Previous research into the behaviour of piled foundations in laterally-spreading soil deposits has concentrated on pile groups that carry small or negligible axial loads. This paper presents dynamic centrifuge test results for 2 x 2 pile groups with bending and geometric properties similar to real 0.5 m diameter tubular steel and solid circular reinforced-concrete field piles. Axial loads applied represented upper-bounds on typical working loads. The simultaneous scaling of the relevant properties controlling both lateral and axial behaviour allows comparisons to be drawn regarding the particular mechanisms of failure that would dominate for each type of pile. Flexible reinforced-concrete piles which tend to carry lower loads were found to be dominated by lateral effects, while steel piles, which are much stiffer and usually carry greater loads are dominated by settlement considerations. © 2006 Taylor & Francis Group.
Resumo:
Many piled foundations have been destroyed under significant cyclic loads in earthquakes. Centrifuge modelling of a single pile subjected to cyclic loads has been conducted to investigate the influence of cyclic loads on the axial performance of the single pile. Different pile installation procedures were applied to compare the axial behaviour of different piles under cyclic loads. Pile head permanent settlements accumulated due to cyclic axial loads, and these increased with the increasing load amplitude. Also the pile head axial secant stiffness decreased with the increasing number of axial load cycles, and with increasing amplitude. Furthermore, the axial pile performance is influenced significantly by different installation methods. © 2010 ASCE.
Resumo:
Piles passing through sloping liquefiable deposits are prone to lateral loading if these deposits liquefy and flow during earthquakes. These lateral loads caused by the relative soil-pile movement will induce bending in the piles and may result in failure of the piles or excessive pile-head displacement. Whilst the weak nature of the flowing liquefied soil would suggest that only small loads would be exerted on the piles, it is known from case histories that piles do fail owing to the influence of laterally spreading soils. It will be shown, based on dynamic centrifuge test data, that dilatant behaviour of soil close to the pile is the major cause of these considerable transient lateral loads which are transferred to the pile. This paper reports the results of geotechnical centrifuge tests in which models of gently sloping liquefiable sand with pile foundations passing through them were subjected to earthquake excitation. The soil close to the pile was instrumented with pore-pressure transducers and contact stress cells in order to monitor the interaction between soil and pile and to track the soil stress state both upslope and downslope of the pile. The presence of instrumentation measuring pore-pressure and lateral stress close to the pile in the research described in this paper gives the opportunity to better study the soil stress state close to the pile and to compare the loads measured as being applied to the piles by the laterally spreading soils with those suggested by the JRA design code. This test data shows that lateral stresses much greater than one might expect from calculations based on the residual strength of liquefied soil may be applied to piles in flowing liquefied slopes owing to the dilative behaviour of the liquefied soil. It is shown at least for the particular geometry studied that the current JRA design code can be un-conservative by a factor of three for these dilation-affected transient lateral loads.
Resumo:
Energy Piles present an efficient solution for long-term carbon emission reduction and sustainable construction. However, they have received only partial acceptance by the industry, because of concerns regarding the impact of cyclic thermal changes on the serviceability of energy pile foundations. This paper investigates the applicability of the hybrid load transfer approach to load-settlement analysis of single piles behavior during thermal energy exchange processes. Back-analysis results in terms of the thermal and mechanical response of energy piles show good agreement with field test results from Lambeth College in London. © ASCE 2011.
Resumo:
Pile reuse has become an increasingly popular option in foundation design, mainly due to its potential cost and environmental benefits and the problem of underground congestion in urban areas. However, key geotechnical concerns remain regarding the behavior of reused piles and the modeling of foundation systems involving old and new piles to support building loads of the new structure. In this paper, a design and analysis tool for pile reuse projects will be introduced. The tool allows coupling of superstructure stiffness with the foundation model, and includes an optimization algorithm to obtain the best configuration of new piles to work alongside reused piles. Under the concept of Pareto Optimality, multi-objective optimization analyses can also reveal the relationship between material usage and the corresponding foundation performance, providing a series of reuse options at various foundation costs. The components of this analysis tool will be discussed and illustrated through a case history in London, where 110 existing piles are reused at a site to support the proposed new development. The case history reveals the difficulties faced by foundation reuse in urban areas and demonstrates the application of the design tool to tackle these challenges. © ASCE 2011.
Resumo:
Centrifuge testing has been undertaken to investigate instability failure of pile groups during seismic liquefaction, with specific reference to the 'top-down' propagation of liquefaction during the earthquake and to account for initial imperfections in pile geometry. The results of these tests were used to validate numerical models within the finite element program ABAQUS, based on the popular p-y analysis method. Pseudostatic classical and post-buckling analyses were conducted to examine the collapse behaviour of the pile groups and were found to give reasonable predictions of collapse load and conservative predictions of the associated deflection conditions. This numerical model was compared to currently published methods which were found to over-predict collapse loads. The resulting insights into the collapse of axially loaded pile groups revealed that the failure load is strongly dependent on both the depth of liquefaction propagation and initial imperfections, which reduce the collapse load.
Resumo:
This paper examines the settlement of instrumented 2 × 2 model pile groups in liquefiable soil based on the results of dynamic centrifuge tests. The piles are end-bearing in dense sand, and are instrumented such that base, shaft and total pile load components can be measured. The data suggest that the overall co-seismic group settlement is accrued from incremental settlements of the individual piles as the group rocks under the action of the kinematic and inertial lateral loads. A Newmarkian framework for describing this behaviour is presented in which permanent settlement is incremented whenever the load in any of the piles exceeds the capacity of the soil to support the pile. This bearing capacity of the piles in liquefied soil is estimated based on measured dynamic soil properties during shaking and observations of the changes in load carried by the piles. The contribution of the pile cap in reducing settlement is also discussed. © 2008 ASCE.
Resumo:
The creep effects on sequentially built bridges are analysed by the theory of thermal creep. Two types of analysis are used: time dependent and steady state. The traditional uniform creep analysis is also introduced briefly. Both simplified and parabolic normalising creep-temperature functions are used in the analysis for comparison. Numerical examples are presented, calculated by a computer program based on the theory of thermal creep and using the displacement method. It is concluded that different assumptions within thermal creep can lead to very different results when compared with uniform creep analysis. The steady-state analysis of monolithically built structures can serve as a limit to evaluate total creep effects for both monolithically and sequentially built structures. The importance of the correct selection of the normalising creep-temperature function is demonstrated.
Resumo:
In current practice the strength evaluation of a bridge system is typically based on firstly using elastic analysis to determine the distribution of load effects in the elements and then checking the ultimate section capacity of those elements. Ductility of the components in most bridge structures permits local yield and subsequent redistribution of the applied loads from the most heavily loaded elements. As a result a bridge can continue to carry additional loading even after one member has yielded, which has conventionally been adopted as the "failure criterion" in bridge strength evaluation. This means that a bridge with inherent redundancy has additional reserves of strength such that the failure of one element does not result in the failure of the complete system. For these bridges warning signs will show up and measures can be undertaken before the ultimate collapse is happening. This paper proposes a rational methodology for calculating the ultimate system strength and including in bridge evaluation the warning level due to redundancy. © 2004 Taylor & Francis Group, London.
Resumo:
Previous research into the behaviour of piled foundations in laterally-spreading soil deposits has concentrated on pile groups that carry small or negligible axial loads. This paper presents dynamic centrifuge test results for 2×2 pile groups with bending and geometric properties similar to real 0.5m diameter tubular steel and solid circular reinforced-concrete field piles. Axial loads applied represented upper-bounds on typical working loads. The simultaneous scaling of the relevant properties controlling both lateral and axial behaviour allows comparisons to be drawn regarding the particular mechanisms of failure that would dominate for each type of pile. Flexible reinforced-concrete piles which tend to carry lower loads were found to be dominated by lateral effects, while steel piles, which are much stiffer and usually carry greater loads are dominated by settlement considerations. © 2006 Taylor & Francis Group, London.
Resumo:
Numerous piles are often subjected to the combination of cyclic axial and cyclic lateral loads in service, such as piled foundations for offshore platforms which may suffer swaying and rocking motions owing to wind and wave actions. In this research, centrifuge tests were conducted to investigate the effect of previous cyclic axial loads on the performance of pile groups subjected to subsequent cyclic lateral loads. Different pile installation methods were also applied to study the different behaviour of bored and jacked pile groups subjected to cyclic loads. During lateral load cycling, it is seen that cyclic axial loads to which pile groups were previously subjected could reduce the pile cap permanent lateral displacement in the first lateral load cycle but do not influence the incremental rate of permanent displacement in the following lateral load cycles. Moreover, it is found that previous cyclic axial loads could improve the pile cap cyclic lateral secant stiffness, especially for the pre-jacked pile group. When rocking motions were induced by cyclic lateral loads, pile groups subjected to cyclic axial loads before have smaller permanent settlement than those without the cyclic axial loading effect. The designers of piles that are intended to resist significant lateral loads without excessive deformations in service may wish to deploy cyclic axial preloading, accordingly.
Resumo:
The widespread use of piled foundations in areas prone to liquefaction has led to significant research being carried out to understand their behaviour during earthquakes. A key challenge inmodelling this problemin a centrifuge is the installation procedure, and in most dynamic centrifuge experiments piles are installed before the test commences, either pushing the piles at 1g, or fixing the piles in the model and the sand poured around them. In this paper, a series of dynamic centrifuge experiments are described in which a 2 × 2 pile group is pushed into the model before the test begins and also once the centrifuge has reached the test acceleration. The paper focuses on the key differences which were observed in the pile group's response to the earthquake motion, and in particular, the very different settlement responses of the pile groups.