86 resultados para Malvinas Ward


Relevância:

10.00% 10.00%

Publicador:

Resumo:

As part of the investigations into a surgical incident involving the accidental retention inside a patient's venous system of a guide wire for central venous catheterisation (CVC), the Human Error Assessment and Reduction Technique (HEART) was used to examine the potential for further occurrences. It was found to be time-efficient and to yield plausible probabilities of human error, although its use in healthcare has challenges, suggesting adaptation would be beneficial.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In recent years, the healthcare sector has adopted the use of operational risk assessment tools to help understand the systems issues that lead to patient safety incidents. But although these problem-focused tools have improved the ability of healthcare organizations to identify hazards, they have not translated into measurable improvements in patient safety. One possible reason for this is a lack of support for the solution-focused process of risk control. This article describes a content analysis of the risk management strategies, policies, and procedures at all acute (i.e., hospital), mental health, and ambulance trusts (health service organizations) in the East of England area of the British National Health Service. The primary goal was to determine what organizational-level guidance exists to support risk control practice. A secondary goal was to examine the risk evaluation guidance provided by these trusts. With regard to risk control, we found an almost complete lack of useful guidance to promote good practice. With regard to risk evaluation, the trusts relied exclusively on risk matrices. A number of weaknesses were found in the use of this tool, especially related to the guidance for scoring an event's likelihood. We make a number of recommendations to address these concerns. The guidance assessed provides insufficient support for risk control and risk evaluation. This may present a significant barrier to the success of risk management approaches in improving patient safety. © 2013 Society for Risk Analysis.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This book presents the proceedings of the international conference on Contemporary Ergonomics and Human Factors 2013.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Inclusive design has unique challenges because it aims to improve usability for a wide range of users. This typically includes people with lower levels of ability, as well as mainstream users. This paper examines the effectiveness of two methods that are used in inclusive design: user trials and exclusion calculations (an inclusive design inspection method). A study examined three autoinjectors using both methods (n=30 for the user trials). The usability issues identified by each method are compared and the effectiveness of the methods is discussed. The study found that each method identified different kinds of issues, all of which are important for inclusive design. We therefore conclude that a combination of methods should be used in inclusive design rather than relying on a single method. Recommendations are also given for how the individual methods can be used more effectively in this context.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BACKGROUND: After investing significant amounts of time and money in conducting formal risk assessments, such as root cause analysis (RCA) or failure mode and effects analysis (FMEA), healthcare workers are left to their own devices in generating high-quality risk control options. They often experience difficulty in doing so, and tend toward an overreliance on administrative controls (the weakest category in the hierarchy of risk controls). This has important implications for patient safety and the cost effectiveness of risk management operations. This paper describes a before and after pilot study of the Generating Options for Active Risk Control (GO-ARC) technique, a novel tool to improve the quality of the risk control options generation process. OUTCOME MEASURES: The quantity, quality (using the three-tiered hierarchy of risk controls), variety, and novelty of risk controls generated. RESULTS: Use of the GO-ARC technique was associated with improvement on all measures. CONCLUSIONS: While this pilot study has some notable limitations, it appears that the GO-ARC technique improved the risk control options generation process. Further research is needed to confirm this finding. It is also important to note that improved risk control options are a necessary, but not sufficient, step toward the implementation of more robust risk controls.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A methodology for the analysis of building energy retrofits has been developed for a diverse set of buildings at the Royal Botanic Gardens (RBG), Kew in southwest London, UK. The methodology requires selection of appropriate building simulation tools dependent on the nature of the principal energy demand. This has involved the development of a stand-alone model to simulate the heat flow in botanical glasshouses, as well as stochastic simulation of electricity demand for buildings with high equipment density and occupancy-led operation. Application of the methodology to the buildings at RBG Kew illustrates the potential reduction in energy consumption at the building scale achievable from the application of retrofit measures deemed appropriate for heritage buildings and the potential benefit to be gained from onsite generation and supply of energy. © 2014 Elsevier Ltd.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BACKGROUND: Central Venous Catheterisation (CVC) has occasionally been associated with cases of retained guidewires in patients after surgery. In theory, this is a completely avoidable complication; however, as with any human procedure, operator error leading to guidewires being occasionally retained cannot be fully eliminated. OBJECTIVE: The work described here investigated the issue in an attempt to better understand it both from an operator and a systems perspective, and to ultimately recommend appropriate safe design solutions that reduce guidewire retention errors. METHODS: Nine distinct methods were used: observations of the procedure, a literature review, interviewing CVC end-users, task analysis construction, CVC procedural audits, two human reliability assessments, usability heuristics and a comprehensive solution survey with CVC end-users. RESULTS: The three solutions that operators rated most highly, in terms of both practicality and effectiveness, were: making trainees better aware of the potential guidewire complications and strongly emphasising guidewire removal in CVC training, actively checking that the guidewire is present in the waste tray for disposal, and standardising purchase of central line sets so that differences that may affect chances of guidewire loss is minimised. CONCLUSIONS: Further work to eliminate/engineer out the possibility of guidewires being retained is proposed.