19 resultados para Arbitrate Contract
em Cambridge University Engineering Department Publications Database
Resumo:
This paper is concerned with the role of information in the servitization of manufacturing which has led to “the innovation of an organisation’s capabilities and processes as equipment manufacturers seek to offer services around their products” (Neely 2009, Baines et al 2009). This evolution has resulted in an information requirement (IR) shift as companies move from discrete provision of equipment and spare parts to long-term service contracts guaranteeing prescribed performance levels. Organisations providing such services depend on a very high level of availability and quality of information throughout the service life-cycle (Menor et al 2002). This work focuses on whether, for a proposed contract based around complex equipment, the Information System is capable of providing information at an acceptable quality and requires the IRs to be examined in a formal manner. We apply a service information framework (Cuthbert et al 2008, McFarlane & Cuthbert 2012) to methodically assess IRs for different contract types to understand the information gap between them. Results from case examples indicate that this gap includes information required for the different contract types and a set of contract-specific IRs. Furthermore, the control, ownership and use of information differs across contract types as the boundary of operation and responsibility changes.
Resumo:
In a previous study [M. Hameed, J. Fluid Mech. 594, 307 (2008)] the authors investigated the influence of insoluble surfactant on the evolution of a stretched, inviscid bubble surrounded by a viscous fluid via direct numerical simulation of the Navier-Stokes equations, and showed that the presence of surfactant can cause the bubble to contract and form a quasisteady slender thread connecting parent bubbles, instead of proceeding directly toward pinch-off as occurs for a surfactant-free bubble. Insoluble surfactant significantly retards pinch-off and the thread is stabilized by a balance between internal pressure and reduced capillary pressure due to a high concentration of surfactant that develops during the initial stage of contraction. In the present study we investigate the influence of surfactant solubility on thread formation. The adsorption-desorption kinetics for solubility is in the diffusion controlled regime. A long-wave model for the evolution of a capillary jet is also studied in the Stokes flow limit, and shows dynamics that are similar to those of the evolving bubble. With soluble surfactant, depending on parameter values, a slender thread forms but can pinch-off later due to exchange of surfactant between the interface and exterior bulk flow. © 2009 American Institute of Physics.
Resumo:
The CTRL Contract 220 covered 7.5km twin-bore tunnels excavated between late 2002 and early 2004 from Stratford Box to St Pancras station in Central London. To ensure efficient machine operation as well as the transport and disposal of soil, soil conditioning treatments were applied. Specifically, the foam injection ratio (FIR) and the polymer injection ratio (PIR) (injected volume of foam and polymer solution expressed as a percentage of the excavated soil volume) were employed. It was found that carefully selected soil conditioning allowed chamber pressures of 200kPa or more to be accurately controlled in the stiff London Clay and to an extent, in the very stiff clays of the Lambeth Group. Average FIRs of 50% and PIRs of 7 and 9% were used in the Thanet Sand and in the Lambeth Group Clays. In contrast, much lower quantities of foam were used in the London Clay.
Resumo:
Humans are able to learn tool-handling tasks, such as carving, demonstrating their competency to make movements in unstable environments with varied directions. When faced with a single direction of instability, humans learn to selectively co-contract their arm muscles tuning the mechanical stiffness of the limb end point to stabilize movements. This study examines, for the first time, subjects simultaneously adapting to two distinct directions of instability, a situation that may typically occur when using tools. Subjects learned to perform reaching movements in two directions, each of which had lateral instability requiring control of impedance. The subjects were able to adapt to these unstable interactions and switch between movements in the two directions; they did so by learning to selectively control the end-point stiffness counteracting the environmental instability without superfluous stiffness in other directions. This finding demonstrates that the central nervous system can simultaneously tune the mechanical impedance of the limbs to multiple movements by learning movement-specific solutions. Furthermore, it suggests that the impedance controller learns as a function of the state of the arm rather than a general strategy. © 2011 the American Physiological Society.
Resumo:
The phases of the outsourcing process and the actions required are discussed. The most difficult and the most important phase of o a successful outsourcing process is to know what activities to outsource. The criteria for suppliers selection must be developed and should cover the reasons why the activity is being outsourced, the expected benefits and potential dangers. Contract negotiation is a very important phase of the outsourcing contract in which rules of the outsourcing are set. The transfer of activity phase corresponds to the reassignment of control of the outsourced activity from the outsourcer to the contractor.
Resumo:
We study three contractual arrangements—co-development, licensing, and co-development with opt-out options—for the joint development of new products between a small and financially constrained innovator firm and a large technology company, as in the case of a biotech innovator and a major pharma company. We formulate our arguments in the context of a two-stage model, characterized by technical risk and stochastically changing cost and revenue projections. The model captures the main disadvantages of traditional co-development and licensing arrangements: in co-development the small firm runs a risk of running out of capital as future costs rise, while licensing for milestone and royalty (M&R) payments, which eliminates the latter risk, introduces inefficiency, as profitable projects might be abandoned. Counter to intuition we show that the biotech's payoff in a licensing contract is not monotonically increasing in the M&R terms. We also show that an option clause in a co-development contract that gives the small firm the right but not the obligation to opt out of co-development and into a pre-agreed licensing arrangement avoids the problems associated with fully committed co-development or licensing: the probability that the small firm will run out of capital is greatly reduced or completely eliminated and profitable projects are never abandoned.
Resumo:
Services based around complex engineering equipment and systems provide substantial challenges in both the long-term management of the equipment and the need for guaranteed delivery of the related service. One of the challenges for an organisation providing these services is the management of the information that is required to design, deliver and subsequently assess the success of the service. To assist in this process this paper develops a model for capturing, organising and assessing information requirements for these Complex Engineering Services in which information required to support key decisions in the life cycle of the service is identified. The model – referred to as The 12-Box Model for Service Information Requirements – is embedded in a three-phase procedure for providing an assessment of information requirements of a service contract which also provides insight into the capabilities of available information systems in supporting the contract. An illustrative example examining service information in an aircraft availability contract is used to demonstrate the use of the 12-Box Model and associated assessment procedure.
Resumo:
Historically, waste pickers around the globe have utilised urban solid waste as a principal source of livelihood. Formal waste management sectors usually perceive the informal waste collection/recycling networks as backward, unhygienic and generally incompatible with modern waste management systems. It is proposed here that through careful planning and administration, these seemingly troublesome informal networks can be integrated into formal waste management systems in developing countries, providing mutual benefits. A theoretical framework for integration based on a case study in Lahore, Pakistan, is presented. The proposed solution suggests that the municipal authority should draw up and agree on a formal work contract with the group of waste pickers already operating in the area. The proposed system is assessed using the integration radar framework to classify and analyse possible intervention points between the sectors. The integration of the informal waste workers with the formal waste management sector is not a one dimensional or single step process. An ideal solution might aim for a balanced focus on all four categories of intervention, although this may be influenced by local conditions. Not all the positive benefits will be immediately apparent, but it is expected that as the acceptance of such projects increases over time, the informal recycling economy will financially supplement the formal system in many ways.