this was to construct a 15m wide tunnel by mining in soft ground under a shallow overburden of 3m to 9m. This paper describes the geotechnical investigations and monitoring controls for the safe and progressive execution of the works, such as soil investigations, trial forepoling works, surface settlement monitoring, tunnel settlement monitoring, face movement monitoring, and the observational approach to construction. The monitored field data showed the volume loss to range from 0.4% to 2.1%, and the observed surface settlement trough was found to agree well with the theoretical Gaussian trough. Other observations made include substantial surface settlements induced by the stress relief at and ahead of the tunnel face in spite of the forepoling umbrella, and the higher volume losses associated with higher overburden. Tunnel face movements were observed during installation of forepoling. These observations are of interest to engineers planning future SCL tunnels in similar conditions.