85 resultados para minimalist hardware architecture
Resumo:
This paper proposes a method for extracting reliable architectural characteristics from complex porous structures using micro-computed tomography (μCT) images. The work focuses on a highly porous material composed of a network of fibres bonded together. The segmentation process, allowing separation of the fibres from the remainder of the image, is the most critical step in constructing an accurate representation of the network architecture. Segmentation methods, based on local and global thresholding, were investigated and evaluated by a quantitative comparison of the architectural parameters they yielded, such as the fibre orientation and segment length (sections between joints) distributions and the number of inter-fibre crossings. To improve segmentation accuracy, a deconvolution algorithm was proposed to restore the original images. The efficacy of the proposed method was verified by comparing μCT network architectural characteristics with those obtained using high resolution CT scans (nanoCT). The results indicate that this approach resolves the architecture of these complex networks and produces results approaching the quality of nanoCT scans. The extracted architectural parameters were used in conjunction with an affine analytical model to predict the axial and transverse stiffnesses of the fibre network. Transverse stiffness predictions were compared with experimentally measured values obtained by vibration testing. © 2011 Acta Materialia Inc. Published by Elsevier Ltd. All rights reserved.
Resumo:
RFID technology can be used to its fullest potential only with software to supplement the hardware with powerful capabilities for data capture, filtering, counting and storage. The EPCglobal Network architecture encourages minimizing the amount of business logic embedded in the tags, readers and middleware. This creates the need for a Business Logic Layer above the event filtering layer that enhances basic observation events with business context - i.e. in addition to the (what, when, where) information about an observation, it adds context information about why the object was there. The purpose of this project is to develop an implementation of the Business Logic Layer. This application accepts observation event data (e.g. from the Application Level Events (ALE) standard interface), enriches them with business context and provides these enriched events to a repository of business-level events (e.g. via the EPC Information Services (EPCIS) capture interface). The strength of the application lies in the automatic addition of business context. It is quick and easy to adapt any business process to the framework suggested and equally easy to reconfigure it if the business process is changed. A sample application has been developed for a business scenario in the retail sector.
Resumo:
The Internet of Things (IOT) concept and enabling technologies such as RFID offer the prospect of linking the real world of physical objects with the virtual world of information technology to improve visibility and traceability information within supply chains and across the entire lifecycles of products, as well as enabling more intuitive interactions and greater automation possibilities. There is a huge potential for savings through process optimization and profit generation within the IOT, but the sharing of financial benefits across companies remains an unsolved issue. Existing approaches towards sharing of costs and benefits have failed to scale so far. The integration of payment solutions into the IOT architecture could solve this problem. We have reviewed different possible levels of integration. Multiple payment solutions have been researched. Finally we have developed a model that meets the requirements of the IOT in relation to openness and scalability. It supports both hardware-centric and software-centric approaches to integration of payment solutions with the IOT. Different requirements concerning payment solutions within the IOT have been defined and considered in the proposed model. Possible solution providers include telcos, e-payment service providers and new players such as banks and standardization bodies. The proposed model of integrating the Internet of Things with payment solutions will lower the barrier to invoicing for the more granular visibility information generated using the IOT. Thus, it has the potential to enable recovery of the necessary investments in IOT infrastructure and accelerate adoption of the IOT, especially for projects that are only viable when multiple benefits throughout the supply chain need to be accumulated in order to achieve a Return on Investment (ROI). In a long-term perspective, it may enable IT-departments to become profit centres instead of cost centres. © 2010 - IOS Press and the authors. All rights reserved.
RE-DESIGNING PD PROCESS ARCHITECTURE BY TRANSFORMING TASK NETWORK MODELS INTO SYSTEM DYNAMICS MODELS
Resumo:
A scalable multi-channel optical regenerative bus architecture based on the use of polymer waveguides is presented for the first time. The architecture offers high-speed interconnection between electrical cards allowing regenerative bus extension with multiple segments and therefore connection of an arbitrary number of cards onto the bus. In a proof-ofprinciple demonstration, a 4-channel 3-card polymeric bus module is designed and fabricated on standard FR4 substrates. Low insertion losses (≤ -15 dB) and low crosstalk values (< -30 dB) are achieved for the fabricated samples while better than ± 6 μm -1 dB alignment tolerances are obtained. 10 Gb/s data communication with a bit-error-rate (BER) lower than 10-12 is demonstrated for the first time between card interfaces on two different bus modules using a prototype 3R regenerator. © 2012 Optical Society of America.
Resumo:
The composition of amorphous oxide semiconductors, which are well known for their optical transparency, can be tailored to enhance their absorption and induce photoconductivity for irradiation with green, and shorter wavelength light. In principle, amorphous oxide semiconductor-based thin-film photoconductors could hence be applied as photosensors. However, their photoconductivity persists for hours after illumination has been removed, which severely degrades the response time and the frame rate of oxide-based sensor arrays. We have solved the problem of persistent photoconductivity (PPC) by developing a gated amorphous oxide semiconductor photo thin-film transistor (photo-TFT) that can provide direct control over the position of the Fermi level in the active layer. Applying a short-duration (10 ns) voltage pulse to these devices induces electron accumulation and accelerates their recombination with ionized oxygen vacancy sites, which are thought to cause PPC. We have integrated these photo-TFTs in a transparent active-matrix photosensor array that can be operated at high frame rates and that has potential applications in contact-free interactive displays. © 2012 Macmillan Publishers Limited. All rights reserved.
Resumo:
This book explores the processes for retrieval, classification, and integration of construction images in AEC/FM model based systems. The author describes a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval that have been integrated into a novel method for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks. objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.
Resumo:
The Architecture, Engineering, Construction and Facilities Management (AEC/FM) industry is rapidly becoming a multidisciplinary, multinational and multi-billion dollar economy, involving large numbers of actors working concurrently at different locations and using heterogeneous software and hardware technologies. Since the beginning of the last decade, a great deal of effort has been spent within the field of construction IT in order to integrate data and information from most computer tools used to carry out engineering projects. For this purpose, a number of integration models have been developed, like web-centric systems and construction project modeling, a useful approach in representing construction projects and integrating data from various civil engineering applications. In the modern, distributed and dynamic construction environment it is important to retrieve and exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research demonstrated that a major hurdle in AEC/FM data integration in such systems is caused by its variety of data types and that a significant part of the data is stored in semi-structured or unstructured formats. Therefore, new integrative approaches are needed to handle non-structured data types like images and text files. This research is focused on the integration of construction site images. These images are a significant part of the construction documentation with thousands stored in site photographs logs of large scale projects. However, locating and identifying such data needed for the important decision making processes is a very hard and time-consuming task, while so far, there are no automated methods for associating them with other related objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.