3 resultados para CPM
em Cambridge University Engineering Department Publications Database
Resumo:
A dynamic programming algorithm for joint data detection and carrier phase estimation of continuous-phase-modulated signal is presented. The intent is to combine the robustness of noncoherent detectors with the superior performance of coherent ones. The algorithm differs from the Viterbi algorithm only in the metric that it maximizes over the possible transmitted data sequences. This metric is influenced both by the correlation with the received signal and the current estimate of the carrier phase. Carrier-phase estimation is based on decision guiding, but there is no external phase-locked loop. Instead, the phase of the best complex correlation with the received signal over the last few signaling intervals is used. The algorithm is slightly more complex than the coherent Viterbi algorithm but does not require narrowband filtering of the recovered carrier, as earlier appproaches did, to achieve the same level of performance.
Resumo:
Engineering changes (ECs) are essential in complex product development, and their management is a crucial discipline for engineering industries. Numerous methods have been developed to support EC management (ECM), of which the change prediction method (CPM) is one of the most established. This article contributes a requirements-based benchmarking approach to assess and improve existing methods. The CPM is selected to be improved. First, based on a comprehensive literature survey and insights from industrial case studies, a set of 25 requirements for change management methods are developed. Second, these requirements are used as benchmarking criteria to assess the CPM in comparison to seven other promising methods. Third, the best-in-class solutions for each requirement are investigated to draw improvement suggestions for the CPM. Finally, an enhanced ECM method which implements these improvements is presented. © 2013 © 2013 The Author(s). Published by Taylor & Francis.