120 resultados para Cost projections
Resumo:
The feasibility of utilising low-cost, un-cooled vertical cavity surface-emitting lasers (VCSELs) as intensity modulators in real-time optical OFDM (OOFDM) transceivers is experimentally explored, for the first time, in terms of achievable signal bit rates, physical mechanisms limiting the transceiver performance and performance robustness. End-to-end real-time transmission of 11.25 Gb/s 64-QAM-encoded OOFDM signals over simple intensity modulation and direct detection, 25 km SSMF PON systems is experimentally demonstrated with a power penalty of 0.5 dB. The low extinction ratio of the VCSEL intensity-modulated OOFDM signal is identified to be the dominant factor determining the maximum obtainable transmission performance. Experimental investigations indicate that, in addition to the enhanced transceiver performance, adaptive power loading can also significantly improve the system performance robustness to variations in VCSEL operating conditions. As a direct result, the aforementioned capacity versus reach performance is still retained over a wide VCSEL bias (driving) current (voltage) range of 4.5 mA to 9 mA (275 mVpp to 320 mVpp). This work is of great value as it demonstrates the possibility of future mass production of cost-effective OOFDM transceivers for PON applications.
Resumo:
Low-cost, narrow modulation bandwidth, un-cooled VCSELs can be utilized to directly modulate 64-QAM-encoded 11.25Gb/s signals for end-to-end real-time optical OFDM transmission over 25km SSMF IMDD systems with excellent performance robustness. © 2011 Optical Society of America.
Resumo:
It is demonstrated that doubling the sampling rate recovers some of the loss in capacity incurred on the bandlimited Gaussian channel with a one-bit output quantizer. © 2010 IEEE.
Resumo:
Purpose - The purpose of this paper is to develop a framework of total acquisition cost of overseas outsourcing/sourcing in manufacturing industry. This framework contains categorized cost items that may occur during the overseas outsourcing/sourcing process. The framework was tested by a case study to establish both its feasibility and usability. Design/methodology/approach - First, interviews were carried out with practitioners who have the experience of overseas outsourcing/sourcing in order to obtain inputs from industry. The framework was then built up based on combined inputs from literature and from practitioners. Finally, the framework was tested by a case study in a multinational high-tech manufacturer to establish both its feasibility and usability. Findings - A practical barrier for implementing this framework is shortage of information. The predictability of the cost items in the framework varies. How to deal with the trade off between accuracy and applicability is a problem needed to be solved in the future research. Originality/value - There are always limitations to the generalizations that can be made from just one case. However, despite these limitations, this case study is believed to have shown the general requirement of modeling the uncertainty and dealing with the dilemma between accuracy and applicability in practice. © Emerald Group Publishing Limited.