4 resultados para Control measures

em Cambridge University Engineering Department Publications Database


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Uniquely, China employs MgO already contained in cement clinker or as an expansive additive to compensate for the thermal shrinkage of mass concrete, particularly dam concrete, with almost 40 years' experience in both research activities and industrial applications. Compensating shrinkage with expansion produced by MgO has been proved to effectively prevent thermal cracking of mass concrete, and reduce the cost of temperature control measures and speed up the construction process. Moreover, the expansion properties of MgO could be designed flexibly, through adjusting its microstructure by changing the calcination conditions (calcining temperature and residence time). The collective knowledge and experience of MgO expansive cement and concrete is worthy of sharing with relevant engineers and researchers globally but dissemination has been hindered as most of the relevant literature is published in Chinese. This paper reviews the history, state-of-the-art progress and future research needs in the field of MgO expansive cement and concrete. © 2013 Elsevier Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: After investing significant amounts of time and money in conducting formal risk assessments, such as root cause analysis (RCA) or failure mode and effects analysis (FMEA), healthcare workers are left to their own devices in generating high-quality risk control options. They often experience difficulty in doing so, and tend toward an overreliance on administrative controls (the weakest category in the hierarchy of risk controls). This has important implications for patient safety and the cost effectiveness of risk management operations. This paper describes a before and after pilot study of the Generating Options for Active Risk Control (GO-ARC) technique, a novel tool to improve the quality of the risk control options generation process. OUTCOME MEASURES: The quantity, quality (using the three-tiered hierarchy of risk controls), variety, and novelty of risk controls generated. RESULTS: Use of the GO-ARC technique was associated with improvement on all measures. CONCLUSIONS: While this pilot study has some notable limitations, it appears that the GO-ARC technique improved the risk control options generation process. Further research is needed to confirm this finding. It is also important to note that improved risk control options are a necessary, but not sufficient, step toward the implementation of more robust risk controls.